Full Text

December 7, 1993 CHANGE ORDER NO. TWO White Avenue Reconstruction City of Moscow, Idaho - Poe Asphalt Paving, Inc. 1. Additional miscellaneous plumbing materials to construct the housing site storm and sanitary utilities. Extra due to a change on the design drawings after bid opening. Added Cost . $313.58. 2. Furnish one 6-inch saddle block clamp for fire hydrant relocation at the dog pound. Not required under original scope of work. Added Cost . . . $ 23.00 3. Additional work to construct the westerly most storm drain manhole on White Avenue ;;tt a location west of where it had been shown on the plan- to resolve a conflict in elevation between the new storm sewer and an existing City watermain. Added Cost . $553.80 4. Extra work caused by excavating through an existing one-inch diameter water service line that had not been marked in its correct location. Added Cost . . . . $292.50 5. Additional work to construct the storm drain manhole at White and Andy at a location west of where it had been shown on the plans - to avoid grade crossing conflicts with two existing City watermains and an existing City sanitary sewer main. Added Cost . . $583.40 ---PAGE BREAK--- 6. Extra work caused by moving the storm drain line in White Avenue east of Andy to the north - to avoid trench excavation too close to WWP's existing power transmission pole. Added Cost . . $202.80 Total Added Cost . $1,96 9.08 Contract amount prior to this change order . 271.190.50 Revised Contract Amount . $273,159.58 Poe Asphalt Paving, Inc. City of Moscow Mayor Secretal"Y ' City Clerk