Full Text
2000 D IT I 0 N AlA DOCUMENT G701-2000 Change Order on reverse side) PROJECT: City of MOSCOW Samcundaddrc:.:!K!l!tit:k§vhi-c.\ the cost or time are in dispute -OS de.cribed in Suhparaf!;raph ;.3.8 of AlA Document A201. Not valid until signed by the Architect, Contractor and Owner. Ci tyqJ Moc;C()V/_._ OWNER OWNER D ARCHITECT D CONTRACTOR D FIELD D OTHER D ©2000 AlA® . _ / A DOCUMENT G701-2000 .-?-2#-I'fl C:,q;t CHANGE ORDER _OJh o-f DATE BY 8 the material herein or quotation its violate-s the copyright laws of the United States and wi!l subject photocopying vfoiates U5. copyright laws and will subject the violator to legal prosecution. The American Institute of Architects 1735 New York Avenue, N.W. Washingwn, 2004-14 I ---PAGE BREAK--- CKA CASTELLAW KOM ARCHITECTS 850 Main Street Lewiston, ID 83501 (208) 746-0183 Fax (208) 746-7267 Change Order #2 Date: February 10, 2004 Attachment A THE CONTRACT IS CHANGED AS FOLLOWS: Item 0 1: Relocate point of connection for the irrigation system and CMU veneer supports per Ormond Price Change Request No. 09, dated November 5, 2003 and Architectural Supplemental Instruction No. (ASI#S), dated October 24, 2003. $797.00 Item 02: Provide millwork revisions per Ormond Price Change Request No. 10, Revision 01- Miscellaneous Millwork Revisions, dated November 25, 2003. $1,704.00 Item 03: Revise metal soffits per Ormond Price Change Request No. 11- Metal Soffits, dated December 03, 2003. ($600.00) Item 04: Provide power for hose dryer cabinet, provide power for the hose washer, provide venting and wall louver for hose dryer cabinet per Castellaw Kom Architects Change Proposal Request No. 02R, dated December 3, 2003 (revised December 18, 2003) and Ormond Proposal Request No. 02- Hose Dryer and Washer, dated December 22, 2003. $3,867.00 Item 05: Provide additional gutters and downspouts per Castellaw Kom Architects Change Proposal Request No. 03, dated January 7, 2004 and per Ormond memo $4,938.00 Item 06: Provide :able rail fall protection at the North/South attic walkway per Castellaw Kom Architects Change Proposal Request Bo. 04, dated January 7, 2004. $1,021.00 Item 07: Revise Lobby 102 lights per Castellaw Kom Architects Change Proposal Request No. 06, dated January 20, 2004 and Onnond memo Proposal Request No. 06- Revise Lobby Lights, dated January 27,2004 $1,891.00 Item 08: Revise the irrigation point of connection from the location detailed in AS! No. 05 per Ormond Price Change Request No. 12- Revise Irrigation Point of Connection, Dated February 4, 2004 $364.12 Item 09: Add a condensate pump and piping from Furnace F-5 to the second level mechanical floor drain piping per Ormond Proposal Change Request No. 13- Add Condensate Pump, dated February 3, 2004 $344.00 ---PAGE BREAK--- Item 10: Provide power circuiting for the projection screen and switching at Room 131 per Ormond Proposal Request No. 14- Projection Screen Power and Switch, dated February 3, 2004 $264.00 Item 11: Provide conduit and \Vires to the irrigation control panel per Ormond Proposal Request No. 15 - Conduit and Wires for Controller, dated February 9, 2004 $317.00 Item 12: Provide caulk at construction joints at the Apparatus Bay per Ormond Price Change Request No. 16- Caulk Construction Joints at Room 131, dated February 16, 2004 $1,408.00 Total Contract Sum revision: $16,315.12