Full Text
1 Design Review Committee Document Meeting Number 1 2 3 Submittal Date: The Purpose of this DRC is to: Provide opportunity to identify major issues for the project. Acquaint applicant with requirements and procedures to facilitate a complete application Review the process for approval. DRC meetings meet everyday Wednesday starting at 9am. 3 appointments are scheduled each week. Your submittal must be done a week and a half before your desired meeting date. Proposals with significant policy, legal, or otherwise complex issues may need more than one DRC before you can submit a formal application. You MUST provide at a minimum a site plan or survey for your DRC submittal. Complex projects should provide engineering, elevations, site plan, and survey at time of submittal for more accurate reviews and feedback. Site Plan (to scale) Elevations Survey of property PrelimIVVnary Plat Architectural Plans Engineering Plans Landscape Plans Applicant is providing (circle all that apply & attach plans) A site plan is the minimum required document to schedule a DRC, but by not providing the above documents at the DRC applicant acknowledges that errors or issues may be discovered by Millcreek Staff during subsequent reviews that will need to be resolved before any department issues final approval of any application. Please make sure your site plan is to scale and includes: The location of the proposed development. Boundaries of the property The location of each existing and proposed building and structure. floor plans showing the utilization of space for each structure. e. The location and arrangement of all curb cuts, private streets and drives, pedestrian walks (if any), parking and loading areas. Name Full Address Phone Email Project Name Project Address ---PAGE BREAK--- 3 2 Planning Is project subject to fcoz? Is project subject to the floodplain ordinance? Is there a road dedication required? What public improvements are required? Landscaping requirements? Do plans require parking? Open space? Shared parking? What utilities are affected? Do plans require udot approval? State approvals? Are there easements to consider? Special exceptions? Rezone required? Elevation restrictions? Rcoz applicable? Which zone? What are setbacks for property? Is there a bla or lot consolidation? Is it next to residential zone? Is project mixed-use? Bonding discussion? Fee discussion? Timeline of review discussion Landscaping buffers? Parking lot landscaping? Reduced setbacks? Creating additional lots? Traditional? Subdivision? Pud? Cc&r’s ? Is the property nonconforming? Structure noncomplying? Traffic impacts? Is a traffic study needed? Planning Notes None at this time. Your project will be considered by each department at the DRC. Not all the below considerations may apply to your project. Please review the considerations before your DRC and be prepared to answer questions. If staff marks the box it means the topic applies to your project and you may need to meet additional requirements in order to be permitted for the project. Millcreek Staff will fill out boxes at your DRC to confirm. STAFF USE ONLY ---PAGE BREAK--- 5 4 Engineering Do plans fall inside of a fault study zone? Fault line? A geo-tech required? Is there a road dedication required? Are plans and swma required? Over one-acre? Storm water considerations? Detention or retention? Pond sizing? Critical slopes? In the fcoz? Road classification? What cross section applies? Do plans have canals and ditches? Require canal company approval? Bonding discussion? Fee discussion? Timeline of review discussion Geologic hazards ? Engineering Notes None at this time. ---PAGE BREAK--- 7 6 Distance from structure to roadway? Accessibility? Commercial code or residential code apply? Sprinklers needed? Bonding discussion? Fee discussion? Timeline of review discussion Permit process? Demo permit? Flood plain? Fire Impact fees? Utilities? Code analysis? Building Building Notes None at this time. ---PAGE BREAK--- 8 Fire Where is the closest hydrant? Show on plans where Numbers of units? Elevation of structure(s) Roadways? Private roads? Streets? Width of roadways? Sprinklers? Distance from structure to roadway? Dead End? Depth? Code Modification needed? Occupancy Type? Fire Notes None at this time.