BID ADDENDUM NO.1 SIDEWALK RAMPS-MISSOULA CITY PROJECT 09-029 FEDERAL AID PROJECT #ARRA 8199(88) UPN 7003 March 25, 2010 In accordance with the Instructions to Bidders of the Contract Documents, the following revisions, additions, deletions and clarifications shall become part of the Contract Documents, and bidders shall acknowledge receipt of this addendum. Bid will be considered non-responsive and rejected if receipt ofeach addendum is not acknowledged. ADDENDUM ACKNOWLEDGEMENT Bidders shall acknowledge receipt ofthis addendunl by entering the addendum number on Page P-3 ofthe Amended Bid Proposal (attached) as follows: March 25,2010 1 Addenda: No. Item No.1 (information): The following additional infonnation is not contained within the bid documents and is being provided to assist Contractors in preparation ofbid submittals. Note that the following information are estimates only, and the contractor should complete their own field investigation and review of plans and other infonnation contained in the contract.documents for basis ofbidding: Number of Ramps Base bid 73 Bid Alt 1 24 Bid Alt 2 13 Bid Alt 3 19 Bid Alt 4 14 Bid Alt 5 20 Total 163 IN TYPE REM REM REM REM IN 4" IN IN IN OF RAMP CURB 4"SW ASPH CURB SW ASPH DOMES RAMP DESCRIPTION LF SF SF SF LF SF SF SF EA 1 20 RAD 5-10' 40 200 80 40 200 80 2 2 20 RAD 5-10' 250 100 250 100 2 3 MID BLK CURBSIDE 20 100 40 20 100 40 1 4 CS ENDING AT COR 20 150 40 20 150 40 1 5 PERPENDICULAR 10 50 20 10 50 20 2 ALLEYCS 200 200 ALLEY BOUL 400 400 ---PAGE BREAK--- Item No.2 (addendum): The following language shall replace in its entirety Project Special Condition #7 contained in the Contract Document. 7. BID ITEM TRAFFIC CONTROL AND SIGNING" The lump sum bid item for traffic control and signing shall include the labor, equipment and materials to provide construction traffic control and signingfor this project. The traffic control shall meet all requirements setforth by the Manual ofUniform Traffic Control Devices and the City ofMissoula Standardized Construction Traffic Control Plans. Work on this project may require lane closures. The contractor shall submit a traffic control plan to the Engineer before construction. Two-way traffic must be maintained on major streets at all times. Side streets may be closed ifneeded. Item No.3 (addendum): Attached is an AMENDED BID PROPOSAL to be used by all bidders, which shall be stapled to the front ofthe Bid Proposal contained within the Contract Documents. This amended bid proposal revises Item 11 - Traffic Control and Signing Estimated Units for the base bid and for each ofthe five alternates to 1 LS. In addition, the amended bid proposal was revised to correctly reference total bid for each alternate. Monte Sipe, Construction Projects Coordinator ---PAGE BREAK--- BID PROPOSAL FOR CONSTRUCTION (Amended per Addendum No.1) FOR AMERICAN REINVESTMENT/ RECOVERY ACT PROJECT NO. ARRA 8199 (88) UPN 7003 CITY PROJECT 09-029 SIDEWALK RAMPS - Missoula BASE BID Arthur Avenue, South Avenue East, South Higgins Plan Sheets 1-12 (Required) Item Description Estimated Units Unit Price BID Total 1 Remove Curb 270 LF /LF 2 Remove 4" Sidewalk 1,350 SF /SF 3 Remove type Curb/Sidewalk 11,500 SF /SF 4 Remove Asphalt 8,740 SF /SF 5 Install Curb 270 LF /LF 6 Install 4" Sidewalk 1,350 SF /SF 7 Install Type Curb/Sidewalk 11,500 SF /SF 8 Install 3" Hot-Mix Asphalt 8,740 SF /SF 9 Install Truncated Domes 107 EA /EA 10 Place Top Soil 55 CY ICY 11 Traffic Control and Signing 1 LS /LS 12 Miscellaneous Work 5,000 EA $1.00 /EA $5,000 SUB-TOTAL 12 R/WPermits 19% of Sub-Total TOTAL BASE BID $ CONTRACT TIME = 60 CALENDAR DAYS ---PAGE BREAK--- BID ALTERNATE 1 South Avenue West Plan Sheets 13-16 (Required) Item Description Estimated Units Unit Price BID Total 1 Remove Curb 0 LF /LF 2 Remove 4" Sidewalk 0 SF /SF 3 Remove type Curb/Sidewalk 6,000 SF /SF 4 Remove Asphalt 2,400 SF /SF 5 Install Curb 0 LF /LF 6 Install 4" Sidewalk 0 SF /SF 7 Install Type Curb/Sidewalk 6,000 SF /SF 8 Install 3" Hot-Mix Asphalt 2,400 SF /SF 9 Install Truncated Domes 48 EA /EA 10 Place Top Soil 24 CY ICY 11 Traffic Control and Signing 1 LS /LS 12 Miscellaneous Work 1,000 EA $1.00 /EA $1,000 SUB-TOTAL 12 R/W Permits 19% of Sub-Total TOTALBIDALTI $ ADDITIONAL CONTRA CT TIME = 21 CALENDAR DAYS ---PAGE BREAK--- BID ALTERNATE 2 Bancroft Street from South Avenue to Kent Avenue Plan Sheets 17-18 (Required) Item Description Estimated Units Unit Price BID Total 1 Remove Curb 0 LF /LF 2 Remove 4" Sidewalk 0 SF /SF 3 Remove type Curb/Sidewalk 2,250 SF /SF 4 Remove Asphalt 1,500 SF /SF 5 Install Curb 0 LF /LF 6 Install 4" Sidewalk 0 SF /SF 7 Install Type Curb/Sidewalk 2,250 SF /SF 8 Install 3" Hot-Mix Asphalt 1,500 SF /SF 9 Install Truncated Domes 18 EA /EA 10 Place Top Soil 9 CY ICY 11 Traffic Control and Signing 1 LS /LS 12 Miscellaneous Work 1,000 EA $1.00 /EA $1,000 SUB-TOTAL 12 RlW Permits 19% of Sub-Total TOTAL BID ALT 2 ADDITIONAL CONTRACT TIME = 14 CALENDAR DAYS ---PAGE BREAK--- BID ALTERNATE 3 Bancroft from North Avenue to Burlington Avenue Plan Sheets 19-20 (Required) Item Description Estimated Units Unit Price BID Total 1 Remove Curb 60 LF /LF 2 Remove 4" Sidewalk 300 SF /SF 3 Remove type Curb/Sidewalk 2,750 SF /SF 4 Remove Asphalt 2,220 SF /SF 5 Install Curb 60 LF /LF 6 Install 4" Sidewalk 300 SF /SF 7 Install Type Curb/Sidewalk 2,750 SF /SF 8 Install 3" Hot-Mix Asphalt 2,220 SF /SF 9 Install Truncated Domes 25 EA /EA 10 Place Top Soil 19 CY ICY 11 Traffic Control and Signing 1 LS /LS 12 Miscellaneous Work 1,000 EA $1.00 /EA $1,000 SUB-TOTAL 12 R/W Permits 19% of Sub-Total TOTAL BID ALT 3 $ ADDITIONAL CONTRACT TIME = 14 CALENDAR DAYS ---PAGE BREAK--- BID ALTERNATE 4 Bancroft from South Avenue to Salish Court Plan Sheets 21-23 (Required) Item Description Estimated Units Unit Price BID Total 1 Remove Curb 40 LF /LF 2 Remove 4" Sidewalk 200 SF /SF 3 Remove type Curb/Sidewalk 2,250 SF /SF 4 Remove Asphalt 1,780 SF /SF 5 Install Curb 40 LF /LF 6 Install 4" Sidewalk 200 SF /SF 7 Install Type Curb/Sidewalk 2,250 SF /SF 8 Install 3" Hot-Mix Asphalt 1,780 SF /SF 9 Install Truncated Domes 20 EA /EA 10 Place Top Soil 10 CY ICY 11 Traffic Control and Signing 1 LS /LS 12 Miscellaneous Work 1,000 EA $1.00 /EA $1,000 SUB-TOTAL 12 RlWPermits 19% of Sub-Total TOTALBIDALT4 ADDITIONAL CONTRACT TIME 14 CALENDAR DAYS ---PAGE BREAK--- BID ALTERNATE 5 Bancroft from South Avenue to Salish Court Plan Sheets 24-25 (Required) Item Description Estimated Units Unit Price BID Total 1 Remove Curb 220 LF /LF 2 Remove 4" Sidewalk 1,250 SF /SF 3 Remove type Curb/Sidewalk 1,250 SF /SF 4 Remove Asphalt 940 SF /SF 5 Install Curb 220 LF /LF 6 Install 4" Sidewalk 1,250 SF /SF 7 Install Type Curb/Sidewalk 1,250 SF /SF 8 Install 3" Hot-Mix Asphalt 940 SF /SF 9 Install Truncated Domes 33 EA /EA 10 Place Top Soil 19 CY ICY 11 Traffic Control and Signing 1 LS /LS 12 Miscellaneous Work 1,000 EA $1.00 /EA $1,000 SUB-TOTAL 12 R/W Permits 19% of Sub-Total ADDITIONAL CONTRACT TIME = 14 CALENDAR DAYS TOTAL BID ALT 5 Bid Alternatives are included in the Bid Proposal. The Owner may reject all or may select anyone or more of the bid alternatives. Determination of the lowest responsive bidder will be based on the total of the lowest bas bid submitted plus none, all or any combination of bid alternatives selected by the Owner. Bid Addendum Acknowledged: The contract will be awarded within 45 calendar days after the bid opening to the lowest responsive, responsible, and qualified bidder whose bid proposal complies with all the requirements.