CHANGE ORDER CHANGE ORDER NO.: 01 PROJECT: 1912 Moscow High School Historic Renovation- Phase 1 iNITIATION DATE: April 23, 2001 CONTRACT DATE: February 21, 2001 PROJECT NO.: 9973 TO: OWNER: Citadel Construction, Inc. I 0 I 03 N. Division, Suite l 05 Spokane, W A 99218 Tel: 509/466-2993 Fax: 509/466-4329 Job Site Fax: 208/882-4969 City of Moscow P.O. Box 9203 Moscow, ID 83843 Tel: 208/883-7087 Fax: 208/883-7093 You are directed to make the following changes in this Contract ARCHITECT: Design West Architects 254 E. Main Pullman, W A 99163 TEL. 509/332-3113 FAX 509/332-3327 1. CPR -02, 1.3 Change planters to north of building to concrete sidewalk $ 2,489.52 2. CPR-02, 1.4 3. CPR-02, 1.5 4. CPR-02, 1.6 5. CPR-03 6. CPR-04 SUBTOTAL Credit to remove Display 020 carpet, handrail, & trim $ 720.95) Pave remaining Base Bid parking area $ 7,899.35 Credit for structural slab reinforcing revisions $ (491.40) South window wall lintel revisions $ 603.22 Revised interior waterproofing system . $ 14,099.69 20,879.43 Not valid until signed by both Owner and Architect. Signature of Contractor indicates his agreement herewith. including any adjustment in the contract Sum or contract Time. It is further understood and agreed that this change constitutes compensation in full on behalf of the Contractor and its Subcontractors and Suppliers for all costs directly or indirectly attributable to the changes ordered and fur any and all delays, impacts, disruptions, accelerations and/or extensions of time related thereto. No other compensation shall be allowed for the Modifications made herewith. The original Contract Sum $ 1,228,000.00 Net change by previously authorized Change 0) The Contract Sum prior to this Change Order was $ 1,228,000.00 The Contract Sum will be increased by this Change Order . $ 20,879.43 The new Contract Sum including this Change Order will be $ 1,248,879.43 The Contract Time will be extended by (22) calendar days by this Change Order. Page I of2 2001-22 ---PAGE BREAK--- CONTRACTOR: Citadel Construction, Inc. 10103 N. Division, Suite 106 Spokane, W A 99218 End of Document OWNER: CityofMoscow P.O. Box 9203 Moscow, ID 83843 Page 2 of2 ARCIDTECT: Design West Architects 254 E. Main llman, W A 99163