← Back to Monument

Document Monument_doc_4c568afce9

Full Text

Town of Monument 645 Beacon Lite Road Monument, CO 80132-0325 Ph: [PHONE REDACTED] CONSTRUCTION DOCUMENTS CHECKLIST An application for Construction Documents (CDs) shall be accompanied by the following information, unless one or more items are specifically waived in writing by the Planning Director:  The Development Review Application form signed by the property owner.  The applicable Construction Documents fee.  Submit documents electronically via OneDrive, Dropbox, etc. An application for a Construction Documents shall be accompanied by the following information:  A drainage study signed by engineer-of-record and the Town (Triview metro District, if applicable).  A geotechnical report.  A traffic impact analysis or study.  Engineering plans signed off by applicable entities owner; engineer-of-record; Triview, and/or other entities providing services, if applicable; and appropriate Fire Protection District, as applicable).  Approved ROW Plat. Plans must include the following (refer to Engineering Standards & Specifications on the Town website):  A grading and erosion control plan with existing and proposed topography.  A utility plan and/or technical studies.  A storm drainage plan.  Street design including roadway profiles, mix design, and cross-sections (if applicable).  A traffic signage & striping plan and sign details.  A photometric plan and lighting details.  Landscape and irrigation plans prepared by a licensed landscape architect in accordance with the Town’s Landscape Guidelines.  Any other special reports and/or information deemed necessary by Town Staff at the pre-application meeting. For additional information on plan submittal requirements, please contact the Town of Monument Planning [EMAIL REDACTED]. The following must be obtained, or must occur, prior to issuance of a Site Development permit by the Town:  Submittal of appropriate permits and supporting documents from other agencies, as required.  Stormwater Management Permit (SWMP) from the State of Colorado (projects larger than one acre in size).  Fugitive Dust Permit from El Paso County.  Payment of bonds/letter of credit to the Town of monument, signed Public Improvements Agreement (PIA).  Submittal of a site development permit application, including certificate of insurance and proof of a valid Colorado contractor’s license and a Town of Monument Business license, by the contractor  Preconstruction meeting with the Town, which must include, at a minimum, the engineer-of-record, the property owner or authorized agent, the contractor who will perform the infrastructure installation, and any subcontractors for the various portions of the site-related work (see attached Pre-Construction Conference Agenda). Important Note: When the Town code, policies, or other regulations do not contain specific information regarding details or standards, the following regulations and/or standards shall apply: 1. City of Colorado Springs Engineering Division Standard Specifications 2. City of Colorado Springs and El Paso County Drainage Criteria Manual –Volumes I and II 3. State of Colorado Department of Public Health and Environment ---PAGE BREAK--- Town of Monument 645 Beacon Lite Road Monument, CO 80132-0325 Ph: [PHONE REDACTED] 4. National Pollutant Discharge Elimination System (NPDES) 5. Town of Monument Design and Installation Standards for Potable Water Distribution systems (Within the Triview Metropolitan District, where a conflict exists between Triview standards and Town standards, the more stringent shall apply).