Full Text
DEMOLITION PERMIT REQUIREMENTS Millcreek 1330 East Chambers Ave. Millcreek, Utah 84106 Phone: (801) 214-2700 millcreekUT.gov APPLICANT NAME: DATE: PROPERTY ADDRESS: GENERAL Remember, this is meant to be a helpful guide, not a comprehensive list. Permit applications and inspection requests can be made online by visiting Please visit the Utah Department of Air Quality for more information about demolition requirements. demolition.utah.gov Note the total project cost on the application. This must include labor and materials. Dumpsters, restrooms, and material storage shall be kept on the property and off city streets, sidewalks and adjacent properties. Dumpsters can be stored on the street for a maximum of one week by obtaining a dumpster encroachment permit from the Public Works Department. Please visit Refer to for more information and documents. (i.e. Apply for a permit, request an inspection, adopted construction codes, forms and links, climate and geographic design, and FAQ's) Is the property within FEMA Floodplain Zones A, AE, AO, or an Alluvial Fan? (click on Flood Plain layer within the Geological Features Map) Always identify floodplain on cover sheet of plans and reference source, elevations, and obtain any floodplain permits required. Is the property identified as a historic structure or located in a historic district? (click on the Historic Parcels Dec 2022 layer in the Planning and Zoning Public Map) Always identify historic parcels on cover sheet of plans and reference source, elevations, and obtain required planning and zoning approval. Note sheet/page number in plans SUBMITTAL BUILDING DEPARTMENT MILLCREEK Yes Site Plan Revise Accept Note on plan if demolition includes the foundation or basement If foundation or basement is removed, backfill will be required If foundation or basement is not removed, the property owner will be responsible for ensuring the safety of the property by way of a fence or some other approved method – approval shall be in writing from Millcreek Building Services Director Note sheet/page number in plans SUBMITTAL Utah Division of Air Quality and Salt Lake County Health Department MILLCREEK Yes Revise Accept A demolition notification permit (10 day demo permit) shall be submitted with your Millcreek permit application. They can be reached at [PHONE REDACTED] or you can visit their website at demolition.utah.gov A approved Salt Lake County Health Department Pre-Demolition Form shall be submitted with your Millcreek permit application. They can be reached at [PHONE REDACTED] or at [PHONE REDACTED] or by visiting their website at Note sheet/page number in plans SUBMITTAL Hazardous Inspection Report MILLCREEK Yes Revise Accept ---PAGE BREAK--- Yes Revise Accept A report for the inspection of hazardous wates, including but not limited to, asbestos, lead paint, fluorescent lights, shall be submitted with your Millcreek permit application. Approved inspection agency's can be found at demolition.utah.gov Note sheet/page number in plans SUBMITTAL Clearance Of All Utilities MILLCREEK Yes Revise Accept Electricity - Rocky Mountain Power – [PHONE REDACTED] Natural Gas - Dominion Energy – [PHONE REDACTED] Water - Salt Lake City Public Utilities – [PHONE REDACTED] Water - Jordan Valley Water Conservancy District – [PHONE REDACTED] Sanitary Sewer - Mt Olympus Improvement District – [PHONE REDACTED] Note sheet/page number in plans SUBMITTAL Storm Water Pollution Prevention MILLCREEK Yes Revise Accept If the property is 1 acre or larger: Notice of intent (NOI) must be filed with the State (801) 536-4300 and a permit number (from the State) must be submitted to Millcreek. Full is required. Must follow the State of Utah guidelines, which can be found at this internet link: If the property is less than 1 acre but not part of a Common Plan of Development: A Land Disturbance Permit shall be issued prior to any work commencing. You can apply for a permit online at the following link: If the property is less than 1 acre but part of a Common Plan of Development: Residential: Notice of intent (NOI) & Common Plan Permit must be filed with the State (801) 536- 4300 and a permit number (from the State) must be submitted to Millcreek. Full Common Plan is required. Commercial: Notice of intent (NOI) & Construction General Permit must be filed with the State (801) 536-4300 and a permit number (from the State) must be submitted to Millcreek. Full Construction General is required. Must follow the State of Utah guidelines, which can be found at this internet link: Note sheet/page number in plans SUBMITTAL Contractor Information MILLCREEK Yes Revise Accept Demolition permits are only issued to the following: State licensed demolition or wrecking contractors, state licenses general contractors, state licensed engineering contractors, or property owners acting as their own general contractor. Please see owner/builder forms at