Full Text
Application for Final Plat Review and Approval APPLICATION MUST BE COMPLETED IN FULL, PARTIAL APPLICATIONS WILL BE RETURNED Within 45 days following receipt of a completed application, the Planning and Development Department will indicate in writing all comments related to compliance with the Morgan County Development Regulations. Prior to the submission of this application, all public improvements must be properly installed and completed in accordance with all requirements and standards of the Morgan County Development Regulations. As-built surveys of the improvements must be submitted prior to or concurrent with the final plat application. All erosion, sedimentation and pollution control measures must be installed according to an approved preliminary plat and construction drawings, including any additional measures installed at the request of Morgan County after the preliminary plat was approved. Date: Jurisdiction: Morgan County City of Rutledge Town of Buckhead City of Madison City of Bostwick Person requesting review: Name: Title: Physical Address: State: Zip: Mailing Address: City: State: Zip: Daytime Phone: E-mail: Project Information: Project Name: Project Address: Nearest Address or Cross Street: Tax Map: Parcel: Total Acreage: Total Acreage Disturbed: Proposed project to be constructed: Commercial Development Recreational Development Residential Lot Industrial Development Farm Pond Agricultural Clearing Residential Development Recreational Pond Other Explain Other: MORGAN COUNTY PLANNING AND DEVELOPMENT 150 East Washington Street, Suite 200 P.O. Box 1357 Madison, Georgia 30650 (706)342-4373 Office ∙ (706)343-6455 Fax ---PAGE BREAK--- Project Information, cont. Are there any existing structures on the property? Yes No If yes, type of existing structures on property: Is the property in a ground water recharge area? Yes Does the property contain wetland areas? Yes No Is the property in a water supply water shed? Yes No Water Shed: Is there a flood plain on the property? Yes No FIRM Map Panel: Are there state waters within 200 feet of the property? Yes No Type Water Source: (Check all that apply) River Lake Pond ______Creek Stream Spring Branch Owner Information: Name: Physical Address: State: Zip: Mailing Address: City: State: Zip: Daytime Phone: Cell Phone: 24 Hour Contact and Phone Number: Fax: E-mail: Surveyor Information: Company Name: Physical Address: State: Zip: Mailing Address: City: State: Zip: Daytime Phone: 24 Hour Phone: Fax: E-mail: Contact Name: Daytime Phone: Fax: E-mail: Certification Number: ---PAGE BREAK--- Engineering Firm Information: Company Name: Physical Address: State: Zip: Mailing Address: City: State: Zip: Daytime Phone: 24 Hour Phone: Fax: E-mail: Contact Name: Daytime Phone: Fax: E-mail: Certification Number: Documents required Completed application. Application must be completed by applicant. Planning and Development staff will not be responsible for completing application. 5 copies of Final Plat, drawn in conformance with the specifications provided in Chapter 7.9 of the Morgan County Development Regulations. Payment of applicable fees. See attached sheet to determine correct amount. As-built surveys of any new streets, drainage facilities or public improvements. Surveys must be submitted prior to or concurrent with the final plat application. Omission of surveys will result in the application being returned. Draft of conservation easement. A plan for the maintenance of open space and operation of common facilities. Evidence of establishment of an escrow fund for open space maintenance. Documents required to establish a homeowner’s association. Executed deeds for the dedication of all street rights-of-way. Maintenance bond or cash providing for maintenance of all public streets and drainage improvements for a period of 3 years following the date of final plat approval. Performance bond or cash providing for the installation of any unfinished items, such as top coat paving or sidewalks. Approval to leave items unfinished must be obtained from the Director of Planning and Development. Signed Development Agreement, if applicable. A copy of recommendation or approval from Georgia Department of Transportation. If the proposed subdivision includes or abuts a US or state numbered highway, unless all of the lots in the subdivision contain 5 acres or more and no new street is involved, review by the Georgia Department of Transportation is required. A copy of the final plat in CAD and PDF format. This file may be emailed; confirm address with Planning and Development staff. Additional documents may be required by Planning and Development. Please note that approvals may be required by additional agencies, including but not limited to: City of Madison, Morgan County Health Department, Fire Marshal, NRCS, U.S. Army Corps of Engineers, Georgia Power/FERC and the Department of Natural Resources. Check with Planning and Development staff to determine applicability. Additional performance bonds or cash may be required by the Director of Planning and Development for incomplete improvements not listed above.