← Back to Millcreek

Document Millcreek_doc_e05ab57f3a

Full Text

Applicant Yes R C Water bodies, ditches and canals Civil Plans including demo, grading, drainage at a minimum Other Documents: Provide copies of any special agreements, easements, conveyances, restrictions or covenants governing the property ALTA Survey of property Additional material / information as requested by staff Department of Planning & Zoning 3330 South 1300 East Millcreek, UT 84106 Phone: (801) 214-2700 millcreek.us Label proposed and existing structures and total square footage Landscaping; including any ditches or canals The following information is not required, but may be helpful for a more through review, and may help you to get more out of the DRC: Utility locations and service connections from the street/alley to the house Property address and legal description (Include subdivision lot information) DEVELOPMENT REVIEW CONSULTATION (DRC) CHECKLIST ITEMS REQUIRED FOR DRC Required and proposed building setbacks from property lines Utility poles and fire hydrants North arrow and scaled to accurate dimensions Zoning Site Plan (north arrow and scale, address of property, general layout and scaled configuration of a site, including building footprints, parking and street layout, conceptual landscaping and lighting) Elevations of the proposed and existing structures Location of all fences, existing and proposed Parking layout Existing and proposed drainage patterns, retention, detention and permanent water quality facilities Vicinity map Lot dimensions and lot area Right of Way and ALL easements on the property with dimensions Location of driveway cuts and driveways Label proposed and existing structures and total square footage Staff Complete application submitted to staff and meeting scheduled Completed Checklist with electronic PDF copies of site plan and other applicable documents (this form ) A description of the business or land uses in sufficient detail to explain the potential impacts of the proposed development 1 ---PAGE BREAK--- Fee: NO 1st 2nd 3rd date date date APPLICANT EMAIL: ADDRESS OF PROPERTY BEING DEVELOPED: DRC File Review Number date: EXPLAIN AND DESCRIBE YOUR PROPOSED PLANS: (Attach Checklist and all required documents - incomplete applications will not accepted) Staff Use Only Received YES PROPERTY OWNER NAME: 4th Initial date date Department of Planning & Zoning 3330 South 1300 East Millcreek, UT 84106 Phone: (801) 214-2700 APPLICANT NAME: DATE: millcreek.us APPLICANT PHONE: PRINT NAME: ADDRESS: EMAIL AND PHONE: If the applicant is not the property owner, please complete below: COMPANY: DRC APPLICATION FORM 2 ---PAGE BREAK--- Jim Hardy - [EMAIL REDACTED] 2. Applicants may resubmit for additional DRCs if more feedback is required. 3. Some projects may require additional steps such as a rezoning, subdivision, variance, public hearing, site improvement plan or other approvals or exceptions before a permit or final approval can be issued; this may include approval, permits or licenses from agencies outside of Millcreek. Staff comments and agency reviewer contact information. See attached checklists Development projects that require more than two DRCs before an application will be charged a fee of $100 2. Staff reviews the application and schedules the meeting with the Applicant. This may be a virtual meeting. 3. Day of the DRC: Staff will briefly meet internally (without the Applicant) to discuss the project. Staff will then invite the Applicant and consultants into the meeting. * If applicant fails to attend a scheduled DRC, all following DRCs will require a fee of $100 4. Applicant introduces their team, and staff introduces themselves to the Applicant. Applicant then presents their project and asks questions to the City Staff. 5. City Staff will provide direction and feedback to the Applicant. Staff comments are preliminary and are considered advisory. Feedback and comments made are based on the plans submitted After the DRC 1. Comments will be provided to the DRC applicant within a week of the DRC, provided that information needed is available. Staff contact information will be included with written comments. Applicants with specific, technical questions for a particular staff member are encouraged to contact that Staff member directly. Comments: Contact Email Robert May - [EMAIL REDACTED] Carlos Estudillo - [EMAIL REDACTED] Sean Murray - [EMAIL REDACTED] Shirl White - [EMAIL REDACTED] Department/Office Millcreek Planning & Zoning Department Unified Fire Authority Millcreek Public Works/Engineering Department Millcreek Building Department Francis Lilly - [EMAIL REDACTED] Brad Sanderson - [EMAIL REDACTED] Jake Green - [EMAIL REDACTED] 1. Applicant submits DRC Application to Planning and Zoning along with relevant plans, project description and other information that may be helpful in the preliminary review. Submittals are due at minimum 9 days prior to DRC scheduled meeting. DRC meetings are held every 2nd and 4th Wednesday of the month beginning at 9am and ending at approximately 12pm. Staff typically schedules no more than three meetings each DRC day. In the event the DRC day is already full, the next available meeting is chosen. Once an Applicant submits a complete application for review for the Development Review Consultation (DRC), staff and agency reviewers will review the application and provide comments in an effort to make the process more seamless. Following are some of the important steps in the DRC process: DEVELOPMENT REVIEW "STEPS AND PROCESS" Ryan Bagshaw - [EMAIL REDACTED] Fred Lutze - [EMAIL REDACTED] Katie Larsen - [EMAIL REDACTED] 3 ---PAGE BREAK--- DEVELOPMENT REVIEW CONSULTAION (DRC) COMMENTS Millcreek PLANNING & ZONING COMMENTS 3330 South 1300 East Millcreek, UT 84106 (801) 214-2700 millcreek.us DRC FILE ---PAGE BREAK--- ENGINEERING COMMENTS ---PAGE BREAK--- UNIFIED FIRE COMMENTS ---PAGE BREAK--- BUILDING DEPARTMENT COMMENTS