Full Text
Ground Rod 3/4" x 10"-0" Tied to Rebar Cage Detail - Pole Spacing From Face of Curb Scale: No Scale 30" Minimum Junction Box With Fuses Splice Box Carson L 1419-12 Box Carson L 1419-12 Box Hot Leg With Fuse Hot Leg With Fuse Neutral Wires Ground Wires Ground Wires Neutral Hot Leg Hot Leg RAB 350 Series Connector Rocky Mountian Power Detail - Junction Box With Fuses Scale: No Scale Detail - Splice Box Scale: No Scale Notes: 1) Arterial Light Poles Shall be Located as Indicated on the Approved Lighting Site Plan; and as Described in the City Standards. 2) 3) Each Arterial Light Shall Have a Junction Box With Safety Switch and Fuse. 4) Fuse Hot Wire in Junction Boxes; Supply Splice Kit for Neutral Wire. 5) Mark Junction Box Covers with "Lighting". 6) Install PVC Conduits with 24" Cover and Sand Bedding 7) Contractor to Install Junction Box with Fuse. Box to be Located 8 Feet From Rocky Mountain Power Transformer or Secondary Box. Leave Pigtail 8 Feet Long to Secondary Box; Rocky Mountain Power to Make Connection. 8) 9) 10) 3000 PSI Concrete @ 28 days Per APWA Section 03304 11) No Excavation Within 8' of Pole Foundation Refer to Millcreek City Vendor for Ordering Light Assembly Parts. Rebar and Trench Must be Inspected. Electronic Asbuilts must be Sent as Autocad DWG. 2" PVC Conduit From Rocky Mountian Power To Next Light Top of Concrete Ground Surface 3 4" Galvinized Anchor Bolts #4 Bars with #4 Ties Concrete Base 30" Ø Trunk Line 2" PVC Conduit with #6 Stranded Copper Road base fill 90% Compaction in 6" lifts or Flowable fill Precast Concrete Collar Collector Street Light Arterial Street Light