CHANGE ORDER NO.1 OWNER: City ofMissoula (project No. 09-048) DATE: April19~ 2010 CONTRACTOR: Decca General Construction Services) LLC HDR PROJECT NO.: 00... 119335 CONTRACT PERIOD: February 16,2010 PROJECT: Reserve Street Sewer Main Replacement Project (Site ill:184) CONTRACT DATE: February] 6, 2010 It is agreed to modify the Contract referred to above as follows: Provide all labor and materials necessmy for installation ofthe work outlined in CPR Nos.: la, 2, 4a, 5, 6, 7,8 and 9. The cost ofthis Contract modification is as follows: CPR 1a. 2. 4a. 5. 6. 7. 8. 9. Description Gravel Access Repair Davis St. manhole Replace FM manhole per City ofMissoula Deduct for inspection services Delay time: due to existing pipe materials Repair existing manhole (C61-3) Bypass Pumping Standby Force Main Boot per City ofMissoula Cost $6,744.76 $1,412.94 $54,133.15 -$2,655.75 $6,052.12 $1,244.94 $13,246.80 $604.45 Change Order No. la, 2, 4a, 5, 6, 7, 8 and 9. Total Cost: $80)783.41 CHANGE ORDER SUMMARY Contract Time Extension Calendar Days C.O. No(s).: la, 2, 4a, 5, 6, 7, 8 and 9 $80,783.41 7 calendar days; Total Date: ECE Distribution: O"vner, Contractor, Office, Field, Other Attest: Approved for HDR Engineering, Inc. By: Approved for O"vner By: This Change Order, when executed by the parties to the Contract, amends the Contract and, as so amended, all terms and conditions of the Contract remain unchanged and in full force and effect. Payment and any time extension provided in this Change Order are full and complete compensation to the Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractoes schedule, and for any equitable adjustment or time extension existing at the time ofthe execution of this Change Order to which the Contractor may be entitled, pursuant to the Contract between the Owner and Contractor or any other basis whatsoever. The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions ofthe original co t c thou . c thereiU:._____', Accepted fur Contractor By: Date:7'~~ Date:OY(iJ/!O Date: 1/Z5~o