# Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 1,500 LF install 6" - 8" water main 24.99 37,485.00 $ 22.00 33,000.00 38.00 57,000.00 29.00 43,500.00 25.00 37,500.00 2 2 EA install hydrant 1,200.00 2,400.00 800.00 1,600.00 2,000.00 4,000.00 880.00 1,760.00 1,000.00 2,000.00 3 16 EA install/reconnect 3/4" water service 750.00 12,000.00 500.00 8,000.00 800.00 12,800.00 890.00 14,240.00 1,200.00 19,200.00 4 15 CY rock & boulder excavation 100.00 1,500.00 0.01 0.15 50.00 750.00 0.01 0.15 100.00 1,500.00 5 225 CY Aggregate base 12.00 2,700.00 16.00 3,600.00 18.00 4,050.00 19.50 4,387.50 17.00 3,825.00 6 450 CY aggregate sub-base 12.00 5,400.00 15.00 6,750.00 20.00 9,000.00 17.50 7,875.00 14.00 6,300.00 7 100 CY select backfill 10.00 1,000.00 13.00 1,300.00 10.00 1,000.00 10.00 1,000.00 8.00 800.00 8 260 TON F/I 19 mm hot mix asphalt 82.00 21,320.00 79.00 20,540.00 90.00 23,400.00 79.00 20,540.00 85.00 22,100.00 9 130 TON F/I 9.5 mm hot mix asphalt 101.00 13,130.00 98.00 12,740.00 90.00 11,700.00 98.00 12,740.00 93.00 12,090.00 10 50 TON F/I 9.5 mm HMA hand placed 125.00 6,250.00 115.00 5,750.00 130.00 6,500.00 120.00 6,000.00 113.00 5,650.00 11 1 LS Miscellaneous work 2,500.00 2,500.00 11,060.00 11,060.00 7,800.00 7,800.00 6,000.00 6,000.00 10,000.00 10,000.00 12 1 LS Mobilization and Cleanup 4,942.25 4,942.25 4,200.00 4,200.00 7,800.00 7,800.00 9,000.00 9,000.00 7,000.00 7,000.00 13 200 SY Loam & seed 3.50 700.00 4.50 900.00 5.00 1,000.00 5.00 1,000.00 6.00 1,200.00 14 1,400 SY Prepare trench & sidewalk for paving 3.75 5,250.00 5.70 7,980.00 5.00 7,000.00 5.00 7,000.00 6.00 8,400.00 # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 50 LF F/I 6" catch basin lead 27.00 1,350.00 30.00 1,500.00 30.00 1,500.00 34.00 1,700.00 46.00 2,300.00 2 350 LF F/I 8" catch basin lead 27.00 9,450.00 35.00 12,250.00 38.00 13,300.00 35.00 12,250.00 38.00 13,300.00 3 1,075 LF F/I 12" storm drain 31.57 33,937.75 30.00 32,250.00 40.00 43,000.00 43.18 46,418.50 41.00 44,075.00 4 1,450 LF F/I 15" storm drain 39.00 56,550.00 37.00 53,650.00 42.00 60,900.00 45.10 65,395.00 47.00 68,150.00 5 825 LF F/I 18" storm drain 42.50 35,062.50 41.00 33,825.00 50.00 41,250.00 50.28 41,481.00 55.00 45,375.00 6 350 LF F/I 24" storm drain 50.00 17,500.00 51.00 17,850.00 55.00 19,250.00 56.80 19,880.00 69.00 24,150.00 7 415 LF F/I 30" storm drain 71.50 29,672.50 66.50 27,597.50 60.00 24,900.00 79.35 32,930.25 90.00 37,350.00 8 10 LF F/I 36" storm drain 200.00 2,000.00 137.00 1,370.00 100.00 1,000.00 205.00 2,050.00 129.00 1,290.00 9 14 EA F/I 4' dia. Catch basin 2,600.00 36,400.00 2,055.00 28,770.00 3,000.00 42,000.00 2,410.00 33,740.00 2,200.00 30,800.00 10 15 EA F/I 4' dia. Storm drain manhole 3,300.00 49,500.00 2,400.00 36,000.00 3,200.00 48,000.00 3,200.00 48,000.00 3,100.00 46,500.00 11 2 EA F/I 5' dia. Storm drain manhole 3,500.00 7,000.00 2,700.00 5,400.00 4,000.00 8,000.00 3,500.00 7,000.00 4,100.00 8,200.00 12 25 CY Rock & boulder excavation 1.00 25.00 0.01 0.25 50.00 1,250.00 100.00 2,500.00 100.00 2,500.00 13 825 CY Aggregate Base 12.00 9,900.00 17.00 14,025.00 18.00 14,850.00 19.50 16,087.50 17.00 14,025.00 14 1,650 CY Aggregate sub-base 12.00 19,800.00 15.00 24,750.00 16.00 26,400.00 17.50 28,875.00 14.00 23,100.00 15 300 CY Select backfill 10.00 3,000.00 13.80 4,140.00 10.00 3,000.00 10.00 3,000.00 8.00 2,400.00 16 775 TON F/I 19 mm Hot mix asphalt 82.00 63,550.00 79.00 61,225.00 90.00 69,750.00 79.00 61,225.00 85.00 65,875.00 17 390 TON F/I 9.5 mm hot mix asphalt 101.00 39,390.00 98.00 38,220.00 90.00 35,100.00 98.00 38,220.00 93.00 36,270.00 18 125 TON F/I 9.5 mm HMA hand placed 125.00 15,625.00 115.00 14,375.00 130.00 16,250.00 120.00 15,000.00 113.00 14,125.00 19 300 LF F/I Bituminuous curb 13.00 3,900.00 15.00 4,500.00 10.00 3,000.00 15.00 4,500.00 12.00 3,600.00 20 1 LS Miscellaneous work 10,000.00 10,000.00 10,900.00 10,900.00 7,000.00 7,000.00 6,000.00 6,000.00 50,000.00 50,000.00 21 1 LS Mobilization and Cleanup 10,000.00 10,000.00 18,934.87 18,934.87 7,000.00 7,000.00 15,000.00 15,000.00 24,000.00 24,000.00 22 700 SY Loam & seed 3.50 2,450.00 4.50 3,150.00 4.00 2,800.00 5.00 3,500.00 6.00 4,200.00 23 4,900 SY Prepare trench & sidewalk for paving 3.75 18,375.00 4.60 22,540.00 3.00 14,700.00 5.00 24,500.00 6.00 29,400.00 24 150 HR Flagger 17.00 2,550.00 16.00 2,400.00 18.00 2,700.00 15.00 2,250.00 15.00 2,250.00 Mechanic Falls ME Part 2: Storm Drain Lisbon ME Lewiston ME West Gardiner ME Lewiston ME Pratt & Sons Bid 2013-019 Longchamps & Sons Gendron & Gendron McGee Construction St. Laurent & Son Jepson Brook Sewer Separation Phase IV Gendron & Gendron Lewiston ME 117,420.15 $ West Gardiner ME Lewiston ME Pratt & Sons Lisbon ME Mechanic Falls ME Part 1: Water Main Replacement Total Longchamps & Sons 153,800.00 $ 135,042.65 $ 116,577.25 $ Part 1: Water Main Replacement St. Laurent & Son 137,565.00 $ Bid 2013-019 McGee Construction ---PAGE BREAK--- 25 50 HR Hand labor 1.00 50.00 25.00 1,250.00 40.00 2,000.00 35.00 1,750.00 25.00 1,250.00 26 25 HR Foreman 1.00 25.00 35.00 875.00 50.00 1,250.00 40.00 1,000.00 55.00 1,375.00 27 20 HR Air tool & compressor w/operator 1.00 20.00 15.00 300.00 65.00 1,300.00 40.00 800.00 65.00 1,300.00 28 25 HR All purpose excavator 1.00 25.00 100.00 2,500.00 120.00 3,000.00 90.00 2,250.00 115.00 2,875.00 29 25 HR Truck w/operator 1.00 25.00 65.00 1,625.00 60.00 1,500.00 75.00 1,875.00 65.00 1,625.00 30 25 HR Front End Loader w/operator 1.00 25.00 65.00 1,625.00 80.00 2,000.00 80.00 2,000.00 85.00 2,125.00 31 80 LF F/I 6" PVC Sewer/Storm service 45.00 3,600.00 32.00 2,560.00 40.00 3,200.00 50.00 4,000.00 140.00 11,200.00 # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 1,500 LF install 6" - 8" water main 26.00 39,000.00 $ 35.00 52,500.00 35.00 52,500.00 50.00 75,000.00 2 2 EA install hydrant 2,000.00 4,000.00 1,800.00 3,600.00 2,000.00 4,000.00 2,200.00 4,400.00 3 16 EA install/reconnect 3/4" water service 875.00 14,000.00 580.00 9,280.00 1,000.00 16,000.00 800.00 12,800.00 4 15 CY rock & boulder excavation 150.00 2,250.00 200.00 3,000.00 100.00 1,500.00 150.00 2,250.00 5 225 CY Aggregate base 16.00 3,600.00 26.85 6,041.25 18.00 4,050.00 21.00 4,725.00 6 450 CY aggregate sub-base 15.00 6,750.00 24.50 11,025.00 16.00 7,200.00 21.00 9,450.00 7 100 CY select backfill 13.00 1,300.00 19.00 1,900.00 11.00 1,100.00 18.00 1,800.00 8 260 TON F/I 19 mm hot mix asphalt 92.50 24,050.00 85.00 22,100.00 85.00 22,100.00 125.00 32,500.00 9 130 TON F/I 9.5 mm hot mix asphalt 103.00 13,390.00 105.00 13,650.00 110.00 14,300.00 125.00 16,250.00 10 50 TON F/I 9.5 mm HMA hand placed 126.00 6,300.00 130.00 6,500.00 130.00 6,500.00 150.00 7,500.00 11 1 LS Miscellaneous work 3,700.00 3,700.00 7,400.00 7,400.00 4,000.00 4,000.00 4,800.00 4,800.00 12 1 LS Mobilization and Cleanup 17,000.00 17,000.00 6,500.00 6,500.00 8,000.00 8,000.00 8,950.00 8,950.00 13 200 SY Loam & seed 13.00 2,600.00 6.50 1,300.00 6.00 1,200.00 7.50 1,500.00 14 1,400 SY Prepare trench & sidewalk for paving 2.25 3,150.00 8.50 11,900.00 4.00 5,600.00 7.50 10,500.00 # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 50 LF F/I 6" catch basin lead 24.00 1,200.00 38.50 1,925.00 50.00 2,500.00 55.00 2,750.00 2 350 LF F/I 8" catch basin lead 26.00 9,100.00 50.00 17,500.00 50.00 17,500.00 60.00 21,000.00 3 1,075 LF F/I 12" storm drain 46.00 49,450.00 40.00 43,000.00 55.00 59,125.00 45.00 48,375.00 4 1,450 LF F/I 15" storm drain 49.00 71,050.00 45.00 65,250.00 60.00 87,000.00 50.00 72,500.00 5 825 LF F/I 18" storm drain 54.00 44,550.00 50.00 41,250.00 65.00 53,625.00 55.00 45,375.00 6 350 LF F/I 24" storm drain 61.00 21,350.00 60.00 21,000.00 70.00 24,500.00 70.00 24,500.00 7 415 LF F/I 30" storm drain 83.00 34,445.00 80.00 33,200.00 75.00 31,125.00 90.00 37,350.00 8 10 LF F/I 36" storm drain 162.00 1,620.00 165.00 1,650.00 175.00 1,750.00 150.00 1,500.00 9 14 EA F/I 4' dia. Catch basin 2,500.00 35,000.00 3,000.00 42,000.00 3,500.00 49,000.00 2,900.00 40,600.00 10 15 EA F/I 4' dia. Storm drain manhole 3,100.00 46,500.00 3,500.00 52,500.00 3,500.00 52,500.00 3,000.00 45,000.00 11 2 EA F/I 5' dia. Storm drain manhole 4,700.00 9,400.00 5,850.00 11,700.00 4,000.00 8,000.00 3,500.00 7,000.00 12 25 CY Rock & boulder excavation 150.00 3,750.00 200.00 5,000.00 100.00 2,500.00 100.00 2,500.00 Pratt & Sons Lisbon ME Lewiston ME West Gardiner ME Lewiston ME Mechanic Falls ME Longchamps & Sons Gendron & Gendron McGee Construction St. Laurent & Son 614,985.00 Part 1: Water Main Replacement Wayne ME Turner ME Bid 2013-019 C H Stevenson K & K Excavation T-Buck Construction Trombley Construction Auburn ME Presque Isle ME 480,757.75 480,357.62 521,150.00 545,177.25 Part 2: Storm Drain Total TOTAL PART 1 AND PART 2 597,335.00 $ 597,777.77 $ Bid 2013-019 C H Stevenson K & K Excavation 674,950.00 $ 680,219.90 $ 752,550.00 $ Part 1: Water Main Replacement Total 141,090.00 $ 156,696.25 $ 148,050.00 $ 192,425.00 $ T-Buck Construction Trombley Construction Part 2: Storm Drain Wayne ME Turner ME Auburn ME Presque Isle ME ---PAGE BREAK--- 13 825 CY Aggregate Base 16.00 13,200.00 24.00 19,800.00 18.00 14,850.00 21.00 17,325.00 14 1,650 CY Aggregate sub-base 15.00 24,750.00 22.00 36,300.00 16.00 26,400.00 21.00 34,650.00 15 300 CY Select backfill 13.00 3,900.00 19.00 5,700.00 11.00 3,300.00 18.00 5,400.00 16 775 TON F/I 19 mm Hot mix asphalt 92.50 71,687.50 85.00 65,875.00 82.00 63,550.00 125.00 96,875.00 17 390 TON F/I 9.5 mm hot mix asphalt 103.00 40,170.00 105.00 40,950.00 105.00 40,950.00 125.00 48,750.00 18 125 TON F/I 9.5 mm HMA hand placed 126.00 15,750.00 125.00 15,625.00 120.00 15,000.00 150.00 18,750.00 19 300 LF F/I Bituminuous curb 7.50 2,250.00 16.50 4,950.00 9.00 2,700.00 20.00 6,000.00 20 1 LS Miscellaneous work 15,300.00 15,300.00 31,500.00 31,500.00 35,446.00 35,446.00 17,000.00 17,000.00 21 1 LS Mobilization and Cleanup 34,625.00 34,625.00 21,000.00 21,000.00 13,000.00 13,000.00 31,800.00 31,800.00 22 700 SY Loam & seed 9.00 6,300.00 6.50 4,550.00 5.00 3,500.00 7.50 5,250.00 23 4,900 SY Prepare trench & sidewalk for paving 12.00 58,800.00 5.50 26,950.00 3.00 14,700.00 9.00 44,100.00 24 150 HR Flagger 23.00 3,450.00 18.50 2,775.00 15.00 2,250.00 20.00 3,000.00 25 50 HR Hand labor 40.00 2,000.00 35.00 1,750.00 35.00 1,750.00 25.00 1,250.00 26 25 HR Foreman 50.00 1,250.00 48.50 1,212.50 55.00 1,375.00 25.00 625.00 27 20 HR Air tool & compressor w/operator 50.00 1,000.00 65.00 1,300.00 70.00 1,400.00 40.00 800.00 28 25 HR All purpose excavator 115.00 2,875.00 120.00 3,000.00 115.00 2,875.00 70.00 1,750.00 29 25 HR Truck w/operator 65.00 1,625.00 72.00 1,800.00 75.00 1,875.00 60.00 1,500.00 30 25 HR Front End Loader w/operator 70.00 1,750.00 95.00 2,375.00 90.00 2,250.00 50.00 1,250.00 31 80 LF F/I 6" PVC Sewer/Storm service 23.00 1,840.00 40.00 3,200.00 56.00 4,480.00 70.00 5,600.00 Wayne ME Turner ME Auburn ME Presque Isle ME 629,937.50 626,587.50 640,776.00 690,125.00 C H Stevenson K & K Excavation T-Buck Construction Trombley Construction Part 2: Storm Drain Total TOTAL PART 1 AND PART 2 771,027.50 $ 783,283.75 $ 788,826.00 $ 882,550.00 $