← Back to Missou, LA

Document Missoula_doc_5467c6cded

Full Text

PROJECT: OWNER: CONSULTANT: Item Number Description Est Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price A-1 SITE GRADING 1 LS 80,000.00 $ 80,000.00 $ 61,600.00 61,600.00 $ 78,000.00 $ 78,000.00 $ A-2 TOPSOIL STIPPING AND STOCKPILING 4,090 CY 3.70 $ 15,133.00 $ 2.15 8,793.50 $ 2.45 $ 10,020.50 $ A-3 GAS LINE RELOCATION 1 LS 23,302.00 $ 23,302.00 $ 23,302.00 $ 23,302.00 $ 23,302.00 $ 23,302.00 $ SUBTOTAL 118,435.00 $ 93,695.50 $ 111,322.50 $ A-4 EXCESS MATERIAL FROM EXCAVATION 123,979 CY (1.00) $ (123,979.00) $ (0.35) $ (43,392.65) $ - $ - $ TOTAL SCHEDULE A (5,544.00) $ 50,302.85 $ 111,322.50 $ A1-1 3/4" MINUS CRUSHED BASE COURSE 2,750.0 CY 15.00 $ 41,250.00 $ 13.00 $ 35,750.00 $ 6.22 $ 17,105.00 $ A1-2 3" MINUS CRUSHED BASE COURSE 5,500 CY 15.00 $ 82,500.00 $ 11.00 $ 60,500.00 $ 6.10 $ 33,550.00 $ TOTAL BID ALTERNATE 1 123,750.00 $ 96,250.00 $ 50,655.00 $ x x x x CITY OF MISSOULA - PARKS AND RECREATION DHM DESIGN; WGM GROUP, INC. KNIFE RIVER L.S. JENSEN Bid Signed Bid Bond Included BID SCHEDULE A: EXCAVATION AND GRADING - ROYALTIES CERTIFIED BID TABS BID ALTERNATE 1 Fort Missoula Regional Park - Rough Grading and Overburden Removal BID SCHEDULE A: EXCAVATION AND GRADING - COSTS ENGINEER'S ESTIMATE Certified Bid Tab Fort Missoula Regional Park Phase 1.xls Page 1 of 1