← Back to Moscow

Document Moscow_doc_5dab9c6f62

Full Text

CHANGE ORDER Distribution to: AlA DOCUMENT C701 OWNER ARCHITECT CONTRACTOR FIELD PROJECT: (name, address) TO (Contractor): OTHER Moscow Recycling Center 4o1 North Jackson Street Moscow, Idaho % 0 0 0 0 CHANGE ORDER NUMBER: INITIATION DATE: ARCHITECT'S PROJECT NO: 2 July 7, 1993 92035 I Fleming Construction CONTRACT FOR: New Construction 1144 16th Avenue Clarkston, Washington 994oJ L _j CONTRACT DATE: April 5, 1993 You are directed to make the following changes in this Contract: Excavate an additional 12 inches of depth at the footings. Fill and compact with 18 inches of 4 inch basalt shot rock, Fill the remainder of the footing fill above the basalt shot rock (ballast rock) with ML soil in 6 inch lifts and compacted. All work to be in strict accordance with the included "Daily Report" dated July 6, 1993 by Chris Beck of Howard Consultants, Inc. Also, provide sumps adjacent to footings and pump groundwater while fill is being placed as recommended in the report. Not v,1l1d until [1gnecl by both tlw Owner .md t\rCIHt<•CI. S1gn<]tun· or thl' Contr,lLtor 111d1<..It<\> h1' ,Jgr<.·<·mt•nt indud1ng any adjustment 111 the Contract Sum or Contr,!lt Tun<' The origm,ll (Contr.lct Sum) (Guaranteed Maximum Cost) was . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 549,251.00 Net change by previously authorized Change Orders . The (Contract Sum) (Cuar,mteecl Maximum Cost) prior to this Change Order was . $ 15,745.00 $ 564,996.00 The (Contract Sum) (Guaranteed Maxrmum Cost) will be (incre