Pool Demolition Permit Handout Pool Demolition Permit Requirements: 1. A completed permit application form 2. Provide a scaled plot plan indicating the location of the abated area with existing set backs to property lines and to other adjacent remaining structures (e.g. pools, detached garages, septic tanks, etc) clearly specified. 3. One of the two following options shall be employed and specified on the plans: a. Delineate the extent of the site area that will be designated as a “non-build” area in the future. This information will be attached to the parcel to avoid construction activity in this area. or b. Provide a demolition, drainage and compaction plan prepared and wet stamped by a State licensed engineer, and a completed special inspection form designating the supervising engineer or Special Inspection agency that will conduct the backfill compaction observation and provide a compaction report to the Building Division declaring the abated area as a “buildable” area. Notes: The natural gas line and electrical wiring serving the pool and pool equipment shall be capped off and will be verified at time of inspection. Building Inspection, 1010 Tenth Street, Suite 3100, P.O. Box 642, Modesto, CA 95353 (209) 577-5232 (The owner of record will be required to provide a notarized letter indicating no structure is to be built in the area where the pool existed.)