May 14, 2002 CHANGE ORDER NO. 1 Project SOUTH MAIN WATER SYSTEM IMPROVEMENTS- 2002 1. Station 1310 + 27: Remove and dispose of an existing fire hydrant lateral & install an 8-inch swing joint Added costs 2. Station 1310 + 27: $420.00 Re-backfill and re-excavate a portion of the trench to allow a gas main that was found in the way to be relocated (by A vista). Added costs . 3. Station 1308 + 20: Furnish and install two cubic yards of concrete to encase a $459.00 sanitary sewer main (per code) that was unexpectedly encountered. Added costs 4. Station 1306 + 93: $265.65 Move a fire hydrant to a new location rather than extend it as had been initially designed. Added costs . 5. Station 1305 + 76: Furnish and install a 6-inch 45 degree fitting w/ thrust block as required to adjust a fire hydrant location. Added costs Page 1 of 2 $565.44 $220.80 2002-23 ---PAGE BREAK--- MAY-14-2002 14: 2'5 6. Station 1303 + 33: furnish and install a 12 x 6 stllillless steel tappi!l8 sleeve w/ thrust block as required 10 move a hydrant COMedian from the old main to the · main l otal Added Amoont, This Change Order . Origi!W Contact Amoum . . H • . . • • . . • • • • • • . . . . . . . . . . :S326.96 SZ,2S7.8S S8!!,9QP.OO RE'V1SED CO!'«IRACT 591,157.85 TOT"'L l:l3 TOTPL P.01