← Back to Monument

Document Monument_doc_30f3e2b583

Full Text

Town of Monument 645 Beacon Lite Road Monument, CO 80132-0325 Ph: [PHONE REDACTED] An application for CONSTRUCTION DOCUMENTS shall be accompanied by the following information, unless one or more items are specifically waived in writing by the Planning Director: PROJECT NAME: APPLICATION REQUIREMENTS APPLICANT STAFF N/A Development Review Application form. Comments: ☐ ☐ ☐ Application fee. Comments: ☐ ☐ ☐ A drainage study signed by engineer-of-record and the Town (Triview, if applicable) Comments: ☐ ☐ ☐ A geotechnical report. Comments: ☐ ☐ ☐ A traffic impact analysis or study. Comments: ☐ ☐ ☐ Engineering plans signed off by applicable entities owner; engineer-of- record; Triview, and/or other entities providing services, if applicable; and appropriate Fire Protection District, as applicable) Comments: ☐ ☐ ☐ Plans must include the following (refer to Engineering Standards and Specifications on the Town Website): Comments: ☐ ☐ ☐ A grading and erosion control plan with existing and proposed topography. Comments: ☐ ☐ ☐ A utility plan and/or technical studies. Comments: ☐ ☐ ☐ A storm drainage plan. Comments: ☐ ☐ ☐ Street design including roadway profiles, mix design, and cross-sections (if applicable). Comments: ☐ ☐ ☐ A traffic signage and striping plan and sign details. Comments: ☐ ☐ ☐ A photometric plan and lighting details. Comments: ☐ ☐ ☐ Landscape and irrigation plans prepared by a license landscape architect in accordance with the Town’s Landscape Guidelines. Comments: ☐ ☐ ☐ Any other special reports and/or information deemed necessary by Town Staff at the pre-application meeting. Comments: ☐ ☐ ☐ CONSTRUCTION DOCUMENTS CHECKLIST ---PAGE BREAK--- Town of Monument 645 Beacon Lite Road Monument, CO 80132-0325 Ph: [PHONE REDACTED] The following must be obtained, or must occur, prior to issuance of a Site Development permit by the Town. Submittal of appropriate permits and supporting documents from other agencies, as required. Comments: ☐ ☐ ☐ Stormwater Management Permit (SWMP) from the State of Colorado (projects larger than one acre in size). Comments: ☐ ☐ ☐ Fugitive Dust Permit from El Paso County Comments: ☐ ☐ ☐ Public Improvements Agreement (PIA) and payment of bonds/letter of credit to the Town of Monument. Comments: ☐ ☐ ☐ Submittal of a site development permit application, including a certificate of insurance and proof of a valid Colorado contractor’s license and a Town of Monument business license by the contractor. Comments: ☐ ☐ ☐ Preconstruction meeting with the Town, which must include, at a minimum, the engineer-of-record, the property owner or authorized agent, the contractor who will perform the infrastructure installation, and any subcontractors for the various portions of the site-related work. Comments: ☐ ☐ ☐ APPLICANT INFORMATION Date: Completed by: Phone Number Email Address: Notes: TO BE COMPLETED BY STAFF Date: Reviewed by: Completeness Review: Complete: ☐ Incomplete: ☐ Conditional Complete: ☐ Notes: Important Note: When the Town code, policies, or other regulations do not contain specific information regarding details or standards, the following regulations and/or standards shall apply: 1. City of Colorado Springs Engineering Division Standard Specifications 2. City of Colorado Springs and El Paso County Drainage Criteria Manual –Volumes I and II 3. State of Colorado Department of Public Health and Environment 4. National Pollutant Discharge Elimination System (NPDES) 5. Town of Monument Design and Installation Standards for Potable Water Distribution systems (Within the Triview Metropolitan District, where a conflict exists between Triview standards and Town standards, the more stringent shall apply)