Full Text
3330 South 1300 East Millcreek, Utah 84106 [PHONE REDACTED] millcreek.utah.gov Demolition Permit Application Checklist Provide all the following: Site Plan o Note on plan if demolition includes the foundation or basement o If foundation or basement is removed, backfill will be required o If foundation or basement is not removed, the property owner will be responsible for ensuring the safety of the property by way of a fence or some other approved method – approval shall be in writing from Millcreek Building Official Asbestos clearance from Utah Division of Air Quality – [PHONE REDACTED] Salt Lake County Heath Dept Pre-demolition Building Inspection Form – [PHONE REDACTED] Clearance of all utilities o Electricity - Rocky Mountain Power – [PHONE REDACTED] o Natural Gas - Dominion Energy – [PHONE REDACTED] o Water - Salt Lake City Public Utilities – [PHONE REDACTED] o Water - Jordan Valley Water Conservancy District – [PHONE REDACTED] o Sanitary Sewer - Mt Olympus Improvement District – [PHONE REDACTED] Storm Water Pollution Prevention Permit or Plan: o If the property area is 1 acre or larger: ▪ Notice of intent (NOI) must be filed with the State (801) 536-4300 and a permit number (from the State) must be submitted to Millcreek ▪ Full is required. Must follow the State of Utah guidelines, which can be found at this internet link: ▪ Millcreek is also required. Contact Engineering department at 801-214- 2714 o If the property area is less than 1 acre: ▪ Present a plan to the Building Official for the prevention of erosion of silt from this parcel, this may include an erosion prevention fence, the installation of sod, or some other approved method for preventing runoff from entering the city storm drain system Demolition permit are only issued to the following: o State licensed Demolition and Wrecking Contractors o State licensed General Contractors o State licensed Engineering Contractors o Property Owners acting as their own general contractor (Owner/Builder Certification) ▪ Link: Demolition permit fees are based on cost (valuation) of demolition