← Back to Moscow

Document Moscow_doc_36c85a3eb9

Full Text

CHANGE OADER AlA DOCUMENT G701 OWNER ARCHITECT CONTRACTOR FIELD OTHER cv"' 0 0 0 0 PROJECT: Old Post Office 3rd Flr Remodel CHANGE ORDER NUMBER: 1 (name, address) East 206 Third Street DATE: April 22, Moscow, Idaho TO CONTRACTOR: ARCHITECT'S PROJECT NO: 93043 (name, address) Diamond H Construction CONTRACT DATE: Rt. #1 Box 8.5A Culdesac, Idaho 83524 CONTRACT FOR: The Contract is changed as follows: See attached summary and supporting documentation. Not valid until signed by the Owner, Architect and Contractor. The original (Contract Sum) (Guaranteed Maximum Price) wa$ . . . . . . . . . . . . . . . . . . . . . . . . S Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was . . . . . . . . . . S The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of . . . . . . . . . . . . . . . . . . . . . . . . . . . . S The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be . . S The Contract Time will be fincreaszd) (decreased) (unchanged) by The date of Substantial Completion as of the date of this Change Order therefore is February Remodel 8?,440.00 o.oo 8?,440.00 2,482.39 89,922.39 zero April 24, 1994 1994 10, 1994 ( 0 ) days. NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized hy Change Directive. Castellaw Kom Architects Diamond H Construction City of Moscow ARCHITECT CONTRACTOR OWNER 504 Main Street Rt. #1 Box 8.5A 122 East 4th Street t fston, Idaho 83843 Addres.L Moscow, Idaho 83843 A#fOe sac , Idaho 83524 BY  BY DATE DATE _ _ CAUTION: You should sign an original AlA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents ar e reproduced. AlA DOCUMENT G701 • CHANGE ORDER • 19H7 EDITION • AlA® • © 198i • THE AMERICAN INSTITUTE OF ARCHITECTS, 1755 NEW YORK AVF., N.W., WASHINGTON, DC 20()06 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. G701-1987 94-30 ---PAGE BREAK--- CKA CASTELLAW KOM ARCHITECTS Towne Square 504 Main Street Suite 210 Lewiston, ID 83501 (208) 7 46-0183 CHANGE ORDER Change Order No.: 1 Date: April 22, 1994 Project No.: 93043 Contract For: Remodel Project: Moscow Old Post Office Third Floor Remodel Owner: City of Moscow Contractor: Diamond H Construction Contract Dated: February 10, 1994 The items listed below are changes to the Contract Documents. This listing to be included with AIA Document G70 1, Change Order. Additional documentation may be included. Change Proposal # 1 Items- Item I Item 2 Item 3 Item 4 Enlarge window at Room 309A from 2'-0"x3'-6" to 2'-0"x3'-6". Reinstall sheet rock and trim. Provide header over the entire window. Add $365.00 Lower existing urinal plumbing and repair drywall as required to meet ADA requirements in Room 306. Add $417.00 Modify the ceiling work as described below: 1. Provide glue on ceiling tile at Elevator Lobby 303 in lieu of suspended. Omit ceiling grid in this room. New ceiling tile to be 12"x12"x5/8" Minatone Cortega or approved equal. Color to be white. 2. Omit new fluorescent light fixture in Elevator Lobby 303 in lieu of existing. Existing light fixture to remain. Trim ceiling tile out neatly at perimeter of light. 3. Change suspended ceiling panels from 2'x4'x3/4" Bold Look (2'x2' look) to 2'x4'x5/8" Minaboard Cortega (2'x4' look) or approved equal. Color to be white. Add/Deduct $0.00 Modify the Cabinet/Furnishing work as described below: ---PAGE BREAK--- CKA Item 5 CASTELLAW KOM ARCHITECTS 1. Locate shelving called for in Janitor 308 to north wall of Utility 304. 2. Provide credit for location of cabinet tops to be located below the window sill at Wrk Rm 309B and Break Rm 302A 3. Add two lateral file drawers at the north wall of Code Enforcement Reception 313 in lieu of base cabinets. 4. Rearrange cabinetry in Code Enforcement Reception 313 as indicated on the shop drawings ( same lineal feet of cabinetry just rearranged). Note: legal file drawers are to be convertible to letter file drawers at a later date. 5. Add one grommet at Code Enforcement Reception 313. 6. Omit one side of base cabinets at copier alcove in Corridor 310. 7. Furnishing tops to be changed from 1" melamine to 3/4" plastic laminate. Note that the conference table in City Supervisor 317 already has a plastic laminate top. 8. Add grommet at Breakroom 302A. Add $431.25 Install grounding jumpers on all wiremolds and replace all receptacles and plates to conform with specifications. Additionally, replace all existing switches in all offices with spec. grade devices to match new devices. Add $1269.14