Full Text
City of Moscow SANITATION, WATER AND WASTEWATER RATE STUDY October 2013 FCS GROUP 7525 166th Avenue NE, Suite D-215 Redmond, WA 98052 T: [PHONE REDACTED] I F: [PHONE REDACTED] This entire report is made of readily recyclable materials, including the bronze wire binding and the front and back cover, which are made from post- consumer recycled plastic bottles. ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate Study October 2013 TABLE OF CONTENTS SECTION I: INTRODUCTION 1 SECTION II: RATE STUDY METHODOLOGY 2 A. Rate Setting Principles and Methodology 2 B. Revenue Requirement 3 C. Cost of Service 3 D. Rate Design 4 SECTION III: SANITATION 5 A. Introduction 5 A.1 Rate Study Committee 5 B. Revenue Requirement 6 B.1 Operating Forecast 6 Reserves 6 Operating 6 O&M Expenses 6 Debt Service 7 B.2 Capital/Equipment Funding Plan 7 B.3 Summary of Revenue Requirement 8 C. Cost of Service 10 D. Solid Waste Processing Facility Cost of Service 11 D.1 Functional Cost Allocation 12 D.2 Allocation Factors 12 D.3 Solid Waste Processing Facility Cost of Service 13 D.4 Rate Issues 13 D.5 Solid Waste Processing Facility Proposed Rates 14 E. Collection Cost of Service 15 E.1 Functional Cost Allocation 16 E.2 Allocation Factors 17 E.3 Collection Cost of Service 17 E.4 Rate Issues 18 E.5 Proposed Collection Rates 19 i ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate Study October 2013 F. Summary 19 SECTION IV: WATER UTILITY 21 A. Introduction 21 B. Revenue Requirement 21 B.1 Operating Forecast 21 Reserves 21 Operating 21 O&M Expenses 22 Debt Service 22 System Reinvestment 22 B.2 Capital Funding Plan 22 B.3 Summary of Revenue Requirement 23 C. Cost of Service 24 C.1 Customer Class Distinctions 25 C.2 Allocation Factors 25 C.3 Water Fund Cost of Service 26 D. Rate Design 27 D.1 Existing Water Rates 27 D.2 Proposed Water Rates 28 E. Summary 29 SECTION V: WASTEWATER UTILITY 30 A. Introduction 30 B. Revenue Requirement 30 B.1 Operating Forecast 30 Reserves 30 Operating 30 O&M Expenses 31 Debt Service 31 System Reinvestment 31 B.2 Capital Funding Plan 31 B.3 Summary of Revenue Requirement 32 C. Wastewater Cost-of-Service Analysis 33 C.1 Customer Class Distinctions 34 C.2 Customer Class Allocations 34 C.3 Wastewater Cost of Service 35 D. Rate Design 36 D.1 Existing Wastewater Rates 36 ii ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate Study October 2013 D.2 Proposed Wastewater Rates 37 D.3 Future Rate Design Considerations 38 E. Summary 38 SECTION VI: RATE COMMITTEE 39 TECHNICAL APPENDIX 40 SANITATION FUND 41 SANITATION OPERATIONAL EFFICIENCY EVALUATION AND REVIEW OF REVENUE COLLECTION 42 WATER FUND 43 WASTEWATER FUND 44 iii ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 SECTION I: INTRODUCTION In 2011, the City of Moscow engaged FCS GROUP to prepare a comprehensive rate study for the Sanitation, Water and Wastewater funds. As part of the rate study, separate but related sanitation analyses were completed by CH2M HILL Engineers, Inc. These additional reviews included an operational efficiency evaluation and review of revenue collection. The intent of both studies is to establish a blueprint for achieving strong financial performance in the future and delivering efficient and effective services to the City’s customers. The scope of the FCS GROUP project included the following key elements: Review and establish fiscal policies; Assess revenue needs for a multi-year period that include adequate funding for operations and maintenance, capital projects, debt service, and other program activities; Project long-term capital needs and incorporate these needs into a long-term funding forecast that includes rates, debt and existing reserves; Use industry standard methods to establish a defensible basis for assigning “cost shares” and establishing “equity” for utility customers; Develop and recommend rate structures that generate sufficient revenue to meet each utility’s financial obligations on a standalone basis; Complete an efficiency review, revenue audit and franchise agreement review identifying areas for changes and/or improvement; and Engage the Rate Study Committee in the rate study process and incorporate their feedback and input. The methodology, key factors, conclusions and recommendations for each of the rate study key task areas are summarized in this executive level report. The technical summary related to the Operational Efficiency Evaluation and Review of Revenue Collection can be found in the Technical Appendix of this report. 1 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 SECTION II: RATE STUDY METHODOLOGY A. RATE SETTING PRINCIPLES AND METHODOLOGY The methods used to establish user rates are based on principles that are generally accepted and widely followed throughout the industry. These principles are designed to produce rates that equitably recover costs from each class of customer by setting the appropriate level of revenue to be collected from ratepayers, and establishing a rate structure to equitably collect those revenues. The primary tasks of the rate study are listed below: Revenue Requirement Analysis. This analysis identifies the total revenue requirement to fully fund each system on a standalone basis, considering operating and maintenance expenditures, capital funding needs, debt requirements and fiscal policy objectives. Cost of Service Analysis – This analysis equitably distributes costs to each customer class based on their proportional demand and use of the system. Rate Design Analysis. This analysis includes the development of rates that generate sufficient revenue to meet each system’s revenue requirement forecast and continue to address the City’s pricing objectives (e.g. conservation and revenue stability). Exhibit 2.1 illustrates the rate study process. Exhibit 2.1: Overview of the Rate Study Process CLASSIFY COSTS BY FUNCTION REVENUE REQUIREMENTS Wastewater ALLOCATE COSTS TO CUSTOMER CLASSES/ SERVICES RATE DESIGN/UNIT COSTS CAPITAL & EQUIPMENT NEEDS IDENTIFY CAPITAL FUNDING Flow Customer Strength Water Base Fire Peak Sanitation Collection Recycling Processing Facility Transport/ Disposal Compost FINANCIAL GOALS & POLICIES Customer OPERATING BUDGETS ECONOMIC ASSUMPTIONS CUSTOMER STATISTICS 2 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 B. REVENUE REQUIREMENT A revenue requirement analysis forms the basis for a long-range financial plan and multi-year rate management strategy for each system. It also enables the City to set utility rate structures which fully recover the total cost of operating each system: capital improvement and replacement, operations, maintenance, general administration, fiscal policy attainment, cash reserve management, and debt repayment. Linking rate levels to a financial plan such as this helps to enable not only sound financial performance for the City’s funds, but also a clear and reasonable relationship between the costs imposed on utility customers and the costs incurred to provide the service. A revenue requirements analysis includes the following core elements to form a complete portrayal of the utility’s financial obligations: Fiscal Policy Analysis. Identifies formal and informal fiscal policies of the City to ensure that current policies are maintained, including reserve levels, capital/system replacement funding and debt service coverage. Capital Funding Plan. Defines a strategy for funding the City’s capital improvement/equipment replacement program, including an analysis of available resources from rate revenues, debt financing, and any special resources that may be readily available grants, outside contributions, etc.). Operating Forecast. Identifies future annual non-capital costs associated with the operation, maintenance, and administration of the system. Sufficiency Testing. Evaluates the sufficiency of revenues in meeting all financial obligations, including any coverage requirements associated with long-term debt. Strategy Development. Designs a forward-looking strategy for adjusting rates to fully fund all financial obligations on a periodic or annual basis over the projections period. C. COST OF SERVICE The purpose of a cost of service analysis is to provide a rational basis for distributing the full cost of each utility service to each class of customers in proportion to the demands they place on the system. Detailed cost allocations, along with appropriate customer class designations, help to sharpen the degree of equity that can be achieved in the resulting rate structure design. The key analytical steps of the cost of service analysis are as follows: Functional Cost Allocation. Apportions the annual revenue requirement to the major functions of the system: Sanitation: collection, solid waste processing facility, transport/disposal, recycling, compost Water: base (average use), peak (highest use), customer (general customer costs) Wastewater: flow (collection), strength (treatment) and customer (general customer costs). Customer Class Designation. Identifies the customer classes that will be evaluated as part of the study. Existing as well as new or revised customer classes or class definitions may be considered. It is appropriate to group customers that exhibit similar usage characteristics and service requirements. Cost Allocation. Allocates the costs from the functional cost allocation to different customer classes based on their unique demands for each service as defined by system planning documents, industry standards, and recorded user history (from billing data). The results identify shifts in cost recovery by customer class from that experienced under the existing rate structure. 3 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 D. RATE DESIGN The principal consideration of rate design is for the rate structure to generate sufficient revenues for the system which are reasonably commensurate with the cost of providing service. The pricing structure is largely dictated by the objectives of the system. Most rate designs consist of fixed and variable charges. Fixed costs typically attempt to cover costs of the system that do not vary while variable costs will fluctuate with a change in user demand. 4 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 SECTION III: SANITATION FUND A. INTRODUCTION The City of Moscow operates a comprehensive solid waste sanitation system. The City provides contract management and acts as a billing agent for other Latah County Cities, the County, University of Idaho (U of I) and some commercial accounts. The City contracts out for all major sanitation fund services. Services contracted through Latah Sanitation, Inc. (LSI) include: solid waste collection, curbside recycling, operation of the City owned recycling center and operation of the solid waste processing facility and inert/demolition landfill. Services contracted through Waste Connections of Idaho (WCI) include transportation and final disposal of municipal solid waste (MSW). Although all rate studies completed are part of the greater water, wastewater and sanitation fund rate study, each rate study is conducted independently. The sanitation fund study was started first during 2011 and was completed in the first quarter of 2012. A.1 Rate Study Committee A key component of the sanitation utility rate study was the involvement of the Rate Study Committee (Committee). This was especially important for the sanitation fund since a formal rate study had never been completed. During the course of the study, the consultant and City project team met with the Committee at key milestones to share results, gain feedback and to incorporate suggestions. The following meetings were held and/or work effort completed by the Committee. Nov. 22, 2011 first meeting with Committee Overview of sanitation fund services. Presentation of cost of service rate study results – combined system evaluation and independent collection service and solid waste processing facility evaluations. Summary of efficiency review, revenue audit findings and franchise agreement review. December 2011 independent Committee input Matrix survey/questionnaire to Committee related to key sanitation fund issues and decision points January 11, 2012 Compile matrix survey/questionnaire responses and revise analysis Committee presented with revised analysis, consensus and support for the results. February 14, 2012 City Council Workshop (some Committee members in attendance) Presentation of rate study process, committee work, results and recommendations to Council. 5 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 B. REVENUE REQUIREMENT A revenue requirement analysis forms the basis for a long-range financial plan and multi-year rate management strategy. The analysis is developed by identifying current and future annual operating costs and capital/equipment funding needs. B.1 Operating Forecast The purpose of the operating forecast is to determine whether the existing rates and charges are sufficient to recover the costs the City incurs to operate and maintain sanitation services. The fiscal year (FY) 2012 budget revenues and expenses formed the baseline for this forecast. The operating forecast was developed for the FY 2013 through 2020 time period. The following list highlights some of the key assumptions used in the development of the sanitation fund operating forecast. Reserves Operating Reserve. A minimum of 25 percent, or 90 days, of operating and maintenance (O&M) expenses ($1.0 to $1.2 million, per discussion with City staff). Operating Revenue Retail Rate Revenue. Based on actual detailed customer statistics. Rate revenue is generated from collection fees and revenue received from tipping fees at the solid waste processing facility. Assumes the route management system comes online, resulting with an increase of approximately $100,000 from Residential customers. Other Revenue. This revenue represents additional revenue from loose yardage, extra service, recycling mobile containers and special hauls (pickup truck, packer truck, roll off service). Program Fee. This fee (currently $1.30) is charged to non-city residents of Latah County. Current program fee includes funding for the recycling center, education programs, free tonnage and household hazardous waste. Customer Growth. Historical trends for tonnage and customers along with the economic slowdown were considered. Projected growth in tonnage and customers is flat through FY 2016 and a slight increase to 0.50 percent per year thereafter Interest Earnings Rate. Rate of 1.0 percent per year (based on discussion with City staff) O&M Expenses General Cost Inflation. 2.68 percent per year (based on analysis of five-year historical Consumer Price Index (CPI) data and discussion with City staff); LSI contract. 2.68 percent per year (based on analysis of five-year historical Consumer Price Index data). Contract costs factored at 100 percent of CPI. WCI contract. 2.44 percent per year (based on CPI Urban Wage Earners Index March to March provided by City). Contract costs factored at 80 percent of CPI-U. Construction Cost Inflation. 3.41 percent per year (based on Engineering News Record Construction Cost Index 5-year average); Labor Cost Inflation. 3.00 percent per year (based on discussions with City staff); and Benefits. 10.00 percent per year (based on discussion with City staff). 6 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Debt Service There is currently no debt associated with the sanitation fund and no new debt service is anticipated during the time period under review. B.2 Capital/Equipment Funding Plan The sanitation fund is anticipating $3.5 million in capital costs in FY 2013 through 2020. The most significant capital costs anticipated include: Recycling Center Property, Bin Relocation, Redemption Building, Storage Addition, Storage Enclosure and East Parking Area: $2.6 million Future Disposal Option Studies: $556,000 Equipment Purchase $259,000 Funding for the capital/equipment identified includes existing fund balance, interest and transfers of surplus from the operating fund after meeting the fund balance target. Exhibit 3.1 provides a summary of the available funding for the annual capital/equipment costs. Exhibit 3.1: Sanitation Fund Capital Funding Summary Exhibit 3.1 shows there is sufficient fund balance available to meet the annual capital/equipment funding needs. In addition, there is an anticipated ending fund balance of $2.8 million in FY 2020 available for the anticipated future disposal funding needs that will be identified upon completion of the disposal option studies. FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Fund Balance Available For Capital 1,679,925 $ 880,388 $ 1,039,198 $ 1,548,928 $ 937,856 $ 835,289 $ 1,457,021 $ 2,133,628 $ Plus: Interest Earnings 16,799 8,804 10,392 15,489 9,379 8,353 14,570 21,336 Transfer of Surplus from Operating Fund 471,166 486,173 503,912 488,542 580,172 618,437 667,268 718,762 Total Available for Capital 2,167,890 $ 1,375,365 $ 1,553,502 $ 2,052,958 $ 1,527,407 $ 1,462,079 $ 2,138,859 $ 2,873,726 $ Less: Capital/Equipment Costs (1,287,501) (336,167) (4,574) (1,115,102) (692,118) (5,058) (5,231) (5,409) Ending Balance 880,388 $ 1,039,198 $ 1,548,928 $ 937,856 $ 835,289 $ 1,457,021 $ 2,133,628 $ 2,868,318 $ 7 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 B.3 Summary of Revenue Requirement The operating forecast for the sanitation fund includes the costs associated with personal services, contractual services including LSI contract services, commodities, transfers, recycling center costs, compost facility costs, transfer station costs including waste connections contract services and capital/equipment costs. All expenses combined form the multi-year revenue requirement. The revenue requirement is compared to the overall revenue available to the sanitation fund to evaluate the sufficiency of rates on an annual basis. Exhibit 3.2 provides a comparison of the sanitation fund revenue requirement to the existing revenue. Details can be found in the Technical Appendix. Exhibit 3.2: Comparison of Sanitation Fund Existing Revenue to Revenue Requirement Summary of Revenue Requirement: Current rate revenue levels meet operating needs through 2016; however fall short of the total revenue requirement when capital funding needs are added. Rate pressure is also experienced from inflation levels outpacing annual revenue growth; To meet the projected long-term funding needs of the sanitation fund, an overall 3.0 percent annual rate increase is necessary. The revenue requirement was also evaluated independently for collection service and the solid waste processing facility. Exhibit 3.3 and Exhibit 3.4 provide a comparison of the collection service and solid waste processing facility revenue requirement to the current revenue. Details can be found in the Technical Appendix. $(500,000) $500,000 $1,500,000 $2,500,000 $3,500,000 $4,500,000 $5,500,000 $6,500,000 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 City Operations Collection Services Recycling Center Compost SW Processing Facility Transport/ Disposal Capital Funding Total Existing Revenue 8 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Exhibit 3.3: Comparison of Collection Service Existing Revenue to Revenue Requirement The current revenue from collection rates and fees is generating more than the overall revenue needs for the collection service. Over time, future capital needs will drive the need for rate increases. Exhibit 3.4: Comparison of Solid Waste Processing Facility Existing Revenue to Revenue Requirement The solid waste processing facility existing revenue does not meet the annual expenses to operate the facility. On a combined basis, the current revenue received from collection and sanitation show a rate increase of 3.0 percent is required annually through 2020. Upon further analysis, the rate increase is driven mainly by the fees of the solid waste processing facility not covering the required revenue needs identified. The sanitation fund charges separate rates and fees for collection services and the solid waste processing facility. Each of the services will be evaluated independently to determine the rate adjustments required. $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 $4,500,000 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Collection Expenses Collection Revenue $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Solid Waste PF Expenses Solid Waste PF Revenue 9 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 C. COST OF SERVICE The combined revenue requirement of the financial plan must be separated to evaluate the cost of service independently for the collection system and solid waste processing facility. Exhibit 3.5 illustrates the cost of service process that was completed to evaluate the cost of service and ultimate rates for each system. Exhibit 3.5: Overview of Sanitation Fund Cost of Service Process UNIT COSTS FUNCTIONAL COST ALLOCATION SOLID WASTE PF APPLIANCES TRANSPORT/ DISPOSAL TIRES TRANSFER STATION ASBESTOS HAZARDOUS WASTE RECYCLING VOLUME COMPOST BASE TRANSPORT/ DISPOSAL UNIT COSTS FUNCTIONAL COST ALLOCATION COLLECTION LSI CONTRACT - Coll. CITY OPERATIONS TRANSPORT/ DISPOSAL CAPITAL/EQUIPMENT FUND BALANCES COMPOST FACILITY RECYCLING CENTER REVENUE REQUIREMENT LAND LEASE CONTRACT OPERATIONS TRANSPORT/ DISPOSAL CLOSURE CONTRACT MAINTENANCE 10 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 D. SOLID WASTE PROCESSING FACILITY COST OF SERVICE The solid waste processing facility is owned and operated by LSI for the City. The facilities include: entrance scale and scale building, household hazardous waste collection building, transfer station, compost facility and distribution, inert demolition landfill, and collection and processing facilities for yard waste, tires, white goods, tin and metals. The tickets and tons processed are key factors when determining the unit costs for the services provided. Summaries of the tickets and tons processed at the solid waste processing facility are shown in Exhibit 3.6 and Exhibit 3.7 Exhibit 3.6: Solid waste Processing Facility Tickets Exhibit 3.7: Solid waste Processing Facility Tons – Municipal Solid Waste (MSW) and Non-Municipal Solid Waste (NMSW) Approximately 30,000 tons were processed based on 2008 – 2010 reports that were provided. Sixty one percent was for Municipal Solid Waste (MSW) and 18.0 percent was for Non MSW. Recycling/ Compost make up the remainder of the tonnage. Free tonnage accounts for 4.6 percent of the MSW and 17.6 percent of the NMWS. Free tonnage of up to 500 lbs per day of yard waste, scrap metal, white goods and demolition debris; up to 100 lbs per day of municipal solid waste; appliance disposal (without CFC) and 100 lbs of tires is currently allowed at the processing facility free of charge. MSW 46.53% Non-MSW 31.61% Compost 10.92% Tires 1.06% Appliances 9.82% Asbestos 0.06% City, 208 , 4.07% County, 547 , 10.73% Self Haul - Residential, 1,144 , 22.44% Self Haul - Commercial, 3,176 , 62.31% Compactors, 23 , 0.45% NMSW City - LSI, 8,604 , 48.92% County - LSI, 5,287 , 30.06% City - Self Haul, 1,158 , 6.59% County - Self Haul, 349 , 1.98% Compactors, 2,188 , 12.44% MSW 11 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 D.1 Functional Cost Allocation The cost-of-service allocation process for the solid waste processing facility operation involves allocating costs by system service functions, development of service specific allocation factors and allocating cost to customer classes. The functions of service analyzed are unique to the processing facility. The functions of service to which the solid waste processing facility costs have been allocated are listed below: Solid Waste Processing Facility Operations. These costs are associated with the fees paid to LSI for operating the facility (O&M, repair and maintenance, utility expense and land lease) and city operating costs related to supporting facility operations. Disposal/Landfill. These costs are associated with fees paid to WCI for transport and disposal of municipal solid waste to the landfill in Oregon. Direct Assignment. These costs can be directly associated with receiving and processing appliances, tires and asbestos. Exhibit 3.8 provides a summary of the functional cost allocation results. Exhibit 3.8: Solid waste Processing Facility Functional Cost Allocation Summary D.2 Allocation Factors Allocation factors are developed to derive the cost of service for each processing facility function of service. The allocation factors are intended to equitably allocate total costs to those benefitting from the service. For this study, the processing facility costs were allocated based on the following: Processing Facility and City Operations – allocated based on number of tons. Disposal/landfill – allocated by municipal solid waste tons. Direct Assignment – Allocated directly to appliances, tires and asbestos. Solid Waste PF Operations, $550,042 , 57.13% Disposal/ Landfill, $369,420 , 38.37% Appliances, $19,746 , 2.05% Tires, $20,536 , 2.13% Asbestos, $3,080 , 0.32% 12 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 D.3 Solid Waste Processing Facility Cost of Service The total allocated cost distributed by the allocation factors results in cost-based unit costs. Exhibit 3.9 summarizes the cost of service rates per ton. Exhibit 3.9: Summary of Solid Waste Processing Facility Cost of Service, Per Ton D.4 Rate Issues The results of the cost of service analysis indicate a need for an increase in all fees charged at the processing facility. In addition, there were a number of other rate issues the City wanted to address during the cost of service rate study. A survey was provided to the Committee members for their feedback on key issues. Eliminate free tonnage at processing facility? Currently there is free disposal at the processing facility. This free service includes; up to 500 lbs per day of yard waste, scrap metal, white goods and demolition debris; up to 100 lbs per day of municipal solid waste; appliance disposal (without CFC) and 100 lbs of tires. An analysis of the existing program estimated a cost for free service at $80,000 per year. A majority of the Committee favored elimination of the free tonnage. Institute a $10.00 minimum fee at solid waste scale house? All waste streams delivered to the processing facility have an associated cost to process and/or dispose. Instituting a minimum fee assumes a 25 percent reduction in trips. This would help ease traffic congestion and queue times at the facility. The minimum fee would apply to residential and commercial self-haul and include 200 lbs of MSW, 460 lbs of NMSW and 280 lbs of Mixed Waste. A majority of the Committee respondents voted in favor of instituting a minimum fee of $10.00 at the SWPF scale house How should the cost of service be approached for tires? There was concern that a rate increase would increase illegal dumping of tires. The fee options discussed were a) tie to the cost of service (includes direct costs and their share of contract costs related to the solid waste processing facility), b) charge only the direct costs of disposal or c) increase fee by the overall 3.0 percent sanitary fund increase. The majority of the Committee initially preferred to only apply an average of 3.0 percent increase to this fee. Additional discussion regarding the subsidy and the specific costs associated with tire processing resulted in a revised recommendation to charge tires the direct pass through costs only. Municipal Solid Waste $85.83 $0.00 $85.83 Non Municipal Solid Waste 42.73 - 42.73 Appliances - CFC Removal - 25.56 25.56 Appliances - Large - 6.92 6.92 Tires 42.73 247.33 290.05 Asbestos 42.73 137.39 180.12 Fee S.W. PF Operations & Disposal Direct Assignment COSA 13 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 How should the cost of service be approached for Asbestos? The fee options discussed were a) tie to the cost of service (includes direct costs and their share of contract costs related to the solid waste processing facility), b) charge only the direct costs of processing and disposal for this waste or c) increase fee by the overall 3.0 percent sanitary fund increase. The majority of the committee understood the cost associated with this special waste and preferred to charge the cost of service based fee. Exhibit 3.10 summarizes the revised cost of service based on Committee input and feedback related to the cost of service questions and other rate issues. Exhibit 3.10: Summary of Revised Solid Waste Processing Facility Rates, Per Ton D.5 Solid Waste Processing Facility Proposed Rates The final rates recommended for the solid waste processing facility were a result of the cost of service analysis and extensive discussion and analysis with staff and the Committee on the other rate related issues. Exhibit 3.11 summarizes the recommended rates for the solid waste processing facility. Exhibit 3.11: Summary of Solid Waste Processing Facility Proposed Rates, Per Ton A minimum charge of $10.00 is proposed which will reduce the unit cost rate for other waste; The $10.00 charge will remain in place until the next cost of service update. Tires were increased to collect only direct costs. Minimum Fee $0.00 $10.00 Municipal Solid Waste > Min 67.95 73.80 Non Municipal Solid Waste > Min 29.80 30.10 Appliances - CFC Removal 31.00 25.55 Appliances - Large 2.60 6.90 Tires 138.50 188.10 Asbestos 128.45 167.50 Fee Existing Fee Revised COSA Minimum Fee $0.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 Municipal Solid Waste > Min 67.95 73.80 76.00 78.30 80.65 83.05 85.55 88.10 90.75 Non Municipal Solid Waste > Min 29.80 30.10 31.00 31.95 32.90 33.90 34.90 35.95 37.05 Appliances - CFC Removal 31.00 25.55 26.30 27.10 27.90 28.75 29.60 30.50 31.40 Appliances - Large 2.60 6.90 7.10 7.30 7.50 7.75 8.00 8.25 8.50 Tires 138.50 157.95 162.70 167.60 172.65 177.85 183.20 188.70 194.35 Asbestos 128.45 167.50 172.55 177.75 183.10 188.60 194.25 200.10 206.10 Notes: Rates were rounded to the nearest nickle ev ery year. FY2019 FY2020 Fee Existing Fee Proposed FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 14 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 E. COLLECTION COST OF SERVICE The curbside collection and recycling service includes curbside collection for residential, multi- family and commercial customer. Residential pickup is one time per week. The service includes same day recycling and cannot exceed a 36 gallon can. Customers are allowed extra set-outs if a tag is purchased. The multi-family and commercial service includes both cans and mechanical containers. The customer can select the frequency of service per week. Roll off service is available upon request. The City offers collection service to the University of Idaho which owns compactors and a mechanical container. The number of accounts, containers and volume (based on frequency of pickups) are key factors when determining the unit costs for the collection services provided. A summary of the collection service cans and volume are summarized in Exhibit 3.12 and Exhibit 3.13 Exhibit 3.12: Collection System Units Exhibit 3.13: Collection System Volume Although residential represents 89.50 percent of the billed units, they only represent 21.98 percent of the volume. The mechanical containers represent the most volume with 77.00 percent of the total, yet only represent 9.00 percent of the billed units. The recycling center accepts recyclables, electronic waste and yard waste. The center serves as the main processing facility for recycled material collected at curbside and the center. The center is Residential 89.52% Commercial Cans 1.45% Mechanical Containers 9.04% Residential 21.98% Commercial Cans 0.98% Mechanical Containers 77.05% 15 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 operated by Latah Sanitation, Inc. who is responsible for day-to-day operations, curbside collection of recyclable material and delivery to the center, load and transport of acceptable material and compostable waste, public information and the education program. LSI has the right to the revenue from recyclable commodities. E.1 Functional Cost Allocation The cost-of-service allocation process for the collection operation involves similar steps to the processing facility: allocate costs by utility service function, develop customer specific allocation factors and allocate cost to customer classes. However, the functions of service are unique to the collection operation. The functions of service to which the collection operation service costs have been allocated are listed below: Base. These costs are associated City operations (administration, billing, yard waste, drop off, free residential waste drop off and the processing facility and other services). Volume. These costs are associated with City operations and LSI collection. Collection’s Share of Solid Waste Processing Facility. These costs relate to operating the facility, other related operations and landfill closure costs. Collection’s Share of Disposal/Landfill. These costs relate to fees paid to Waste Connection for transport and disposal of municipal solid waste to the landfill in Oregon. Recycling. These are costs related to fees paid to LSI for operation of the recycling program and center. Compost. These costs relate to fees paid to LSI for composting and yard waste services. Direct Assignment. These costs relate to residential customer household hazardous waste. Exhibit 3.14 provides a summary of the collection service functional cost allocation results. Exhibit 3.14: Collection Operation Functional Cost Allocation Summary Base 15.22% Volume 48.83% Recycling 8.09% Compost 4.04% Solid Waste PF 6.44% Disposal/ Landfill 17.02% Hazardous Waste 0.37% 16 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 E.2 Allocation Factors Allocation factors are developed to derive the cost of service for each collection service. The allocation factors are intended to equitably allocate total collection costs to those benefitting from the service. For this study, the collection costs were allocated based on the following: Base – Allocated by number of billable units. Volume – Allocated by container size, frequency of pickup and number of containers. Recycling – Allocated based on a 36 gallon residential equivalent unit Compost – Allocated to residential only. Solid Waste Processing Facility – Allocated by container size, pickups and number of containers. Disposal/Landfill – Allocated by container size, pickups and number of containers. Direct Assignment – Allocated to residential only. E.3 Collection Cost of Service The total allocated cost distributed by the allocation factors results in the cost of service for each class/container size. Exhibit 3.15 summarizes the cost of service rates per account. Exhibit 3.15: Summary of Collection System Cost of Service Rates Residential Base 6.67 $ 1.23 $ 1.92 $ 9.81 $ Residential Volume 6.40 6.40 Commercial Cans 1 can 6.49 9.66 1.23 17.37 2 cans 6.49 19.31 2.45 28.25 Mechanical Containers 1 yd 6.49 54.17 6.88 67.54 2 yd 6.49 108.35 13.75 128.59 3 yd 6.49 162.52 20.63 189.64 4 yd 6.49 216.70 27.50 250.69 6 yd 6.49 325.04 41.26 372.79 8 yd 6.49 433.39 55.01 494.89 Notes: Base includes Direct Assignment to Residential Volume includes Solid Waste PF and Disposal/ Landfill Sample rates above do not include the full detailed rate schedule Class / Container Size BASE VOLUME RECYCLING COMPOST COSA TOTAL 17 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 E.4 Rate Issues Similar to the processing facility, the collection service rates appear to warrant adjustments between container sizes. Along with discussing the cost of service results with the Committee, other rate issues were addressed. A survey was provided to Committee members for their feedback on key issues. Raise program fee from $1.30 to $1.87 for county residents? The program fee is charged to non-City residents of Latah County per billed rural Latah County Collection Unit. The existing fee is $1.30 per billed collection unit and covers recycling, composting, household hazardous waste, education programs and free tonnage. The current fee generates $90,000 per year The free tonnage includes yard waste, scrap metal, white goods demolition debris up to 500lbs per day, MSW up to 100lbs per day, Appliance disposal (without CFC) and 100lbs of tires. A cost analysis was completed for the program fee indicating the fee should be increased to $1.87 The committee recommended maintaining the existing rate at $1.30 but eliminating the free tonnage included in the fee. Institute a program fee for UofI on campus students? The issue is whether to charge students for use of sanitation programs since they are available free to UofI students who live on-campus The Committee felt that the new revenue that may be realized from this program fee may not outweigh the administrative burden. This fee was not recommended. Eliminate UofI 5% administrative fee? The majority of the Committee voted in favor of eliminating the UofI 5% administrative fee Hold collection rates at existing level or charge full cost of service rates? The majority of the Committee voted to hold collection rates at existing level Holding rates can defer a collection rate increase until FY 2015 18 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 E.5 Proposed Collection Rates The final rates recommended for the collection system were a result of the cost of service analysis and extensive discussion and analysis with staff and the Committee on the other rate related issues previously identified. In addition, the City implemented a new Roll Cart Program that converts the existing residential and commercial can program to different size roll carts. The change to the roll cart system was effective August 1, 2013. Exhibit 3.16 summarizes the recommended rates for the collection system. Exhibit 3.16: Summary of Collection System Proposed Rates The residential base and volume rates were converted to the new roll cart system with 35, 65 and 95 gallon carts. The commercial 1can and 2 can rate was also converted to the new roll cart system with 35, 65 and 95 gallon carts. The collection system revenue level is maintained at existing levels through 2015. Rates between container sizes were adjusted based on the cost of service results; however the changes are revenue neutral. The full rate schedules can be found in the Technical Appendix. F. SUMMARY The sanitation rate study includes a review of both the solid waste processing facility and the collection service. On a combined basis, the sanitation fund requires a 3.0 percent per year increase in FY 2013 through FY 2020. Upon further review of the independent services, the collection service appears to be over-collecting and the processing facility appears to be under-collecting. The unit costs identified in the cost of service will begin to correct the revenue disparity between the two services. The collection revenue levels will be maintained at current levels until 2015 at which point it will increase by the overall average annual adjustments. The new roll cart program for residential Residential Base Fee 11.85 $ 10.15 $ Service Level - One Can 6.65 6.60 Residential Roll Cart Program 35 Gallon 17.65 $ 17.65 $ 18.20 $ 18.75 $ 19.30 $ 19.90 $ 20.50 $ 21.10 $ 65 Gallon 23.15 23.15 23.85 24.55 25.30 26.05 26.85 27.65 90 Gallon 28.65 28.65 29.50 30.40 31.30 32.25 33.20 34.20 Commercial Can 1x1 time 20.65 $ 17.95 $ 2x1 time 30.30 29.25 Commercial Roll Cart Program 35 Gallon 18.85 $ 18.85 $ 19.40 $ 20.00 $ 20.60 $ 21.20 $ 21.85 $ 22.50 $ 65 Gallon 28.45 28.45 29.30 30.20 31.10 32.05 33.00 34.00 90 Gallon 38.00 38.00 39.15 40.30 41.50 42.75 44.05 45.35 Mechanical Containers 1 yd 58.95 $ 69.85 $ 69.85 $ 71.95 $ 74.10 $ 76.30 $ 78.60 $ 80.95 $ 83.40 $ 2 yd 117.85 133.05 133.05 137.05 141.15 145.40 149.75 154.25 158.90 3 yd 176.75 196.20 196.20 202.10 208.15 214.40 220.85 227.50 234.35 4 yd 235.70 259.35 259.35 267.15 275.15 283.40 291.90 300.65 309.65 6 yd 353.55 385.65 385.65 397.20 409.10 421.35 434.00 447.00 460.40 8 yd 471.40 512.00 512.00 527.35 543.15 559.45 576.25 593.55 611.35 FY 2017 FY 2018 FY 2019 FY2020 Class/Container Size Existing Proposed FY2013 FY 2014 FY 2015 FY 2016 19 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 and commercial customers became effective August 1, 2013. The solid waste processing facility implemented the proposed cost of service based adjustment in FY 2013 after which the increase will be tied to the overall annual increase of 3.0 percent per year. We recommend that the City annually revisit the rate study to review if revenue and expense projections are consistent when compared to actual experience. If significant changes have or are anticipated to occur the City should update the rate study and rate plan to incorporate the changes. Any significant or unexpected changes will require adjustment to the rate strategy proposed. A more detailed study should be completed as the future disposal option studies are completed and the City has a better understand of the future needs of the fund. The detailed technical exhibits developed as part of the sanitation fund rate study can be found at the end of this report in the Technical Appendices. 20 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 SECTION IV: WATER UTILITY A. INTRODUCTION The City of Moscow owns and operates its water system. The system provides water to customers within the City limits with the exception of the University of Idaho which maintains a separate water system. Water service is provided to a population of approximately 23,000. The City has five active groundwater wells that depend upon the Palouse Groundwater Aquifer for supply. The water is treated with chlorine gas prior to distribution. Water is delivered by four storage reservoirs, six booster stations and 93 miles of water mains. The City of Moscow’s Department of Public Works ensures that the water provided meets state and federal standards. B. REVENUE REQUIREMENT A revenue requirement analysis forms the basis for a long-range financial plan and multi-year rate management strategy. The analysis is developed by identifying current and future annual operating costs and capital/equipment funding needs. B.1 Operating Forecast The purpose of the operating forecast is to determine whether the existing rates and charges are sufficient to recover the costs the City incurs to operate and maintain the water system. The FY 2014 budget formed the baseline for this forecast. The operating forecast was developed for the FY 2015 through FY 2020 time period. The following list highlights some of the key assumptions used in the development of the water utility operating forecast. Reserves Operating Reserves. A minimum of 25 percent, or 90 days, of total expenses ($1.1 to $1.5 million, per discussion with City staff). Capital Contingency Reserves. A target of 1 percent of plant in service ($210,000 to $390,000, per discussion with City staff and industry standards). Operating Revenue Retail Rate Revenue. Based on actual detailed customer accounts and use statistics from the City’s billing system. Non Rate Revenue. Non rate revenue consists of water permit fees, turn on/off, physical connection charges and interest income and other miscellaneous revenue. Customer Growth. A 0.5 percent per year increase was applied to forecast revenue in FY 2014 and FY 2015, followed by a 0.75 percent growth rate in FY 2016 and FY 2017 and 1.0 percent per year thereafter. 21 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Interest Earnings. A rate of 1.00 percent per year (based on discussion with City staff). O&M Expenses General Cost Inflation. 2.68 percent per year (based on analysis of five-year historical Consumer Price Index data and discussion with City staff); Construction Cost Inflation. 3.41 percent per year (based on Engineering News Record Construction Cost Index 5-year average); Labor Cost Inflation. 3.00 percent per year (based on discussions with City staff); Benefits. 10.00 percent per year (based on discussion with City staff). Debt Service Existing Debt. The water fund has no existing debt service. New Debt. Four new debt issues are anticipated to fund the $20.9 million ($18.7 million 2014$) capital program. $2.7 million DEQ loan in FY 2014 for Well 10 and Transmission Improvements $2.4 million revenue bond in FY 2014 for the Northwest Tank Replacement $2.3 million revenue bond in FY 2017 for Operations Facility $5.5 million revenue bond in FY 2020 for the New Reservoir and long-term water supply facility The four new debt issues will add $366,000 to $1.1 million in new annual debt service. System Reinvestment System reinvestment funding is to ensure system integrity through reinvestment in the system. Ideally, the minimum funding would be an amount equal to or greater than depreciation expense. This financial plan begins to fund system reinvestment starting at $150,000 per year increasing to $400,000 by the end of the time period. This level of funding falls short of the projected depreciation expense of over $900,000 by FY 2020. Since the water fund is taking on future debt obligations, the level of system reinvestment funding targeted is closer to depreciation less debt principal outstanding. The City should continue to increase the level of system reinvestment funding supported through future rate revenue. B.2 Capital Funding Plan The water utility is anticipating $20.9 million in capital costs in FY 2014 through FY 2020 inflated at 3.41 percent per year to date of construction. Some of the more significant projects include; well 10, long-term alternative water supply facilities, northwest tank replacement, new water tank/reservoir and the operations facility. Funding for the capital identified includes cash balances (including interest), rate funded system reinvestment, general facility charge revenue and new debt service. New revenue bonds and loans account for 62 percent of the capital funding. Exhibit 4.1 identifies the anticipated use of annual funding sources to cover the total capital projects in any given year. Any additional funding available beyond what is needed to cover the annual capital costs will be added to reserves for use in the future. A detailed capital plan can be found in the water Technical Appendix. 22 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Exhibit 4.1: Water Capital Funding Summary B.3 Summary of Revenue Requirement The components of O&M expenses, debt service that funds the capital improvement program and cash funded system reinvestment combined form the multi-year revenue requirement. The revenue requirement is compared to the overall revenue available to the water fund to evaluate the sufficiency of rates on an annual basis. Exhibit 4.2 provides a comparison of the water fund revenue requirement to the existing revenue. Exhibit 4.2: Comparison of Water Fund Existing Revenue to Revenue Requirement Summary of Water Revenue Requirement: Current rate revenue levels are not sufficient to meet existing water fund annual financial obligations; Existing rate revenue is deficient $730,000 increasing to $2.1 million; Funding Summary FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Total Total Capital Costs 2,624,750 $ 4,633,885 $ 1,116,512 $ 1,177,249 $ 3,342,613 $ 986,327 $ 7,040,037 $ 20,921,372 $ Funding Sources Cash Balances - $ 1,797,109 $ 966,512 $ - $ 1,994,140 $ 686,327 $ 1,231,219 $ 6,675,307 $ Rate Funded Capital - 323,335 150,000 - 250,000 300,000 300,000 1,323,335 Loan Proceeds 2,624,750 75,250 - - - - - 2,700,000 Revenue Bond Proceeds - 2,438,191 - 1,177,249 1,098,473 - 5,508,818 10,222,730 Total Capital Funding 2,624,750 $ 4,633,885 $ 1,116,512 $ 1,177,249 $ 3,342,613 $ 986,327 $ 7,040,037 $ 20,921,372 $ 0 1000000 2000000 3000000 4000000 5000000 6000000 7000000 2014 2015 2016 2017 2018 2019 2020 Cash Operating Expenses Transfers New Debt Service Capital Funding Total Existing Revenue 23 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 To meet the total projected financial obligations of the water fund, rate increases are proposed at 10.0 percent in FY 2014 through 2015 followed by 6.3 percent increases in FY 2016 through 2019 and a 3.5 percent increase in 2020; Increased revenue supports : $12.9 million in new debt proceeds to fund capital project costs resulting in $366,000 to $1.1 million in annual debt service. Cash funded system reinvestment capital is increased over time from $150,000 to $400,000 per year; The operating fund balance is at or near the target 90 day level in all years; The capital fund target of 1.0 percent of plant in service is exceeded in every year of the study period with the exception of 2020 due to the large capital costs during that year; and Debt service coverage is well above the 1.25 minimum bond covenant requirement. This is favorable as the City will need to access future debt. C. COST OF SERVICE A cost-of-service analysis determines the equitable recovery of costs from customers according to unique demands each class places on the system. There are three fundamental steps to allocating the calculated annual revenue requirement to customer classes and developing the final rates – 1) allocate total utility costs by function, 2) develop customer specific allocation factors and 3) allocate costs to customer classes. The methodology used conforms to industry standards as identified by the American Water Works Association (AWWA) Principles of Water Rates, Fees and Charges, M1 Manual. The functions of service to which water service costs were allocated are listed below: Customer. These are the costs associated with establishing, maintaining, and serving water customers and tend to include administrative and billing costs and customer service. These costs are generally uniform by customer regardless of their meter size and demand placed on the water system. Meters & Services Costs. These costs are associated with installation, maintenance, and repairs of meters and services. These costs are typically associated with the number of connections and meter size. Base Costs. These costs relate to average service provided on demand and are essentially correlated with year-round water consumption. Peak Costs. These costs relate to peak demand service typically associated with the ability of the system to provide capacity to customers with higher than average volume, which usually occurs during the summer months. Fire Protection. These are the costs associated with the ability of the system to provide adequate capacity and water flow corresponding to minimum fire safety standards required to serve its customer demographic. These are mostly incremental costs related to providing storage, transmission capacity, and hydrants for fire protection. Exhibit 4.3 provides a summary of the functional cost allocation results. 24 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Exhibit 4.3: Water Utility Functional Cost Allocation Summary The water utility cost allocation indicates that the majority of costs (36 percent) relate to meeting peak demands. C.1 Customer Class Distinctions The City’s current customer classes consist of residential (including single family, duplex and triplex with individual meter per unit), non-residential (including multi-family with one meter serving multiple units and commercial) and cemetery. Although the multi-family class is stated separately in the City’s rate schedule, the rate schedule is the same as the non-residential rate; therefore, this class was combined for the cost of service evaluation. The cost of service was completed for the following classes: Residential Non-residential Cemetery One of the main objectives of the cost of service rate study is to evaluate if cost differences exist when serving different customer classes of the system. C.2 Allocation Factors Once the customer classes were defined, functional cost pools (shown in Exhibit 4.3) were then allocated to these customer classes based on the demand each class places on the system. In order to complete this task, the analysis consisted of first developing allocation factors that identified customer characteristics including number of accounts, consumption levels, peak demand patterns, and fire flow requirements. The allocation factors are intended to equitably allocate total costs to those benefitting from the service. For this study, the water fund costs were allocated based on the following: Customer. Based on customer accounts. Meters & Services Costs. Based on number of meter service equivalents. Base Costs. Based on total annual water use. Peak Costs. Based on use during the class’ peak period CUSTOMER, $800,969 , 21% METER/ SERVICES, $524,363 , 14% BASE, $595,845 , 15% PEAK, $1,365,624 , 36% FIRE PROTECTION, $548,179 , 14% 25 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Fire Protection. Based on fire flow requirements identified in the City’s Comprehensive Plan. Fire flow requirements expressed in a rate of 1,500 to 4,750 gallons per minute. C.3 Water Fund Cost of Service Exhibit 4.4 provides a comparison between current rate revenue distribution between customer classes and the results of the cost-of-service analysis. Exhibit 4.4: Comparison of Water Current Revenue Distribution to Cost-of-Service Distribution The cost of service shows some interclass adjustments are warranted as shown by the change in revenue distribution. The residential and non-residential classes are close to the overall 10 percent average increase for the system. The cemetery class has the greatest disparity to reach cost of service. To minimize the rate impact to the cemetery class, a few options were presented for consideration: 1. No cost of service adjustment and apply the non-residential rate increase 2. Phase-in to full cost of service by 2020 3. Partial phase-in to tie to non-residential rates by 2020 Option 3 was selected that moved towards a partial phase-in of the cemetery cost of service by the year 2020. This option helped reduce the impact on the cemetery class, it also allows the cemetery to implement operational changes that could reduce their cost of service allocation in the future. Since this class will not be paying the full allocated cost of service, it required that the proposed rates for the residential and non-residential classes increase to meet the total revenue requirement of the fund. It is important to note that the cemetery will only be at 49.00 percent of its full cost of service at the end of the study period. Exhibit 4.5 provides a comparison of the current rate revenue distribution between customer classes and the revised cost-of-service analysis with the cemetery phase-in. Exhibit 4.5: Comparison of Current Revenue Distribution to Cemetery Phase-in Cost-of-Service Distribution The cost of service adjustments as shown in Exhibit 4.5 will be implemented during the first year of the study period (FY 2014). All future rate adjustments should be applied equally to the residential and non-residential class. The cemetery will be phased-in to the non-residential volume rate by FY 2020. Residential 1,915,530 $ 54.92% 2,046,784 $ 53.35% 131,254 $ 6.85% Non Residential 1,560,640 44.75% 1,730,340 45.10% 169,700 10.87% Cemetery 11,431 0.33% 59,237 1.54% 47,806 418.21% Total 3,487,601 $ 100.00% 3,836,361 $ 100.00% 348,760 $ 10.00% Change Percent of Total Percent of Total Class Current FY2014 Revenue COSA 2014 Percent of Total Residential 1,915,530 $ 54.92% 2,065,879 $ 53.85% 150,349 $ 7.85% Non Residential 1,560,640 44.75% 1,746,482 45.52% 185,842 11.91% Cemetery 11,431 0.33% 24,000 0.63% 12,569 109.96% Total 3,487,601 $ 100.00% 3,836,361 $ 100.00% 348,760 $ 10.00% Class Current FY2014 Revenue Percent of Total Revised COSA 2014 Percent of Total Change Percent of Total 26 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 D. RATE DESIGN The principal objective of the rate design stage of this rate study was to implement water rate structures that collect the appropriate level of revenue. Establishing rates is a blend of “Art” and “Science” and especially so when it comes to the rate levels and structures. Several variables must be balanced to arrive at optimal rates. The results of the revenue requirement analysis were used to develop new water rate alternatives to recover the projected revenue from customers. D.1 Existing Water Rates The existing water rates are composed of a fixed charge and a variable consumption charge per hundred cubic feet (CCF) for all water use. All customers pay the same fixed charges depending on their meter size. The commodity charge is different by customer class. The residential class has a three block structure that increases the rate as more water is used. Block 1 = 0 - 7 CCF, Block 2 = 7.01 - 20 CCF and Block 3 = 20.01+ CCF. The non residential class pays a uniform consumption rate for all water use. The cemetery has a separate uniform consumption rate that is also based on all water use. Exhibit 4.6 provides a summary of the existing water utility rates. Exhibit 4.6: Existing Water Rates 5/8" 20.65 $ 1" 25.85 1.5" 51.55 2" 82.45 3" 154.55 4" 260.55 Block 1 (0-7) ccf 1.75 $ Block 2 (7.01-20) ccf 2.10 Block 3 (20.01+) ccf 3.55 Non Residential 2.10 $ Cemetery 0.85 Meter Existing Fixed Charges Consumption Charge Residential Non Residential 27 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 D.2 Proposed Water Rates No rate structure changes were proposed for the water utility. Three options were developed for consideration to apply the rate increase. 1. Across the board adjustments – equal increases to the fixed meter charge and variable consumption charges. 2. Increase the fixed charge more than the consumption charge to account for the increase in future fixed cost to the system (e.g. new debt service and cash funded capital), consumption charge to collect the remainder. 3. Increase the fixed charge by the overall average increase, consumption charge to collect the remainder. Since all customers pay the same service fixed meter charges, any change in the service charge for the residential rate applied to all classes. The City chose to apply option 2. Exhibit 4.7 provides a summary of the selected option proposed rates for the 7-year study period. Exhibit 4.7: Proposed Water Rates 5/8" 20.65 $ 23.65 $ 26.00 $ 27.65 $ 29.40 $ 31.25 $ 33.20 $ 34.35 $ 1" 25.85 29.61 32.55 34.60 36.80 39.10 41.55 43.00 1.5" 51.55 59.04 64.95 69.05 73.40 78.00 82.90 85.80 2" 82.45 94.43 103.90 110.45 117.40 124.80 132.65 137.30 3" 154.55 177.02 194.70 206.95 220.00 233.85 248.60 257.30 4" 260.55 298.42 328.25 348.95 370.95 394.30 419.15 433.80 Block 1 (0-7) ccf 1.75 $ 1.74 $ 1.90 $ 2.02 $ 2.15 $ 2.28 $ 2.43 $ 2.51 $ Block 2 (7.01-20) ccf 2.10 2.09 2.30 2.44 2.60 2.76 2.94 3.04 Block 3 (20.01+) ccf 3.55 3.53 3.90 4.15 4.41 4.68 4.98 5.15 Non Residential 2.10 $ 2.32 $ 2.55 $ 2.70 $ 2.85 $ 3.05 $ 3.25 $ 3.35 $ Cemetery 0.85 1.88 2.10 2.30 2.50 2.80 3.05 3.35 FY2018 FY2019 FY2020 Non Residential Meter Existing Fixed Charges FY2014 FY2015 Consumption Charge Residential FY2016 FY2017 28 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 E. SUMMARY The analysis described above concludes the rate study for the water utility. After performing a rate revenue analysis it was identified that the revenues at current levels are not sufficient to fund ongoing water system obligations and the planned $20.9 million in capital project costs. Although existing cash balances, rate funding and general facility charge revenue will help fund the capital program, $11.1 million in revenue bond issues (including bond reserves) and $2.7 million in loan proceeds are required to complete the capital plan. As a result a 10.00 percent increase is proposed in FY 2014 and FY 2015 followed by 6.3 percent annual increases in FY 2016 through FY 2019 and a 3.5 percent increase in 2020. The cost of service adjustments recommended for the residential and non-residential class will occur in FY 2014 and all future increases are anticipated to be applied equally to each class of service and to the fixed meter charges and variable consumption charges. The cemetery class will be phased-in to the non-residential consumption rate by FY 2020 We recommend that the City revisit the study findings during each budget cycle to check that the assumptions used are still appropriate and no significant changes have occurred that would alter the results of the study. The City should use the study findings as a living document, continuously referencing the study outcomes to actual revenues and expenses. Any significant or unexpected changes will require adjustment to the rate strategy proposed. The detailed technical exhibits developed as part of the water rate study can be found at the end of this report in the Technical Appendices. 29 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 SECTION V: WASTEWATER UTILITY A. INTRODUCTION The City of Moscow owns and operates an advanced secondary treatment wastewater treatment plant that was completely replaced in 2002 with a Biological Nutrient Removal (BNR) process. Most recently, effluent filters were added to enhance phosphorus removal. The City is regulated under the Environmental Protection Agency National Pollutant Discharge Elimination System (NPDES) permit and discharges the treated wastewater into Paradise Creek on the west side of Moscow. The City provides service to a population of approximately 25,000. The collection system services all of the City of Moscow, the SE Moscow Water and Sewer District and the University of Idaho (UofI). Approximately 81 miles of pipelines to 36”), 1,820 manholes; and four lift stations complete the collection system. UI owns and operates its own collection system on campus. B. REVENUE REQUIREMENT Similar to the water utility, a revenue requirement was completed for the wastewater utility and forms the basis for the long-range financial plan and multi-year financial management strategy. B.1 Operating Forecast The purpose of the operating forecast is to determine whether the existing rates and charges are sufficient to recover the costs the City incurs to operate and maintain the wastewater system. The FY 2014 budget formed the baseline for this forecast. The operating forecast was developed for the FY 2015 through FY 2020 time period. The following list highlights some of the key assumptions used in the development of the wastewater utility operating forecast. Reserves Operating Reserves. A minimum target of 25 percent, or 90 days, of total expenses ($1.6 to $1.9 million, per discussion with City staff). The fund nearly reaches this minimum target by the end of the planning period. Capital Contingency Reserves. A target of 1 percent of plant in service ($520,000 to $700,000, per discussion with City staff and industry standards). Operating Revenue Retail Rate Revenue. Based on actual detailed customer statistics from the City’s billing system; Non Rate Revenue. Consists of sewer tap and refunds and reimbursements. Customer Growth. For consistency, customer growth was tied to the water utility. A 0.50 percent growth rate is used for FY 2014 and 2015, 0.75 percent for FY 2016 and 2017 and 1.00 percent per year growth rate thereafter; and 30 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Interest Earnings. A Rate of 1.00 percent per year (based on discussion with City staff). O&M Expenses General Cost Inflation. 2.68 percent per year (based on analysis of five-year historical Consumer Price Index data and discussion with City staff); Construction Cost Inflation. 3.41 percent per year (based on Engineering News Record Construction Cost Index 5-year average); Labor Cost Inflation. 3.00 percent per year (based on discussion with City staff); Benefits. 10.00 percent per year (based on discussion with City staff). Debt Service Existing Debt. The wastewater utility’s existing debt service consists of the following: 2011 refinancing of 2002 revenue bonds that carry an annual debt obligation of approximately $700,000. 2008 revenue bonds that carry an annual debt obligation of approximately $450,000 New Debt. Three new debt issues are anticipated to fund the $20.3 million ($18.6 million 2014$) capital program. $7.5 million revenue bond in FY 2015 for WWTP Phase V $2.3 million revenue bond in FY 2017 for Operations Facility $1.5 million revenue bond in FY 2020 for Main Replacements The three new debt issues will add $668,000 to $1.0 million in new annual debt service System Reinvestment System reinvestment funding is to ensure system integrity through reinvestment in the system. Ideally, the minimum funding would be an amount equal to or greater than depreciation expense. This study assumes annual funding for system reinvestment is phased-in up to depreciation levels by 2020. Funding begins at $450,000 per year increasing to $1.0 million. B.2 Capital Funding Plan The wastewater utility is anticipating $20.3 million in capital costs in FY 2014 through FY 2020 inflated at 3.41 percent per year to date of construction. Some of the more significant capital projects include; WWTP Phase V, sewer pipe replacement program, SW trunk line phase 4 and phase 5 and the operations facility. Funding for the capital identified include cash balances (including interest), rate funded system reinvestment, general facility charge revenue and new debt service. New revenue bonds account for 56 percent of the capital funding. Exhibit 5.1 identifies the anticipated use of annual funding sources to cover the total capital projects in any given year. Any additional funding available beyond what is needed to cover the annual capital costs will be added to reserves for use in the future. Exhibit 5.1: Wastewater Capital Funding Summary Funding Summary FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Total Total Capital Costs 2,015,575 $ 5,917,094 $ 4,299,869 $ 958,740 $ 3,336,781 $ 941,274 $ 2,790,482 $ 20,259,815 $ Funding Sources Cash Balances 2,015,575 $ - $ 2,132,199 $ - $ 1,269,799 $ 91,274 $ 316,980 $ 5,825,828 $ Rate Funded Capital - - 550,000 - 750,000 850,000 1,000,000 3,150,000 Revenue Bonds Proceeds - 5,917,094 1,617,670 958,740 1,316,982 - 1,473,502 11,283,988 Total Capital Funding 2,015,575 $ 5,917,094 $ 4,299,869 $ 958,740 $ 3,336,781 $ 941,274 $ 2,790,482 $ 20,259,815 $ 31 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 A detailed capital plan can be found in the wastewater Technical Appendix. B.3 Summary of Revenue Requirement The components of O&M expenses, debt service and cash funded system reinvestment combine to form the multi-year revenue requirement. The revenue requirement is compared to the overall revenue available to the wastewater fund to evaluate the sufficiency of rates on an annual basis. Exhibit 5.2 provides a comparison of the wastewater fund revenue requirement to the existing revenue. Exhibit 5.2: Comparison of Wastewater Fund Existing Revenue to Revenue Requirement Summary of Wastewater Revenue Requirement: Current revenue levels are not sufficient to meet existing wastewater fund annual obligations. The annual existing rate deficiency is $1.1 million in FY 2014 increasing to $2.5 million by FY 2020 To meet the total projected financial obligations like the capital plan and system reinvestment of the wastewater fund, rate increases are proposed at 7.5 percent in FY 2014, 2015 and 2016, decreasing to 4.5 percent in FY 2017 and 2018 and 4.0 percent in FY 2019 and 2020; Increased revenue supports $11.3 million in new debt proceeds is added to fund capital projects resulting in an additional $668,000 to $1 million in annual debt service. Cash funded system reinvestment capital is increased over time from $450,000 to $1 million. The operating fund remains below the target balance of 90 days during the study period. The balance increases to 88 days by FY 2020; 0 1000000 2000000 3000000 4000000 5000000 6000000 7000000 8000000 9000000 2014 2015 2016 2017 2018 2019 2020 Cash Operating Expenses Transfers Existing Debt Service New Debt Service Capital Funding Total Existing Revenue 32 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Due to the significant level of capital funding needs during the time period, the capital fund is positive, however does not achieve the 1.0 percent of plant in service target; Debt service coverage ranges from a low of 1.40 to a high of 1.79. The City holds a coverage stabilization reserve of $450,000 that can be accessed in any year if coverage does not meet the minimum requirements. C. WASTEWATER COST-OF-SERVICE ANALYSIS Similar to the water utility, the cost-of-service allocation process for the wastewater utility involves three steps - 1) allocate total utility costs by function, 2) develop customer specific allocation factors and 3) allocate costs to customer classes. The methodology used conforms to industry standards as identified by the Water Environment Federation (WEF) Financing and Charges for Wastewater Systems Manual 27. The functions of service to which wastewater service costs have been allocated are listed below: Customer. These costs are associated with providing service to customers regardless of wastewater contribution, such as billing and office support. Wastewater Flow. These costs relate to actual and estimated wastewater volume processed within the system in a year. Strength. These costs reflect strength of sewage processed. Strength is tracked by two measurements – biochemical oxygen demand (BOD) and total suspended solids (TSS). BOD is the parameter used to characterize the organic strength of wastewater and TSS is the parameter that measures the amount of particles suspended in water that will not pass through a filter and require treatment. Exhibit 5.3 provides a summary of the functional cost allocation results. Exhibit 5.3: Wastewater Utility Functional Cost Allocation Summary . The wastewater utility cost allocation indicates that 40 percent of the costs are related to strength and 55 percent are related to flow. CUSTOMER, $278,616 , 5% FLOW, $3,190,855 , 55% BOD, $1,318,429 , 23% TSS, $1,026,434 , 17% 33 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 C.1 Customer Class Distinctions The City’s current wastewater customer classes consist of 13 separate classes of service. Single family Trailer Homes Multi family (includes duplex) Motels Rooming House Schools Churches Bars & Taverns Restaurants Other Commercial Mixed use <10 units Mixed use >10 units University of Idaho The cost of service analysis evaluated 10 classes of service. Trailer homes were combined with multi-family and both churches and bars/taverns were combined into the other commercial class. The combined classes were deemed appropriate since the existing rates as well as strength characteristics were very similar. C.2 Customer Class Allocations The next step in the cost-of-service analysis, involved distribution of the allocated system costs to the customer classes served by the system. The functionally allocated system-wide costs are allocated to these customer classes as follows: Customer costs are allocated to the customer classes based on their proportional share of total system number of accounts. Wastewater flow costs are allocated based on annual and estimated volume contributed to the wastewater system. Billed volume was used for customers with a consumption charge. All other customer’s volume was based on estimated gallons per capita day figures from the Comprehensive Plan and historical water consumption. Strength related costs were allocated based on average flow adjusted for the different strength factors associated with each customer class. The strength factors applied rely on the previous cost of service analysis with additional monitoring data applied to refine the restaurant class Residential or domestic strength is (216 mg/l BOD and 245 mg/l SS). Motels, schools and restaurants are the only classes above domestic strength (310mg/l, 250 mg/l and 500 mg/l respectively for BOD) and only schools and restaurants are above domestic strength for TSS (350 mg/l and 500 mg/l respectively); The University of Idaho based on flow monitoring data (216 mg/l BOD and 245 mg/l SS) derived in an apportionment study conducted by the Moscow Sewer Department. 34 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 C.3 Wastewater Cost of Service Exhibit 5.4 provides a comparison of the distribution of revenues under existing rates to the distribution of revenues indicated from the cost-of-service analysis. Exhibit 5.4: Comparison of Wastewater Current Revenue Distribution to Cost-of-Service Distribution Some interclass adjustments are warranted as shown in the cost of service results. Single family shows a below average increase of 1.44 percent Multi family and the mixed use classes show a rate reduction All other classes show an increase ranging from 14 percent to 80 percent. The schools and restaurant show similar results to the last study which indicated the cost of service phase-in would likely continue through this (next) rate study. To minimize a significant rate impact to any customer class, a two-year cost of service phase-in is recommended. Exhibit 5.5 provides a summary of the proposed two-year cost of service phase-in. Exhibit 5.5: Wastewater Two-Year Cost-of-Service Phase-in Singlefamily 1,970,107 $ 36.42% 1,998,406 $ 34.37% (28,300) $ 1.44% Multifamily 1,787,338 33.05% 1,751,811 30.13% 35,527 -1.99% Motels 87,847 1.62% 106,545 1.83% (18,697) 21.28% Rooming House 114,016 2.11% 130,053 2.24% (16,037) 14.07% Schools Sewer 30,307 0.56% 49,895 0.86% (19,588) 64.63% Other Commercial 427,846 7.91% 560,170 9.63% (132,324) 30.93% Restaurants Sewer 125,992 2.33% 227,419 3.91% (101,427) 80.50% Mixed Use < 10 78,542 1.45% 65,664 1.13% 12,879 -16.40% Mixed Use > 10 45,428 0.84% 35,450 0.61% 9,978 -21.96% UofI 741,260 13.70% 888,922 15.29% (147,662) 19.92% Total 5,408,683 $ 100.00% 5,814,335 $ 100.00% (405,651) $ 7.50% Change Percent of Total Class Current FY2014 Revenue Percent of Total COSA 2014 Percent of Total Singlefamily 2,057,382 $ 2,159,028 $ 4.43% 4.42% Multifamily 1,787,338 1,892,613 0.00% 5.36% Motels 100,313 115,108 14.19% 14.18% Rooming House 126,262 140,506 10.74% 10.73% Schools Sewer 40,320 53,905 33.04% 33.03% Other Commercial 507,597 605,193 18.64% 18.63% Restaurants Sewer 175,507 245,698 39.30% 39.30% Mixed Use < 10 74,458 70,941 -5.20% -5.20% Mixed Use > 10 41,608 38,300 -8.41% -8.41% UofI 841,627 955,591 13.54% 13.54% Total 5,752,411 $ 6,276,884 $ 6.36% 8.57% 2015% Phase-In FY 2014 Phase-in FY 2015 2014% Class 35 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 The cost of service adjustments as shown in Exhibit 5.5 will be implemented during FY 2014 and FY 2015. The overall average rate increase for FY 2014 should be 7.50 percent. Due to the two-year phase in, the City will be using approximately $62,000 of fund balance to cover the revenue requirement in that year. The residential class will see a lower than average increase in both FY 2014 and 2015. The multi family class will have no rate change in FY 2014 and a lower than average increase in FY 2015. The mixed use class will see a rate reduction in both years. All future rate adjustments should be applied equally to each class of service. D. RATE DESIGN The principal objective of the rate design stage is to implement rate structures that collect the appropriate level of revenue as outlined by the revenue requirement. D.1 Existing Wastewater Rates The existing wastewater rates consist of a fixed flat rate for some classes and a fixed rate plus volume rate per hundred cubic feet (CCF) of flow (metered water used as surrogate) for other classes. Single family pays a fixed charge per account. Multi family and motels pay a fixed charge per unit. Rooming houses, schools and other commercial are charged a fixed charge plus a consumption charge for all flow. The mixed use < 10 units and > 10 units includes a fixed charge, a consumption charge for all flow plus an extra unit charge. University of Idaho pays a fixed rate based on their cost of service allocation. Exhibit 5.6 provides a summary of the existing wastewater utility rates. 36 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 Exhibit 5.6: Existing Wastewater Rates D.2 Proposed Wastewater Rates No rate structure changes were proposed at this time for the wastewater system. The cost of service phase-in identified in the previous section is applied equally to each applicable rate component for each class. Exhibit 5.7 provides a summary of the proposed rates for the multi-year rate period. FY 2014 and FY 2015 implement the cost of service changes by class, rates beginning in FY 2016 are applied equally to each customer class and to each rate component (fixed and variable charges, where applicable). Exhibit 5.7 provides a summary of rates for the 7-year study period. Exhibit 5.7: Proposed Wastewater Rates Singlefamily 37.80 $ Multifamily 28.70 Motels 12.60 Rooming House 221.25 Schools Sewer 86.10 Other Commercial 40.25 Restaurants Sewer 125.95 Mixed Use < 10 95.35 Mixed Use > 10 95.35 UofI 741,260.00 Mixed Use < 10 22.90 Mixed Use > 10 22.90 Rooming House 2.00 Schools Sewer 2.20 Other Commercial 1.90 Restaurants Sewer 2.95 Mixed Use < 10 2.65 Mixed Use > 10 1.95 Consumption Charges Class Existing Rates Fixed Charges Extra Unit Charges Singlefamily 37.80 $ 39.45 $ 41.20 $ 44.30 $ 46.30 $ 48.40 $ 50.35 $ 52.35 $ Multifamily 28.70 28.70 30.25 32.50 33.95 35.50 36.90 38.40 Motels 12.60 14.40 16.45 17.70 18.50 19.35 20.10 20.90 Rooming House 221.25 245.00 271.30 291.65 304.75 318.45 331.20 344.45 Schools Sewer 86.10 114.55 152.40 163.85 171.20 178.90 186.05 193.50 Other Commercial 40.25 47.75 56.65 60.90 63.65 66.50 69.15 71.90 Restaurants Sewer 125.95 175.45 244.40 262.75 274.55 286.90 298.40 310.35 Mixed Use < 10 95.35 95.35 95.35 102.50 107.10 111.90 116.40 121.05 Mixed Use > 10 95.35 95.35 95.35 102.50 107.10 111.90 116.40 121.05 UofI 741,260.00 841,626.60 955,591.20 1,027,260.55 1,073,487.25 1,121,794.20 1,166,665.95 1,213,332.60 Mixed Use < 10 22.90 20.50 18.35 19.75 20.65 21.60 22.45 23.35 Mixed Use > 10 22.90 20.50 18.35 19.75 20.65 21.60 22.45 23.35 Rooming House 2.00 2.20 2.45 2.65 2.75 2.85 2.95 3.05 Schools Sewer 2.20 2.95 3.90 4.20 4.40 4.60 4.80 5.00 Other Commercial 1.90 2.25 2.65 2.85 3.00 3.15 3.30 3.45 Restaurants Sewer 2.95 4.10 5.70 6.15 6.45 6.75 7.00 7.30 Mixed Use < 10 2.65 2.50 2.35 2.55 2.65 2.75 2.85 2.95 Mixed Use > 10 1.95 1.85 1.75 1.90 2.00 2.10 2.20 2.30 Class Existing Rates FY2020 Fixed Charges Extra Unit Charges Consumption Charges FY2014 FY2015 FY2016 FY2017 FY2018 FY2019 37 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 D.3 Future Rate Design Considerations The cost of service disparity and rate increase adjustments for the restaurant class resulted in a discussion with staff and the Committee regarding wastewater cost drivers. It was explained that cost drivers for wastewater utilities relate to both the amount of flow treated and also the level of strength contributed. The restaurant customer class in particular has a very high strength classification resulting in higher strength costs allocated to this class. An alternative that was discussed for consideration is the idea of combining the commercial accounts and differentiating the rates based on strength contribution rather than customer type. For example, three classes could be developed for the non-residential class that would include a low/domestic strength class, medium strength class and high strength class. The non-residential customers would then be assigned to one of these classes depending on strength contribution. The emphasis of this approach is to better align rates to those causing the cost to be incurred (higher strength customers). Currently, there may be customers included in a class that may not be contributing high strength but because they are a restaurant they are assigned a higher strength and therefore pay a higher rate. Although this would increase equity, flow monitoring individual accounts such as restaurants may be required to determine the proper strength category. This may result in increased labor time and other costs yet to be determined. The committee was interested in the city exploring this option within the next year. Depending on the results, the second year of the cost of service phase-in may require adjustment. E. SUMMARY The analysis described above concludes the wastewater utility rate study. After completing the cost of service rate study it was determined that existing rate levels are not sufficient to meet total wastewater system financial obligations. As capital needs increase, the City will increase the level of rate funded capital and secure $20.3 million in additional debt. Although existing cash balances, rate funding and general facility charge revenue will help fund the capital program, $11.3 million in revenue bond proceeds is required to complete the capital plan (see water edits). To cover the revenue deficiency and phase in cost of service rates over a two year period a 6.4 percent increase is proposed in FY 2014 followed by an 8.6 percent increase in FY 2015. The rate increase projections for the following five years include a 7.5 percent increase in FY 2016 followed by a 4.5 percent increase in FY 2017 and 2018 and a 4.0 percent increase in FY 2019 and FY 2020. The initial revenue requirement results indicated an increase of 7.5 percent in both FY 2014 and 2015. Due to the two-year cost of service phase-in, the rate strategy changed to the increases noted above (6.4 percent in FY 2014 and 8.6 percent for FY 2015). The rate increase will fall short in FY 2014 approximately $62,000 of the target revenue. This amount will be covered by fund balance. We recommend that the City annually revisit the rate study to review if revenue and expense projections are reasonable when compared to actual experience. If significant changes have or are anticipated to occur, the City should update the rate study and rate plan to incorporate the changes. The detailed technical exhibits developed as part of the wastewater rate study can be found at the end of this report in the Technical Appendices. 38 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 SECTION VI: RATE COMMITTEE A key component of the water and wastewater utility rate study was the involvement of the Rate Committee (Committee). The City has historically convened a Committee to obtain customer feedback and engagement in the process. During the course of the study, the consultant and City project team met with the Committee at key milestones to share results, gain feedback and to incorporate suggestions. The following meetings were held with the Committee. Nov. 27, 2012 first meeting with Committee Overview of each system Discussion of capital needs Presented revenue requirement findings Jan. 17 City meeting with Committee Address follow up questions Review capital project needs May 22 meeting with Committee Presented the water and sewer cost of service findings and proposed rates July 8 City Council Workshop (some Committee members in attendance) Presentation of rate study findings and proposed rates 39 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 TECHNICAL APPENDIX 40 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 SANITATION FUND 41 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 SANITATION OPERATIONAL EFFICIENCY EVALUATION AND REVIEW OF REVENUE COLLECTION 42 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 WATER FUND 43 ---PAGE BREAK--- CITY OF MOSCOW Sanitation, Water and Wastewater Rate study October 2013 WASTEWATER FUND 44