Full Text

page 1 of 5 Updated: 06/18/2015 Recommended for adoption: 06/22/2015 2016-2021 SIX YEAR TRANSPORTATION PLAN PROGRAM NARRATIVE ITEM NO. 1 80th ST NE SIDEWALK: 47TH AVE NE TO 51ST AVE NE Construct curb, gutter, sidewalk and drainage facilities along the south side of 80th St. NE ITEM NO. 2 MARSHALL ELEMENTARY SAFE ROUTES TO SCHOOL Design and construct pedestrian facilities including curb, gutter, sidewalk and crosswalks along 116th St. NE as part of the Safe Routes to School Program ITEM NO. 3 SUNNYSIDE ELEMENTARY SAFE ROUTES TO SCHOOL Design and construct pedestrian facilities including curb, gutter and sidewalk along Sunnyside Boulevard as part of the Safe Routes to School Program ITEM NO. 4 8TH ST NE: CEDAR TO STATE AVE PED AND BIKE Design and construct pedestrian facilities including curb, gutter, sidewalk and bike lanes along 8th St. across the BNSF mainline as part of the Pedestrian and Bicycle Grant Program ITEM NO. 5 GROVE ST: CEDAR TO STATE AVE PED AND BIKE Design and construct pedestrian facilities including curb, gutter, sidewalk and bike lanes along 8th St. across the BNSF mainline as part of the Pedestrian and Bicycle Grant Program ITEM NO. 6 53RD AVENUE NE: SR 528 TO SUNNYSIDE BLVD Construct bicycle and pedestrian facilities. ITEM NO. 7 CENTENNIAL TRAIL CONNECTION Construct a multi-use trail between 84th St. NE and the Centennial Trail in the vicinity of SR 9 for multimodal connectivity to the Bayview trail. ITEM NO. 8 EBEY WATERFRONT TRAIL Construct a multi-use from SR 529 east along the existing levee to the future breach. Additionally construct a multi-use trail from the east side of the breach to existing trail system. ITEM NO. 9 51ST AVE NE: GROVE ST TO 84TH ST Construct sidewalks on both sides of roadway and make provisions for bike lanes. ITEM NO. 10 ARMAR ROAD: 47TH ST TO GROVE ST Construct sidewalks on both sides of road. ---PAGE BREAK--- page 2 of 5 Updated: 06/18/2015 Recommended for adoption: 06/22/2015 ITEM NO. 11 ANNUAL SIDEWALK PROGRAM Construct curb, gutter, sidewalk or shoulder improvements per the Transportation Benefit District. ITEM NO. 12 STATE AVENUE / SR 528 INTERSECTION Change SE and SW radii as a condition of development of adjacent property to dedicate necessary right-of-way to make this improvement. ITEM NO. 13 SR 528 / ALDER ST. PEDESTRIAN SIGNAL Construct a new pedestrian signal on SR 528 between Alder and Quinn. ITEM NO. 14 SR 528 / 67TH AVE NE INTERSECTION Modify northwest corner of intersection including signal improvements to accommodate improved truck turning movements. ITEM NO. 15 116TH ST NE / STATE AVENUE Construct turn lane(s), modify traffic signal, add a second westbound thru lane and extend the eastbound right-turn lane. ITEM NO. 16 SR 528 / DELTA AVENUE PEDESTRIAN SIGNAL Construct a new pedestrian signal at the intersection of SR 528 and Delta Avenue. ITEM NO. 17 STATE AVENUE / 88TH ST NE INTERSECTION Add thru lanes and turn lanes. Modify traffic signal. ITEM NO. 18 STATE AVENUE / 84TH ST NE INTERSECTION Construct rail crossing and install a traffic signal. Close adjacent rail crossings. Project will be developer initiated and driven. ITEM NO. 19 SR 528 / 76TH ST NE INTERSECTION Design and construct a traffic signal and additional channelization. ITEM NO. 20 51ST AVENUE NE / 152ND STREET NE INTERSECTION Design and construct a traffic signal and additional channelization. ITEM NO. 21 STATE AVE / 100TH ST / SHOULTES RD INTERSECTIONS Design and construct intersection improvements to the two intersections as one project for better traffic flow. Due to intersection proximity a dumbbell roundabout will be considered. ITEM NO. 22 STATE AVE.-1ST ST. TO 88TH ST. NE Improve traffic signal timing and phasing, improve visibility of traffic signal heads, improve conditions for pedestrians in crosswalks, add illumination and a right turn land and install signs. Improvements occur at the intersections of State Ave. NE and 4th St. NE, 80th St. NE ---PAGE BREAK--- page 3 of 5 Updated: 06/18/2015 Recommended for adoption: 06/22/2015 and 88th St. NE; providing a westbound to northbound right drop lane, new structural wall, and signal modifications as part of grant funding through WSDOT and SAFETEA-LU. ITEM NO. 23 CITYWIDE INTERSECTION IMPROVEMENTS Improve traffic signal operations at seven intersections, increase visibility of traffic signal heads with the installation of reflective signal head backplates at two intersections and upgrade railroad/traffic signal interconnect equipment, circuitry and operations at four intersections. Signal operations will be improved with the installation of flashing yellow arrow (FYA) left turn signal displays at six intersections and installation of advanced vehicle detection at one State Avenue intersection. ITEM NO. 24 INTELLIGENT TRANSPORTATION SYSTEM Implement Intelligent Transportation Systems Program to improve signal coordination and management, roadway monitoring and response, ITS device management, and data collection. System to include communications equipment, traffic signal equipment, video surveillance and monitoring, video detection, and satellite traffic management center. ITEM NO. 25 STATE AVENUE: 116TH STREET NE TO 136TH STREET NE Install additional 2 lanes, curb, gutter and sidewalk to the existing 3-lane roadway for the ultimate 5-lane roadway section. ITEM NO. 26 STATE AVENUE: 100TH STREET NE TO 116TH STREET NE This project will provide a 5 lane roadway section with curb, gutter and sidewalk, and replace the Quilceda Creek culvert and embankment. ITEM NO. 27 SUNNYSIDE BOULEVARD: 47TH AVE. NE TO 52ND ST. NE This existing two-lane roadway is proposed for expansion to a five-lane roadway section in a phased manner. New traffic signals at 53rd Ave NE and 52nd St NE ITEM NO. 28 152nd STREET NE: STATE AVE. TO 43RD VIC. Widen existing roadway from two lanes to three, install curb, gutter and sidewalk. ITEM NO. 29 51ST AVENUE NE: 160TH ST NE TO ARLINGTON CITY LIMITS Widen existing roadway from two lanes to 5 lanes, install curb, gutter and sidewalk, including bicycle and pedestrian facilities. ITEM NO. 30 88TH STREET NE: 36TH AVE NE TO I-5 Construct westbound right turn drop lane on 88th St NE from the 36th Ave. NE to Interstate 5. ITEM NO. 31 SR 528 / I-5 INTERCHANGE ADDITIONAL LANES Construct additional eastbound and westbound lanes along SR 528 at the interchange with Interstate 5. Add turn lanes. ---PAGE BREAK--- page 4 of 5 Updated: 06/18/2015 Recommended for adoption: 06/22/2015 ITEM NO. 32 156TH STREET NE: STATE AVE. TO 51ST AVE. VIC. Provide new east-west 5-lane connection between State Avenue to the west and 51st Avenue to the east, complete with curb, gutter, and sidewalk. ITEM NO. 33 FIRST STREET BYPASS Preliminary study to explore possible alignment options and feasibility of creating a “bypass” connection between First Street and 61st Street NE/Sunnyside Boulevard. Establish an alignment and determine ROW needs. ITEM NO. 34 40TH ST NE/83rd AVE NE/35th ST NE: TO SR 9 Design and construct a 3-lane arterial alignment along 40th and 5-lane principal arterial alignment along 87th, and 35th — connecting to new west leg of SR9/SR 92 intersection. ITEM NO. 35 27TH AVE EXTENSION FROM 156TH ST NE TO 166TH ST NE Construct a new roadway alignment to connect 156th St NE to 166th St NE. ITEM NO. 36 ARTERIAL IMPROVEMENTS FOR TRANSPO COMP PLAN Credit select, applicable traffic mitigation fees for portions of arterial improvements that do not directly access private development land uses. ITEM NO. 37 23RD AVE. NE / 169TH ST NE Create a fourth leg on the south side of the roundabout at 172nd (SR 531) at 23rd Ave NE and construct a new roadway alignment carrying 23rd Ave south and constructing a new section of 169th St. NE for connectivity. ITEM NO. 38 156TH ST NE. INTERCHANGE The project would convert the 156th St. NE Overcrossing to a full Single Point Urban Interchange. Initial funding will begin the Interchange Justification Report with WSDOT ITEM NO. 39 ANNUAL PAVEMENT PRESERVATION PROGRAM Pavement preservation and restoration at various locations determined by pavement condition rating prioritization. Preservation methods include overlays, ultra thin HMA, etc… ITEM NO. 40 88th STREET NE: STATE AVENUE TO 67TH AVENUE NE Proposed joint Snohomish County/Marysville project to widen the existing 2-lane road to a 5- lane roadway with curb, gutter and sidewalks. Also provide capacity improvements at arterial intersections. Interim improvements may build out to a 3-lane section until the full 5-lane section is necessary. ITEM NO. 41 152ND STREET NE: 43RD AVE VIC TO 67TH AVENUE NE Proposed joint Snohomish County/Marysville project to widen the existing 2-lane road to a 3- lane roadway with curb, gutter and sidewalks. Also provide capacity improvements at arterial intersections. ---PAGE BREAK--- page 5 of 5 Updated: 06/18/2015 Recommended for adoption: 06/22/2015 ITEM NO. 42 SR 529 / INTERSTATE 5 INTERCHANGE EXPANSION Construct new northbound off-ramp from Interstate 5 to SR 529 and new southbound on- ramps from SR 529 to Interstate 5 completing a full interchange at this location. ITEMS NO. 43 STATE AVENUE DEBT SERVICE Yearly debt payments necessary to provide a portion of the local match funding to pay for the State Avenue, Grove Street to First Street project. ITEMS NO. 44 LIMITED BOND FOR STREET CONSTRUCTION PROJECTS 2007 Limited Bond for street construction projects including State Ave. 116th to 136th, State Ave. 136th to 152nd, SR 528 / 47th Ave. Intersection and 3rd St. NE / 47th Ave Intersection