← Back to Middleton

Document Middleton_doc_aea730a9f1

Full Text

ZONING PERMIT CITY OF MIDDLETON CHECKLIST REQUIREMENTS PER SECTION 10.10.41 APPLICATION REQUIREMENTS The City strongly prefers to receive the application electronically via e-mail to [EMAIL REDACTED], although a paper copy will also be accepted. ❑ Completed and signed Zoning Permit application (this form). ❑ The location and use of all existing and proposed structures on-site. For non-residential projects, also provide the total amount of on-site employees (if applicable) ❑ Site Plan submitted in accordance with Section 10.10.43. See also the Site Plan Checklist. ❑ Payment of the zoning permit fee* *You will receive an email regarding permit payment options after your permit has been reviewed. • Prior to plan submittal, applicant should identify lot boundaries and determine whether any public or private easements affect the property. • Prior to construction, contact Diggers Hotline at (800) 242-8511 or • Some properties in the city require the approval of a Neighborhood Architectural Review Committee or Homeowner’s Association that is separate from the City’s permitting process. PROCEDURES 1. Action by Zoning Administrator. A Zoning Permit shall be granted or denied by the Zoning Administrator, in writing within 30 days of the application, and the applicant shall post such permit in a conspicuous place at the site. Any permit issued in conflict with the provisions of the Chapter shall be null and void. 2. Time Limits on Zoning Permits. The work shall begin within 365 days of approval and be completed within 730 days. Time limits for Conditional Use Permits and Variances may be established at the time of approval. All other permits shall meet the timelines required at the time of issuance as listed elsewhere in the zoning ordinance (Chapter 10). FEES: Zoning Permit Fees (pursuant to City of Middleton Code of Ordinances, Section 10.10.61) Only one fee is charged per application. If an application includes more than one structure type on the same lot, only the highest fee applies. PROJECT CLASS PRINCIPAL STRUCTURE ADDITIONS ACCESSORY STRUCTURES One and Two Family $300 $100 $50 Multi-Family $500 $250 $100 Small Commercial/Industrial (up to 20,000 sf) $500 $250 $100 Large Commercial/Industrial (Over 20,000 sf) $1,000 $250 $100 ---PAGE BREAK--- CITY OF MIDDLETON ▪ 7426 HUBBARD AVE MIDDLETON, WI 53562 ▪ (608) 821-8370 ▪ WWW.CITYOFMIDDLETON.US Zoning Permit 4/17/2025 Page 2 of 3 ZONING PERMIT Submit electronically to [EMAIL REDACTED] No structure shall be erected or altered without first obtaining a Zoning Permit pursuant to Section 10.10.41 of the City of Middleton Zoning Ordinance as well as the appropriate Building Permit(s). PERMIT PERMIT FEE: APPROVED BY: APPROVAL DATE: ADDRESS OF PROPERTY: APPLICANT NAME (PROJECT REP, CONTRACTOR, ETC.) OWNER NAME BUSINESS NAME (IF APPLICABLE) CO-OWNER NAME (IF APPLICABLE) ADDRESS ADDRESS CITY, STATE, ZIP CITY, STATE, ZIP PHONE PHONE E-MAIL E-MAIL WORK CONSISTS OF: PROJECT CLASS (SELECT ONE) SINGLE-FAMILY TWO-FAMILY MULTI-FAMILY SMALL COMMERCIAL/INDUSTRIAL (UP TO 20,000 SF) LARGE COMMERCIAL/INDUSTRIAL (OVER 20,000 SF) PROJECT SCOPE (SELECT ALL THAT APPLY) NEW STRUCTURE ADDITION ALTERATION STRUCTURE TYPE (SELECT ALL THAT APPLY) PRINCIPAL STRUCTURE DECK FENCE OTHER: GARAGE SHED POOL SITE DATA: LOT AREA IMPERVIOUS SURFACE AREAS EXISTING PLANNED ZONING STRUCTURES (INCLUDE ALL OVERHANGS) SF SF DRIVEWAYS, PARKING AREAS, WALKWAYS SF SF OTHER FLAT SURFACES (PATIOS, DECKS, ETC.) SF SF I, the undersigned, do hereby certify that the above information is correct and agree that in the performance of this work I will be bound by and submit to all statutes of the State of Wisconsin, conform to all applicable codes and ordinances of the City of Middleton, and abide by all other applicable rules and regulations. Furthermore, I understand that the City of Middleton is not responsible for enforcing neighborhood covenants, and any granted zoning variances apply only for the specific structure(s) reviewed by the Zoning Board of Appeals. I understand that the City may remove any structure or landscaping feature placed within or upon a public utility easement, and that any repair or restoration work will be at property owner expense. SIGNATURE OF APPLICANT: DATE: ---PAGE BREAK--- CITY OF MIDDLETON ▪ 7426 HUBBARD AVE MIDDLETON, WI 53562 ▪ (608) 821-8370 ▪ WWW.CITYOFMIDDLETON.US Zoning Permit 4/17/2025 Page 3 of 3 STAFF REVIEW – TO BE COMPLETED BY PLANNING AND ZONING OFFICIALS ONLY ADDRESS REVIEWED BY ZONING PDD NAME (IF APPLICABLE) REVIEW DATE PERMITTED USE FLOODPLAIN YES NO CONDITIONAL USE RECEIVED ON: YES NO UNCLEAR LOT AREA (SF) CORNER LOT FEE CATEGORY YES NO PRINCIPAL ADDITION ACCESSORY ZONING REQUIREMENTS SETBACKS ALLOWED BY CODE (IN FEET UNLESS OTHERWISE INDICATED) COMPLIANCE? COMMENTS YES NO FRONT MIN MAX REAR MIN MAX LEFT RIGHT MAXIMUM BUILDING HEIGHT FEET STORIES MAXIMUM IMPERVIOUS SURFACE PERCENT AREA FRONT-LOADED ATTACHED GARAGE STREET FAÇADE WIDTH GARAGE WIDTH DRIVEWAY REGULATIONS MIN MAX TAPER PERMITTED PROJECTIONS (LIST, IF ANY) ACCESSORY STRUCTURES (LIST, IF ANY) SETBACKS HEIGHT CONDITIONS OF APPROVAL 1. DURING CONSTRUCTION, ALL LOT CORNER MONUMENTS MUST BE VISIBLE OR INDICATED BY STAKES. 2. COMPLIANCE WITH CONDITIONS OF APPROVAL STIPULATED BY: a. PLAN COMMISSION MINUTES OF b. ZONING BOARD OF APPEALS MINUTES OF