# Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 200 CY Select backfill 15.75 3,150.00 $ 8.50 1,700.00 12.00 2,400.00 25.00 5,000.00 6.00 1,200.00 2 25 CY Structural rock excavation 50.00 1,250.00 50.00 1,250.00 150.00 3,750.00 135.00 3,375.00 100.00 2,500.00 3 50 CY Extra structural excavation 20.00 1,000.00 50.00 2,500.00 10.00 500.00 30.00 1,500.00 20.00 1,000.00 4 90 CY Aggregate base course crushed 25.00 2,250.00 12.00 1,080.00 18.00 1,620.00 28.50 2,565.00 27.00 2,430.00 5 170 CY Aggregate sub-base gravel 20.00 3,400.00 9.00 1,530.00 14.00 2,380.00 25.50 4,335.00 22.00 3,740.00 6 500 SY Fine grade/prep areas for paving 5.00 2,500.00 7.00 3,500.00 7.00 3,500.00 8.50 4,250.00 2.00 1,000.00 7 80 TON Hot mix asphalt, 12.5mm 150.00 12,000.00 130.00 10,400.00 140.00 11,200.00 140.00 11,200.00 125.00 10,000.00 8 52 LF 12" dia. Storm drain 46.00 2,392.00 40.00 2,080.00 54.00 2,808.00 55.00 2,860.00 29.00 1,508.00 9 125 LF 24" dia. Storm drain 70.00 8,750.00 54.00 6,750.00 54.00 6,750.00 95.00 11,875.00 39.00 4,875.00 10 167 LF 30" dia. Storm drain 85.00 14,195.00 74.50 12,441.50 77.00 12,859.00 115.00 19,205.00 54.00 9,018.00 11 63 LF 36" dia. Storm drain 133.00 8,379.00 150.00 9,450.00 120.00 7,560.00 140.00 8,820.00 96.00 6,048.00 12 1 EA Type F catch basin 1,950.00 1,950.00 1,500.00 1,500.00 2,000.00 2,000.00 1,900.00 1,900.00 650.00 650.00 13 1 EA 4' dia. Catch basin 2,800.00 2,800.00 2,800.00 2,800.00 3,200.00 3,200.00 3,200.00 3,200.00 2,600.00 2,600.00 14 1 EA 5' dia. Catch basin 2,775.00 2,775.00 3,500.00 3,500.00 4,600.00 4,600.00 4,850.00 4,850.00 3,500.00 3,500.00 15 1 EA 4' dia. Storm drain manhole 2,500.00 2,500.00 3,000.00 3,000.00 3,800.00 3,800.00 3,500.00 3,500.00 3,200.00 3,200.00 16 1 EA 5' dia. Storm drain manhole 2,750.00 2,750.00 4,200.00 4,200.00 4,200.00 4,200.00 4,950.00 4,950.00 4,100.00 4,100.00 17 50 SY Loam, seed & mulch 10.00 500.00 4.00 200.00 4.00 200.00 8.50 425.00 6.00 300.00 18 10 HR Hand labor straight time 40.00 400.00 1.00 10.00 50.00 500.00 35.00 350.00 30.00 300.00 19 10 HR Front end loader w/operator 85.00 850.00 1.00 10.00 100.00 1,000.00 110.00 1,100.00 80.00 800.00 20 10 HR All purpose excavator w/operator 90.00 900.00 1.00 10.00 100.00 1,000.00 135.00 1,350.00 80.00 800.00 21 1 LS Traffic Control 6,500.00 6,500.00 1,200.00 1,200.00 3,500.00 3,500.00 1,950.00 1,950.00 2,300.00 2,300.00 22 1 LS Mobilization, misc. & clean up 7,500.00 7,500.00 5,000.00 5,000.00 9,000.00 9,000.00 9,950.00 9,950.00 13,950.00 13,950.00 TOTAL BASE # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 45 CY Common excavation 20.00 900.00 15.00 675.00 24.00 1,080.00 22.00 990.00 15.00 675.00 2 110 SY Fine grade/prep area for paving 10.00 1,100.00 6.00 660.00 11.00 1,210.00 10.85 1,193.50 2.00 220.00 3 40 CY Aggregate base crusehd 40.00 1,600.00 30.00 1,200.00 48.00 1,920.00 38.50 1,540.00 35.00 1,400.00 4 15 TON Hot mix asphalt, 9.5mm hand place 150.00 2,250.00 130.00 1,950.00 175.00 2,625.00 140.00 2,100.00 125.00 1,875.00 5 1 EA 4' dia. Catch basin 3,000.00 3,000.00 3,200.00 3,200.00 2,600.00 2,600.00 3,850.00 3,850.00 2,600.00 2,600.00 6 3 EA Terminal Type 1 curb - 7' long 300.00 900.00 300.00 900.00 300.00 900.00 220.00 660.00 180.00 540.00 7 211 LF Vertical granite curb, Type 1 35.00 7,385.00 31.00 6,541.00 30.00 6,330.00 27.50 5,802.50 26.00 5,486.00 8 24 SF Curb ramp detectable warning plate 70.00 1,680.00 67.00 1,608.00 66.00 1,584.00 75.00 1,800.00 55.00 1,320.00 9 100 SY Loam, seed & mulch 7.50 750.00 6.00 600.00 8.00 800.00 8.00 800.00 6.00 600.00 10 10 HR Hand labor straight time 40.00 400.00 40.00 400.00 55.00 550.00 35.00 350.00 30.00 300.00 11 10 HR Front end loader w/operator 85.00 850.00 80.00 800.00 125.00 1,250.00 110.00 1,100.00 40.00 400.00 12 10 HR All purpose excavator w/operator 90.00 900.00 100.00 1,000.00 140.00 1,400.00 135.00 1,350.00 50.00 500.00 13 1 LS Traffic Control 1,276.00 1,276.00 1,000.00 1,000.00 2,000.00 2,000.00 800.00 800.00 1,000.00 1,000.00 14 1 LS Mobilization, misc. & clean up 5,000.00 5,000.00 3,000.00 3,000.00 1,000.00 1,000.00 1,150.00 1,150.00 1,780.00 1,780.00 TOTAL ALTERNATE BID 27,991.00 23,534.00 25,249.00 23,486.00 18,696.00 St. Laurent & Son 88,327.00 $ 108,510.00 $ 88,691.00 $ Base Bid Storm Drain K & K Excavation 75,819.00 $ Bid 2013-010 Pratt & Sons Mill Street Storm Drain and Sidewalk Longchamps & Sons Lisbon ME 74,111.50 $ Mechanic Falls ME Turner ME Off Road Construction Minot Me Lewiston ME Off Road Construction Bid 2013-010 St. Laurent & Son Longchamps & Sons Pratt & Sons K & K Excavation Alternate Bid - Sidewalk Lewiston ME Lisbon ME Mechanic Falls ME Turner ME Minot Me ---PAGE BREAK--- # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 200 CY Select backfill 17.25 3,450.00 $ 23.00 4,600.00 17.00 3,400.00 17.00 3,400.00 16.70 3,340.00 2 25 CY Structural rock excavation 166.00 4,150.00 185.00 4,625.00 75.00 1,875.00 250.00 6,250.00 33.00 825.00 3 50 CY Extra structural excavation 15.65 782.50 57.50 2,875.00 15.00 750.00 13.00 650.00 15.20 760.00 4 90 CY Aggregate base course crushed 14.50 1,305.00 48.00 4,320.00 19.00 1,710.00 23.00 2,070.00 23.00 2,070.00 5 170 CY Aggregate sub-base gravel 13.25 2,252.50 31.00 5,270.00 12.00 2,040.00 18.00 3,060.00 18.00 3,060.00 6 500 SY Fine grade/prep areas for paving 2.20 1,100.00 5.00 2,500.00 5.00 2,500.00 7.00 3,500.00 4.50 2,250.00 7 80 TON Hot mix asphalt, 12.5mm 142.75 11,420.00 173.00 13,840.00 150.00 12,000.00 136.00 10,880.00 105.00 8,400.00 8 52 LF 12" dia. Storm drain 81.00 4,212.00 58.00 3,016.00 85.00 4,420.00 65.00 3,380.00 60.00 3,120.00 9 125 LF 24" dia. Storm drain 87.00 10,875.00 104.00 13,000.00 95.00 11,875.00 83.00 10,375.00 65.00 8,125.00 10 167 LF 30" dia. Storm drain 102.00 17,034.00 120.00 20,040.00 105.00 17,535.00 103.00 17,201.00 72.00 12,024.00 11 63 LF 36" dia. Storm drain 149.00 9,387.00 150.00 9,450.00 130.00 8,190.00 135.00 8,505.00 130.00 8,190.00 12 1 EA Type F catch basin 1,205.00 1,205.00 2,270.00 2,270.00 4,000.00 4,000.00 2,000.00 2,000.00 1,600.00 1,600.00 13 1 EA 4' dia. Catch basin 1,900.00 1,900.00 2,852.00 2,852.00 4,000.00 4,000.00 3,800.00 3,800.00 2,200.00 2,200.00 14 1 EA 5' dia. Catch basin 2,535.00 2,535.00 4,400.00 4,400.00 4,500.00 4,500.00 8,000.00 8,000.00 2,800.00 2,800.00 15 1 EA 4' dia. Storm drain manhole 3,546.00 3,546.00 3,200.00 3,200.00 4,000.00 4,000.00 4,000.00 4,000.00 2,400.00 2,400.00 16 1 EA 5' dia. Storm drain manhole 4,236.00 4,236.00 4,400.00 4,400.00 4,500.00 4,500.00 7,000.00 7,000.00 3,100.00 3,100.00 17 50 SY Loam, seed & mulch 16.50 825.00 23.00 1,150.00 15.00 750.00 12.00 600.00 8.00 400.00 18 10 HR Hand labor straight time 40.00 400.00 35.00 350.00 35.00 350.00 40.00 400.00 35.00 350.00 19 10 HR Front end loader w/operator 80.00 800.00 90.00 900.00 75.00 750.00 95.00 950.00 75.00 750.00 20 10 HR All purpose excavator w/operator 115.00 1,150.00 145.00 1,450.00 115.00 1,150.00 135.00 1,350.00 115.00 1,150.00 21 1 LS Traffic Control 2,300.00 2,300.00 6,000.00 6,000.00 6,500.00 6,500.00 1,500.00 1,500.00 3,900.00 3,900.00 22 1 LS Mobilization, misc. & clean up 17,800.00 17,800.00 9,100.00 9,100.00 26,123.00 26,123.00 10,898.00 10,898.00 6,963.77 6,963.77 TOTAL BASE # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 45 CY Common excavation 8.10 364.50 20.00 900.00 33.00 1,485.00 23.00 1,035.00 11.00 495.00 2 110 SY Fine grade/prep area for paving 1.50 165.00 8.00 880.00 16.00 1,760.00 8.00 880.00 11.00 1,210.00 3 40 CY Aggregate base crusehd 14.50 580.00 45.00 1,800.00 68.00 2,720.00 40.00 1,600.00 20.00 800.00 4 15 TON Hot mix asphalt, 9.5mm hand place 150.00 2,250.00 180.00 2,700.00 200.00 3,000.00 136.00 2,040.00 115.00 1,725.00 5 1 EA 4' dia. Catch basin 1,900.00 1,900.00 3,650.00 3,650.00 4,500.00 4,500.00 4,500.00 4,500.00 2,200.00 2,200.00 6 3 EA Terminal Type 1 curb - 7' long 270.00 810.00 340.00 1,020.00 260.00 780.00 275.00 825.00 265.00 795.00 7 211 LF Vertical granite curb, Type 1 37.00 7,807.00 40.00 8,440.00 35.00 7,385.00 36.00 7,596.00 27.00 5,697.00 8 24 SF Curb ramp detectable warning plate 15.00 360.00 115.00 2,760.00 85.00 2,040.00 100.00 2,400.00 92.00 2,208.00 9 100 SY Loam, seed & mulch 16.50 1,650.00 20.00 2,000.00 15.00 1,500.00 12.00 1,200.00 12.00 1,200.00 10 10 HR Hand labor straight time 40.00 400.00 40.00 400.00 35.00 350.00 40.00 400.00 45.00 450.00 11 10 HR Front end loader w/operator 80.00 800.00 90.00 900.00 75.00 750.00 95.00 950.00 85.00 850.00 12 10 HR All purpose excavator w/operator 115.00 1,150.00 145.00 1,450.00 115.00 1,150.00 135.00 1,350.00 135.00 1,350.00 13 1 LS Traffic Control 1,000.00 1,000.00 1,750.00 1,750.00 3,500.00 3,500.00 500.00 500.00 4,000.00 4,000.00 14 1 LS Mobilization, misc. & clean up 3,500.00 3,500.00 3,100.00 3,100.00 2,388.00 2,388.00 3,739.00 3,739.00 2,400.00 2,400.00 TOTAL ALTERNATE BID 22,736.50 31,750.00 33,308.00 29,015.00 25,380.00 Lewiston ME Gendron & Gendron 77,777.77 $ Alternate Bid - Sidewalk Gendron & Gendron Woods Excavating LLC Auburn ME Benton ME Lewiston ME 122,918.00 $ Wayne ME Westbrook ME Auburn ME Benton ME Base Bid Storm Drain Wayne ME Westbrook ME Bid 2013-010 C.H. Stevenson Inc. 109,769.00 $ T. Buck Construction Nitram Excavation Bid 2013-010 C.H. Stevenson Inc. Woods Excavating LLC T. Buck Construction Nitram Excavation 102,665.00 $ 119,608.00 $