Document Lewiston_doc_8940c2b95c

Full Text

April 1, 2014 Jepson Brook Sewer Separation Phase V Bid No. 2014-017 Bid Date: 4/8/14 ADDENDUM NO 2 Please make the following changes to the Specifications: Plans: Revise General Note #32 to Read: 32. PROVIDE 2” RIGID INSULATION OVER WATER MAINS, SEWER MAINS, STORM DRAINS, AND SERVICES WHEN COVER IS LESS THAN 4 FEET AND WHERE DIRECTED BY THE ENGINEER. CONTRACTOR SHALL SUPPLY THE INSULATION. Add General Note #59. 59. 2” RIGID INSULATION SHALL BE CLOSED CELL EXTRUDED PLASTIC INSULATION CONFORMING TO AASHTO M230. END Department of Public Works • 103 Adams Ave • Lewiston, ME • 04240 • Voice Tel. [PHONE REDACTED] • Fax [PHONE REDACTED] • TTY/TDD [PHONE REDACTED] – www.lewistonmaine.gov Department of Public Works David A. Jones, P.E. Director