Full Text
. CHANGE ORDER CHANGE ORDER NO.: 04 PROJECT: 1912 Moscow High School Historic Renovation - Phase 1 9973 INITIATION DATE: July 30,2001 CONTRACT DATE: February 21,2001 PROJECT NO.: TO: OWNER: ARCHITECT: Citadel Construction, Inc. 10!03 N. Division, Suite 105 Spokane, W A 99218 Tel: 509/466-2993 Fax: 509/466-4329 Job Site Fax: 208/882-4969 City of Moscow P.O. Box 9203 Moscow, 1D 83843 Tel: 208/883-7087 Fax: 208/883-7093 Design West Architects 254 E. Main Pulhnan, WA 99163 TEL. 509/332-3113 FAX 509/332-3327 You are directed to make tbe following changes in tbis Contract I. CPR-11 (ASI-3) Transformer and electrical feeder revisions $ 6,875.87 2. CPR-23 (ASI-7) Transformer and electrical feeder revisions - credit $ (1,193.08) 3. CPR-26 (PR-11) Removal of asbestos roofing at porch roofs - credit... (!38.00) 4. CPR-27 (PR-12) Removal of elevator shaft framing $ (3,423.86) 5. CPR-31 (PR-1 4) Gas line and pressure modifications $ 8,586.20 6. CPR-32 Second subsoil condition location $ 730.25 SUBTOTAL $ 11,437.38 Not valid until signed by both Owner and Architect. Signature of Contractor indicates his agreement herewith. including anv adiustment in the contract Sum or contract Time. It is further understood and agreed that this change constitutes compensation in full on behalf of the Contractor and its Subcontractors and Suppliers for all costs directly or indirectly attributable to the changes ordered and fOr any and all delays, impacts, disruptions, accelerations and/or extensions Hf time related thereto. No other compensation shall be allowed for the Modifications made herewith. The original Contract Sum $ 1,228,000.00 Net change by previously authorized Change Orders $ 28,182.78 The Contract Sum prior to this Change Order was $ 1,256,182. 78 The Contract Sum will be increased by tbis Change Order $ 11,437.38 The new Contract Sum including tbis Change Order will be $ 1,267,620.16 T11e Contract Time will be extended by calendar days by this Change Order. Page 1 of2 2001-32 ---PAGE BREAK--- CONTRACTOR: Citadel Construction, Inc. I 0103 N. Division, Suite 106 Spokane, WA 99218 OWNER: CityofMoscow P.O. Box 9203 Moscow, ID 83843 ARCHITECT: Design West Architects 25 4 E. Main Pullman, W A 99163 ] 'Z-•z (Signature) 0 7 /re) (Printed name and title) (Printed name and title) f/ y } (Date) f End ofDocument OD / (Date) Page 2 of2 Mtf!At..ltJI! s. I (Printed name and title) JuLi 0/1 2&J/ (Date)