← Back to Moscow

Document Moscow_doc_80281f75b3

Full Text

AGREEMENT FOR PROFESSIONAL ELECTRICAL ENGINEERING DESIGN SERVICES RELATED TO EMERGENCY POWER GENERATOR REPLACEMENT TO CITY OF MOSCOW FIRE STATION NO. 1 THIS AGREEMENT FOR PROFESSIONAL ELECTRICAL ENGINEERING DESIGN SERVICES RELATED TO EMERGENCY POWER GENERATOR REPLACEMENT TO CITY OF MOSCOW FIRE STATION NO. 1 (hereinafter "Agreement"), is made and entered into this ~day of 1~ O Wl '9-t.v 2013, by and between the City of Moscow, Idaho, a municipal corporation of the State of Idaho, 206 East Third Street, Moscow, Idaho, 83843 (hereinafter "CITY"), and AEI Engineering, Inc., 1910 Northwest Boulevard, Suite 201, Coeur d'Alene, Idaho, 83814 (hereinafter "ENGINEER"). WITNESSETH: WHEREAS, CITY desires to replace the existing stand-by generator at Fire Station No. 1; and WHEREAS, CITY requests a generator large enough to operate the entire Fire Station No. 1 in the event of a power outage; and WHEREAS, CITY has determined that AEI Engineering, Inc., is qualified to provide electrical engineering design services related to replacement of the existing stand-by generator (hereinafter "PROJECT"); and WHEREAS, CITY has selected the above-referenced ENGINEER to provide such electrical engineering design services; and WHEREAS, ENGINEER has prepared the Scope of Work which is incorporated into this Agreement; and WHEREAS, CITY wishes ENGINEER to complete the Scope of Work pursuant to this Agreement; NOW, THEREFORE, be it agreed that for and m consideration of the mutual covenants and promises between the parties hereto, that: SECTION I: SCOPE OF WORK A. ENGINEER Deliverables ENGINEER services will shall be responsible for the design, construction surveymg, and construction administration support for the PROJECT. 1. Approach And Deliverables: During the initial (pre-design) phase of PROJECT, ENGINEER shall meet with CITY to determine the specific design and operational requirements of the PROJECT. ENGINEER shall prepare detailed construction documents (plan and specifications) for competitive PROFESSION AL SERVICES AGREEMENT- AEI ENGINEERING. PAGE 1OF8 :2.0\ 3-11 ---PAGE BREAK--- bidding of PROJECT. ENGINEER shall answer questions from potential bidders and shall conduct a pre-bid conference. 2. Construction Administrative Support: ENGINEER shall assist with bid evaluation and shall perform submittal review of equipment and materials. ENGINEER shall answer all construction-related questions. ENGINEER support shall include site observation visits with reports during the construction period. 3. Design Tasks and Associated Deliverables for each Phase: Schematic Design Phase Tasks. ENGINEER shall a. participate in an initial PROJECT kick-off meeting with CITY; b. address the following design issues: stand-by generator size; taking into consideration the requirements of Fire Station # 1; and site constraints; including the impacts of noise and necessary access for maintenance; c. submit recommendations regarding basic equipment; and d. visit site to verify existing conditions. 4. Design Development Phase Tasks. ENGINEER shall: a. continue the development and expansion of approved Schematic Design Documents; b. provide outline specifications or material lists to establish criteria for electrical raceways, approximate sizes of major components, preliminary equipment layouts, and required space for equipment and clearances; and c. prepare Preliminary Engineers Opinion of Probable Electrical Construction Cost. 5. Construction Documents Phase Tasks. ENGINEER shall: a. prepare final calculations, drawings, and specifications based upon approved Design Development Documents; b. submit fifty percent (50%) CD (construction document), and ninety five percent (95%) CD (construction document) for review and coordination; c. finalize plans and specifications; d. submit final construction documents; and e. prepare Final Engineers Opinion of Probable Electrical Construction Cost. 6. Assistance During Bid Phase Tasks. ENGINEER shall: a. answer questions from bidding contractors; and b. prepare any necessary addenda to the bid documents to address issues that arise during the bid process. 7. Assistance During Construction Phase Tasks. ENGINEER shall: a. assist CITY with bid evaluation; b. submit reviews of construction material and equipment; c. participate in periodic construction meetings; d. process pay requests, ITC (instructions to contractor), CO (change order) and other paper work as required by CITY; and e. answer construction questions. PROFESSIONAL SERVICES AGREEMENT-AEI ENGINEERING. PAGE2 OF8 ---PAGE BREAK--- 8. Standards: ENGINEER shall perform this work in accordance with the applicable sections of the following standards organizations during the design of this PROJECT: NFPA No. 70 - National Electrical Code (NEC) Instrumentation Society of America (ISA) National Electrical Manufacturers Assoc. (NEMA) Underwriters Laboratories (UL) Institute of Electrical and Electronics Engineers (IEEE) American Water Works Association (AWWA) 9. Schedule: ENGINEER shall begin work on PROJECT upon notice to proceed. 10. Price And Terms Of Compensation: ENGINEER will perform its work on PROJECT on a time-and-materials basis, with a maximum not-to-exceed amount indicated in the attached fee estimate worksheet for the skill categories indicated. The estimated total amount for this work will not be exceeded without prior authorization from CITY. Invoices shall be sent indicating hours expended in each skill category with the appropriate rate and the total amount of the invoice. Invoices will be due and payable when received. A one and three quarters percentage (1.75%) fee may be added to the invoice after sixty (60) days. B. CITY Deliverables 1. CITY shall provide to ENGINEER, in relationship to the PROJECT, all necessary documents, permits, permissions, and authorities to complete the PROJECT as described. 2. CITY shall give ENGINEER reasonable access to Fire Station# 1. 3. CITY shall sign off on final documents, after approval by CITY Public Works Director. 4. CITY shall cause the PROJECT to be bid. It will also administer the PROJECT and inspect all construction work. 5. CITY shall cause the ENGINEER to prepare "as-built" drawings. SECTION II: A. Independent Contractor The contracting parties warrant by their signature that no employer/employee relationship is established between ENGINEER and CITY by the terms of this Agreement. It is understood by the parties hereto that ENGINEER is an independent contractor and as such neither it nor its employees, if any, are employees of CITY for purposes of tax, retirement system, or social security (FICA) withholding. B. Fees and Conditions for Engineering Design Services 1. Payment for all services described in this Agreement is provided in accordance with the cost described in the following Section II.B.2. 2. The cost for engineering design services for PROJECT as described in Section I, Scope of Work, is a not-to-exceed fee of Six Thousand Five Hundred Ninety Four and 28/100 Dollars ($6,594.28) with payment based on Exhibit Scope of Work, which shall include all fixed fees (profit), overhead, and direct costs. PROFESSIONAL SERVICES AGREEMENT-AEI ENGINEERING. PAGE3 OF8 ---PAGE BREAK--- 3. Bills submitted to CITY by ENGINEER shall list the individual performing the work and description of work performed. Bills shall be submitted on a basis to CITY Engineer for approval and payment. 4. Payment is due upon receipt of ENGINEER's statement(s), in accordance with CITY's regular payment processes. SECTION ill: A. Termination of Agreement This Agreement may be terminated by ENGINEER upon thirty (30) days written notice, should CITY fail to substantially perform in accordance with its terms through no fault of ENGINEER. CITY may terminate this Agreement with thirty (30) days notice without cause and without further liability to ENGINEER except as designated by this section. In the event of termination, ENGINEER shall be paid for services performed to the termination date, including direct expense and including a percentage of the fixed fee based upon the percentage of work completed. All working Drawings shall become the property of, and shall be surrendered to, CITY. B. Extent of Agreement This Agreement may be amended only by written instrument signed by both parties hereto. C. Data of Record CITY shall make available to ENGINEER all technical data of record in CITY's possession, including maps, surveys, and other information described in Section I. B. to ENGINEER supporting this PROJECT. D. Qualified Estimates of Cost The estimates of cost for PROJECT herein are to be prepared by ENGINEER through exercise of their experience and judgment in applying presently available cost data; but it is recognized that ENGINEER has no control over cost of labor and materials, or over competitive bidding procedures and market conditions so that they cannot warrant PROJECT construction costs will not vary from their cost estimates as a result of these described factors. Nothing in this paragraph shall serve to release or relieve ENGINEER from exercising the skill, care, and professional judgment exercised by similarly situated licensed professional engineers. E. Termination of PROJECT If any portion of PROJECT covered by this Agreement shall be suspended, abated, abandoned or terminated, CITY shall pay ENGINEER for the services rendered to the date of such suspended, abated, abandoned or terminated work; the payment to be based, insofar as possible, on the amounts established in this Agreement or, where the Agreement cannot be applied, the payment shall be based upon a reasonable estimate as mutually agreed upon between the two parties as to the percentage of the work completed. F. ENGINEER's Errors and Omissions Insurance In performance of professional services, ENGINEER will use that degree of care and skill ordinarily exercised under similar circumstances by members of the engineering profession; and no other warranty, either expressed or implied, is made in connection with rendering ENGINEER's services. Should ENGINEER or any of ENGINEER's agents or employees be found to have been negligent in the performance of professional services from which CITY PROFESSIONAL SERVICES AGREEMENT-AEI ENGINEERING. PAGE40F 8 ---PAGE BREAK--- sustains damage, ENGINEER has obtained Errors and Omissions Insurance in the amount of Five Hundred Thousand Dollars ($500,000), and said insurance shall be held active for a two year (minimum) period from the date of completion of PROJECT. CITY shall receive notice of any pending termination of said insurance within five days of first notice to ENGINEER. G. ENGINEER's Additional Insurance ENGINEER shall maintain Automobile Insurance and Statutory Workmen's Compensation Insurance coverage, Employer's Liability, and Comprehensive General Liability Insurance coverage. The Comprehensive General Liability Insurance shall have a minimum limit of Five Hundred Thousand Dollars ($500,000) per claim and One Million Dollars ($1,000,000) aggregate, and ENGINEER shall cause CITY to be named as an additional insured under said policy. H. Indemnification ENGINEER agrees, to the fullest extent permitted by law, to indemnify and hold harmless CITY against damages, liabilities and costs arising from the negligent acts of ENGINEER in the performance of professional services under this Agreement, to the extent that ENGINEER is responsible for such damages, liabilities and costs on a comparative basis of fault and responsibility between ENGINEER and CITY. ENGINEER shall not be obligated to indemnify CITY for CITY's sole negligence. I. Costs and Attorney Fees In the event either party incurs legal expenses to enforce the terms and conditions of this Agreement, the prevailing party is entitled to recover reasonable attorney's fees and other costs and expenses, whether the same are incurred with or without suit. J. Jurisdiction and Venue It is agreed that this Agreement shall be construed under and governed by the laws of the State of Idaho. In the event of litigation concerning this Agreement, it is agreed that proper venue shall be the District Court of the Second Judicial District of the State of Idaho, in and for the County of Latah. K. Binding of Successors CITY and ENGINEER each bind themselves, their partners, successors, assigns and legal representatives to the other parties to this Agreement and to the partner, successors, assigns and legal representatives of such other parties with respect to all covenants of this Agreement. L. Modification and Assignability of Agreement This Agreement contains the entire agreement between the parties concerning PROJECT, and no statements, promises, or inducements made by either party, or agents of either party, are valid or binding unless contained herein. This Agreement may not be enlarged, modified, or altered except upon written agreement signed by the parties hereto. ENGINEER may not subcontract or assign its rights (including the right to compensation) or duties arising hereunder without the prior written consent and express authorization of CITY. Any such subcontractor or assignee shall be bound by all of the terms and conditions of this Agreement as if named specifically herein. PROFESSIONAL SERVICES AGREEMENT-AEI ENGINEERING. PAGE5 OF 8 ---PAGE BREAK--- M. CITY'S Representatives CITY shall designate a representative authorized to act in behalf of CITY. The authorized representative shall examine the documents of the work as necessary, and shall render decisions related thereto in a timely manner so as to avoid unreasonable delays. N. Conflict of Interest ENGINEER covenants that they presently have no interest and will not acquire any interest, direct or indirect, in PROJECT which would conflict in any manner or degree with the performance of services hereunder. ENGINEER further covenants that, in performing this Agreement, they will employ no person who has any such interest. 0. Ownership and Publication of Materials. All reports, information, data and other materials prepared by ENGINEER pursuant to this Agreement shall be the property of CITY, which shall have the exclusive and unrestricted authority to release, publish, or otherwise use them, in whole or in part. All such materials developed under this Agreement shall not be subject to copyright or patent in the United States or in any other country without the prior written approval and express authorization of CITY. P. Compliance With Law/Non-discrimination. ENGINEER shall comply with all applicable local, state and federal laws and regulations and shall not discriminate against any employee or applicant for employment on the basis of race, color, religion, creed, political ideals, sex, age, marital status, physical or mental handicap, or national origin. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the date indicated above. ENGINEER CITY AEI Engineering, Inc. City of Moscow, Idaho DATEDthis /0 dayof Oc~b..a...f 2013. PROFESSIONAL SERVICES AGREEMENT-AEl ENGINEERING. PAGE60F8 ---PAGE BREAK--- ACKNOWLEDGMENT STATE OF IDAHO ) )ss. COUNTY OF ) On this \\.si.~ay of D-~v . 2013, before me, a Notary Public in and for said State, appeared Raymond J. Watkins, President, known to me to be the person named above and acknowledged that he executed the foregoing document as a duly authorized representative for AEI Engineering, Inc. PROFESSIONAL SERVICES AGREEMENT- AEI ENGINEERING. Notary Pub I" fort Residing My commission expires._ PAGE 7 OF 8 ---PAGE BREAK--- ENGINEERING FEE ESTIMATE Client City of Moscow Address 221 E. Second Street City Moscow State ID Phone [PHONE REDACTED] Project Fire Station No. 1, stand-by Power PM SI! 10.'18 W. Davidson A""'111& I Clll!ur d'Al~ne. ID 83814 20lll!U.4001 I fox 20&Md4D21 I Date 6/25'2013 Proposal No. P13112 ZIP 83643 File Name Client Job l!NG l!lT DRAPT ADMN Total Description of Tasks HUO S9150 $85.00 170.00 S50.00 135.00 Task 1 Project Management 1.1 Project correspondence, meetings, and status N/C reports Task2 Preliminary Design Tasks 2.1 Load Calculations and Utility Coordination 2 $170.00 2.2 Initial Site Visit and Scoping Meeting 2 $185.00 Task3 Final Design Tasks 3.1 Sheet E1 - Electrical Legend and Notes 0.5 0.5 $60.00 3.2 Sheet E2 - Site Plan 2 2 $240.00 3.3 Sheet E3 - Electrical One-Line Diagrams, 1 4 4 $572.50 Elevations & Schedules 3.4 Sheet E4 - Pov.er and Control Plan 1 4 4 $572.50 3.6 Sheet E5 - Wiring Diagrams 2 2 $240.00 3.6 Sheet E6 • Electrical Details 1 1 $120.00 3.7 Prepare Project Specifications 1 6 2 $582.50 3.8 Construction Cost Estimate 3 $210.00 3.9 QAIQC 1 $96.50 Task4 Bid and Construction Management 41 Advertisement 1 1 $127.50 4.2 Produce and Distribute Bid Documents 4 2 $270.00 4.3 Ansv.er questions from Bidders 1 1 $177.50 4.4 Prepare Addenda as required 1 1 $135.00 4.5 Project correspondence. pay requests. and status $370.00 reports 4 4.6 Contractor Questions and RFl's 2 $170.00 4.7 Submittal Review 0.5 6 $556.25 4.8 $975.00 Site lnspectionNisits/Commissioning/Punch-lists 6 6 4.9 O& Mreview 4 $340.00 410 Record Dra-Mngs 1 1 $120.00 Total Hours 1 17.5 16 29.5 19.5 5 ~ Sub Total $6,290.25 Reimbursable Expense Details: Expenses $304.03 ~_ileageffravel $304 TOTAL $6,594.28 Reproducibles Misc. $304 AEI ENGINEERING. EXHIBIT " A" PAGE 8 OF 8