Full Text
Beacon Lite Road Sidewalk - Phases 1 & 2 Required CDOT Standard Specifications AECOM Project No. 60561381 June 24, 2019 DIVISION 200 – EARTHWORK 179-310 SECTION 201 – CLEARING AND GRUBBING 179 201.01 - Description 179 201.02 - Construction Requirements 179-180 201.03 - Method of Measurement 180 201.04 - Basis of Payment 180 SECTION 202 – REMOVAL OF STRUCTURES AND 181-187 202.01 - Description 181 202.02 - General 181-182 202.04 - Signs and Traffic Signals 182 202.05 - Pavement Markings 183 202.07 - Pavements, Sidewalks, Curbs 184 202.09 - Removal of Asphalt Material 184-185 202.11 - Method of Measurement 185-186 202.12 - Basis of Payment 186-187 SECTION 203 – EXCAVATION AND EMBANKMENT 188-202 203.01 - Description 188 203.02 - Excavation Definitions 188-189 203.03 - Embankment Materials 189-192 203.05 - Excavation 193-194 203.06 - General Embankment Construction Requirements 194-195 203.07 - Embankment Placement and Compaction Requirements 196-199 203.11 - Method of Measurement 199-201 203.12 - Basis of Payment 201-202 SECTION 207 – TOPSOIL 214-215 207.01 - Description 214 207.02 - Materials 214 207.03 - Construction Requirements 214-215 207.04 - Method of Measurement 215 207.05 - Basis of Payment 215 SECTION 208 – EROSION CONTROL 216-246 208.01 - Description 216 208.02 - Materials 216-222 208.04-208.10 - Construction Requirements 230-243 208.11 - Method of Measurement 243-244 208.12 – Basis of Payment 244-246 SECTION 210 – RESET STRUCTURES 249-252 210.01 - Description 249 210.02 - General 249 210.07 - Ground Sign 250 210.10 - Adjust Structure 250-251 210.11 - Flashing Beacon 251 210.12 - Method of Measurement 251-252 210.13 - Basis of Payment 252 SECTION 212 – SEEDING, FERTILIZER, SOIL CONDITIONER, AND SODDING 253-260 212.01 - Description 253 212.02 - Seed, Soil Conditioners, Fertilizers, and Sod 253-256 212.03 - Seeding Seasons 256-257 212.06 - Native Seeding 258-259 212.07 - Method of Measurement 259-260 212.08 - Basis of Payment 260 Page 1 of 3 ---PAGE BREAK--- DIVISION 300 – BASES 311-320 SECTION 304 – AGGREGATE BASE COURSE 311-312 304.01 - Description 311 304.02 - Aggregate 311 304.03 - Commercial Minerals Fillers 311 304.04 - Placing 311 304.05 - Mixing 311 304.06 - Shaping and Compaction 311-312 304.07 - Method of Measurement 312 304.08 - Basis of Payment 312 DIVISION 400 – PAVEMENTS 321-382 SECTION 403 – HOT MIX ASPHALT 337-338 403.01 - Description 337 403.02 - Materials 337 403.03 - Construction Requirements 337 403.04 - Method of Measurement 337 403.05 - Basis of Payment 337-338 SECTION 412 – PORTLAND CEMENT AND CONCRETE PAVEMENT 355-378 412.01 - Description 355 412.02 - Materials 355 412.03-412.22 - Construction Requirements 355-376 412.23 - Method of Measurement 376-377 412.24 - Basis of Payment 377-378 DIVISION 600 – MISCELLANEOUS CONSTRUCTION 487-758 SECTION 603 – CULVERTS AND SEWERS 547-552 603.01 - Description 547 603.02 - Materials 547 603.03-603.11 - Construction Requirements 547-551 603.12 - Method of Measurement 551 603.13 - Basis of Payment 551-552 SECTION 608 – SIDEWALKS AND BIKEWAYS 568-570 608.01 - Description 568 608.02 - Materials 568 608.03-608.04 - Construction Requirements 568-569 608.05 - Method of Measurement 570 608.06 - Basis of Payment 570 SECTION 609 – CURB AND 571-574 609.01 - Description 571 609.02 - Materials 571 609.03-609.05 - Construction Requirements 571-573 609.06 - Method of Measurement 573 609.07 - Basis of Payment 574 SECTION 612 – DELINEATORS AND REFLECTORS 578-581 612.01 - Description 578 612.02 - Materials 578-580 Page 2 of 3 ---PAGE BREAK--- 612.03 - Construction Requirements 581 612.04 - Method of Measurement 581 612.05 - Basis of Payment 581 SECTION 613 – LIGHTING 582-590 613.01 - Description 582 613.02 - Materials 582-584 613.03-613.10 - Construction Requirements 584-589 613.11 - Method of Measurement 589 613.12 - Basis of Payment 589-590 SECTION 614 – TRAFFIC CONTROL DEVICES 591-625 614.01 - Description 591 614.02-614.08 - Materials 591-613 614.09-614.12 - Construction Requirements 613-621 614.13 - Method of Measurement 621-623 614.14 - Basis of Payment 623-625 SECTION 626 – MOBILIZATION 711-712 626.01 - Description 711 626.02 - Basis of Payment 711-712 SECTION 627 – PAVEMENT MARKING 713-725 627.01 - Description 713 627.02 - Materials 713 627.03-627.11 - Construction Requirements 713-723 627.12 - Method of Measurement 723 627.13 - Basis of Payment 724-725 SECTION 630 – CONSTRUCTION ZONE TRAFFIC CONTROL 734-752 630.01 - Description 734 630.02-630.09 - Materials 734-739 630.10-630.16 - Construction Requirements 739-748 630.17 - Method of Measurement 748-749 630.18 - Basis of Payment 749-752 Page 3 of 3