March 23, 1998 CHANGE ORDER NO. 3 Project: PALOUSE TRAIL- 1997 Project No: 115-97 1. Furnish & install one catch basin at the southwest quadrant of Farm Road & HWY 8 and one area drain in the borrow pit ( between the path & HWY 8 ) @ Station 36+90; both needed to allow the drainage of ponded water from areas immediately adjacent to the path: Add . . . . . . . . . . . . . . . $2,459.00 2. Furnish & install 1 0 more feet of 24" CMP culvert & 30 degree fitting on the existing culvert@ Farm Road & HWY 8 (south of station 38+90 needed to allow a safe shoulder to be constructed at this location: Add . . . . . . . . . . . . . . . . $650.00 3. Delete ' installation ' only of the benches & bollards from the original contract ( city to take possession of the materials); the location & use of these items has not yet been finalized: Subtract . . . . . . . . . . . . . . $1,200.00 Existing contract amount $120,325.63 Amount of incease due to this change order $1,9 09.00 REVISED CONTRACT AMOUNT $122,234.63 POE ASPHALT PAVING,INC: 98-08