Full Text
BID TABULATION REPORT WHITE PINE PARK ‐ LANDSCAPE & IRRIGATION PROJECT # PR 09‐06 WP BIDDER No 1 BIDDER No 2 BIDDER No 3 BIDDER No 4 * Bids were publicly opened and read on July 14, 2009 at 3 pm in the Mayor's Conference Room Bidder's Name Brugh Landscaping, LLC Valley Landscape, Inc. Kerb Design Landscape Ibey Sprinkler & Landscape, Inc. * Bids are listed from lowest qualifying bidder to highest qualifying bidder Address PO Box 1120, Florence MT 59833 PO Box 3656, Missoula MT 59806 5711 Old Hwy 93, Florence MT 59833 6170 Butler Creek Rd., Missoula MT 59808 BID TABULATION BRUGH VALLEY KERB DES. IBEY Item Description Estimated Units Bid Bid Bid Bid 1 Install 8' sump ‐ sump rock, fabric, w/ 4' concrete cone & frame grate 1 Cone, 1 Frame & Grade, Sump Rock, Fabric $2,298.75 $1,970.00 $2,923.00 $1,968.00 2 Install commercial grade irrigation system ‐ In‐field design 3 Acres $30,668.75 $31,600.00 $35,899.00 $32,945.00 3 Spread topsoil 4000 CY $16,773.75 $10,655.00 $3,373.00 $11,034.00 4 Spread and incorporate soil amendments to a depth of 4" 400 CY $1,568.75 $3,270.00 $2,433.00 $2,423.00 5 Establish final grade 3 Acres $2,118.75 $9,000.00 $8,885.00 $13,742.00 6 Place topical fertilizer per technical specifications Lump Sum $1,068.75 $515.00 $2,533.00 $1,388.00 7 Install grass seed per technical specifications 3 Acres $5,496.75 $4,040.00 $7,255.00 $8,589.00 8 establish turf per technical specifications 3 Acres $1,718.75 $3,610.00 $4,253.00 $2,754.00 9 5% Extra Work Contingency To be used only as authorized by Owner $3,085.65 $3,233.00 $3,377.00 $3,743.00 Total Base Bid $64,798.65 $67,893.00 $70,931.00 $78,586.00