← Back to Lewiston

Document Lewiston_doc_def134ad0b

Full Text

4 1 3 4 8 7 7 632 325 30 645 673 659 330 28 35 10 G G # # # Remove Pavement Between Limits of Work Replace Existing 18" RCP with New 24" HDPE Culvert Limit of Work Limit of Work Lower and Replace Existing 12" D/W Culvert Clean out and Regrade Existing Ditch to New Culvert Add Base Gravel as Necessary to Adjust C/L. 12" Max WEBSTER ST. ALFRED A. PLOURDE PKWY. TRIDENT DR. LEXINGTON ST. BAYBERRY LN. MITCHELL ST. 1977 1960 1984 1987 1977 1987 12" DI 8" DI 6" DI 16" UCI 6" 16" LCI 12" DI 16" LCI 16" LCI 12" DI 6" 12" DI 12" DI 12" DI 12" DI PVC SEWER ACP SEWER ACP SEWER ACP SEWER PVC SEWER 10'' PVC UD UNK-MAT UD 12'' PVC DRAIN CPE-SB UD 16'' RCP DRAIN PVC UD 12'' ACP DRAIN 16'' ACP DRAIN 12'' PVC UD 15'' ACP DRAIN 12'' PVC CBLAT CPE-SB UD 12'' PVC CBLAT 2014 Road Rehabilitation Program Pond Road House #437 to No Name Pond Road AAPP from Webster Street to Lexington Street Lewiston Public Works Engineering Division July 2014 Sheet 1 of 1 ---PAGE BREAK--- # # # # # # # # # # # # # # # # # # # # # # # # # # # # # Note: Contractor shall Remove Pavement within Limits of Project. Gravel to be Added after Reclaim as Necessary. Loan and Seed Lawns where Existing. Gravel Shoulder for Rest of Project. Rip Rap Inlet and Outlet Pipes. Limit of Work Limit of Work POND RD. OLD GREENE RD. POND RIDGE DR. NO NAME POND RD. SHORE RD. (PVT) PONDVIEW DR. GREENWOOD LN. 2014 Road Rehabilitation Program Pond Road House #437 to No Name Pond Road AAPP from Webster Street to Lexington Street Lewiston Public Works Engineering Division July 2014 Sheet 1 of 1 Replace existing CMP culverts wtih new12' HDPE culvert Reclaim and Paving to be Done by Others Install New Catch Basin and 12" HDPE Pipe Ditch