← Back to Minden

Document Minden_doc_3426203b72

Full Text

1 Residential connections larger than one inch will be charged at non-residential rates. Residential connection fees are for each residential unit. 2 See fee schedule for Meter, Installation and Administrative Fees (TABLE 4- 3 No Cost if the Customer provides the water right. Water right based on 1000 gallons per day (1.12 acre feet per year) for SF and 70 gallons per day (.84 acre feet per year) for MF. Cost of Town of Minden water right for use in the Town of Minden system is $6,450 per acre foot. 4 Capacity charges updated annually based on fee scheduled identified in rate study (TABLE TOWN OF MINDEN WATER CONNECTION FEES Effective January 2018 TABLE 1 – RESIDENTIAL WATER CONNECTION FEES Connection Size (Diameter at the Water Main) Inspection Fee Meter, Installation and Administrative Fees Water Right Cost Residential Capacity charge Total ¾” $225 $550 $7,225 $4,480 $12,480 1” $225 $550 $7,225 $7,470 $15,470 ¾” $225 $550 $5,420 $4,480 $10,675 1” $225 $550 $5,420 $7,470 $13,665 TABLE 1‐ RESIDENTIAL WATER CONNECTION B. Multi-Family (MF) Apartment, Townhouse, Condominium, or Residence with no outside water use through the connection. A. Single Family (SF) Residence or Duplex Per Unit with outside use through the connection. ---PAGE BREAK--- Page 2 of 5 TOWN OF MINDEN WATER CONNECTION FEES Effective January 2018 TABLE 2 – NON-RESIDENTIAL WATER CONNECTION FEES BY COMPONENT Connection Size (Diameter at the Water Main) Inspection Fee Meter, Installation and Administrative Fees Water Right Non- Residential Capacity charge Total ¾” $225 $550 Quote Required $4,480 $5,255 1” $225 $550 Quote Required $7,470 $8,245 1.5" $225 $855 Quote Required $14,930 $16,010 2" $225 $2,105 Quote Required $23,890 $26,220 3" $225 $2,555 Quote Required $52,270 $55,050 4" $225 $3,905 Quote Required $74,260 $78,390 TABLE 2‐ NON‐RESIDENTIAL WATER CONNECTION ---PAGE BREAK--- Page 3 of 5 TOWN OF MINDEN WATER CONNECTION FEES Effective January 2018 TABLE 3 - FIRE SPRINKLER CAPACITY AND INSPECTION FEES Meter Size Inspection Fee 2016 2017 2018 2019 2020 2021 ¾” $550.00 $23 $23 $24 $25 $26 $26 1” $550.00 $38 $39 $40 $41 $43 $44 1.5" $550.00 $75 $78 $80 $83 $85 $88 2" $550.00 $120 $124 $128 $132 $136 $141 3" $550.00 $260 $270 $280 $290 $300 $310 4" $550.00 $470 $490 $510 $520 $540 $550 6" $550.00 $1,050 $1,090 $1,120 $1,160 $1,190 $1,230 8" $550.00 Quote Required Quote Required $1,930 Quote Required Quote Required Quote Required TABLE 3‐ FIRE SPRINKLER CAPACITY CHARGES ---PAGE BREAK--- Page 4 of 5 TOWN OF MINDEN WATER CONNECTION FEES Effective January 2018 TABLE 4[2] – METER, INSTALLATION AND ADMINISTRATIVE FEES Meter Size Meter Cost MXU Installation Admin Fee Total ¾” $200 $200 $125 $25 $550 1” $200 $200 $125 $25 $550 1.5" $450 $180 $200 $25 $855 2" $1,700 $180 $200 $25 $2,105 3" $2,150 $180 $200 $25 $2,555 4" $3,500 $180 $200 $25 $3,905 Over 4" Quote Required $177 $300 $25 Quote Required TABLE‐4 Meter, Installation and Administrative Fees ---PAGE BREAK--- Page 5 of 5 TOWN OF MINDEN WATER CONNECTION FEES Effective January 2018 TABLE 5[4] – CAPACITY CHARGES FROM 2016 RATE STUDY Meter Size 2016 2017 2018 2019 2020 2021 ¾” $4,200 $4,330 $4,480 $4,610 $4,760 $4,910 1” $7,000 $7,220 $7,470 $7,680 $7,930 $8,180 1.5" $14,000 $14,430 $14,930 $15,370 $15,870 $16,370 2" $22,400 $23,090 $23,890 $24,590 $25,390 $26,190 3" $49,000 $50,520 $52,270 $53,780 $55,530 $57,280 4" 70,000 $72,100 $74,260 Quote Required Quote Required Quote Required 6" 140000 $144,200 $148,530 TABLE 5‐ Capacity Charge from 2016 Rate Study: