Full Text
GENERAL REQUIREMENTS: 1. SITE Project Submittal Application - must be typed or printed and filled in completely. a. If the applicant is not the property owner, the property owner shall designate the applicant as the authorized agent to act on his or her behalf and both shall sign the application. 2. Proposed Grant Deeds to be recorded concurrently with lot line adjustment approval. 3. Four copies of the legal descriptions of the existing parcels and the proposed parcels, as they will exist after the Adjustment is recorded. Legal descriptions must be prepared by a Professional Land Surveyor or a Registered Civil Engineer with a Registration Number of RCE 33965 or lower, and be accompanied by plot maps prepared by same. Plot maps shall show the following: a. Sheet size: 8 ½” X 11”. b. Label all boundary and lot lines, including distances, within proposed lot line adjustment. c. Current property owner(s). d. Name and location of existing public rights of way adjacent to and within the project boundary. e. All structures, including those that are existing, proposed, or to be removed; existing and proposed parking spaces and driveways; all existing easements, including utility easements; existing utility lines, access ways and parking agreements. Dimensions of the above to property lines before and after the Lot-Line Adjustment shall be delineated on the plot map. f. Legend for all symbols not otherwise labeled on the map. g. All maps are to be drawn to scale, including a north arrow and scale on each map sheet. The maps shall identify the subject properties, and include a vicinity map. 4. Title report or deed with legal description for subject property, dated within 3 months of application submittal. 5. All record information used in preparation of the legal descriptions, including documents, maps and drawings as identified in the plat or legal description. 6. Traverse calculations, showing the mathematical closure of the boundary and revised lots/parcels of the lot line adjustment, to two decimal places. 7. If origin of existing lots is unknown the lots were not created by a recorded map), a Certificate of Compliance will be required. 8. Applicable filing fee(s) (see adopted fee schedule) and Recording Fee. Community & Economic Development Department Land Development Engineering Lot Line Adjustment Submittal Requirements FOR YOUR INFORMATION: Staff may deem additional submittal information necessary to adequately analyze the project. Completion of the application does not presume approval of the application. All entitlement decisions are final unless appealed within fifteen (15) days of the date on which the decision is made. Appeals to staff decisions shall be in writing and filed with the Community and Economic Development Department. The appeal must set forth the specific reasons for the appeal. All applicable fees must accompany appeals. Building permits, Certificates of Occupancy, or licenses will not be issued until the appeal period has elapsed. If the entitlement decision is appealed, building permits, certificates of occupancy, or licenses will not be issued until the final decision has been made on the appeal or the appeal is withdrawn. ---PAGE BREAK--- PLOT MAP ---PAGE BREAK--- EXHIBIT Legal Description of Properties Prior to Lot Line Adjustment ---PAGE BREAK--- EXHIBIT Legal Description of Properties After Approval of Lot Line Adjustment ---PAGE BREAK--- EXHIBIT