Full Text
ELECTRICAL PERMIT FEE SCHEDULE 1 Updated 4/20/2010 Effective: 6/28/2010 In accordance with the provisions of the Electrical Code, Chapter 18 of the Code of Ordinances, the City Council hereby establishes the following fees: Minimum Fees Residential Minimum Fee $32.00 Commercial Minimum Fee $42.00 Dwelling Units (Single Family/Multi Family) Incls Service $58.00 Manufactured Homes $42.00 Temporary Services $30.00 Service Equipment Single Phase Single Phase Meter and One Panel up to 100 amps $12.00 Each additional 100 amp or Fraction thereof $7.00 Additional Meter $7.00 Additional Sub Panel up to 100 Amps $7.00 Each Subpanel, additional 100 Amp or Fraction thereof $10.00 Service Equipment Three Phase Meter and Panel up to 100 Amp $30.00 Each additional 100 Amp or Fraction thereof $7.00 Each additional Meter $7.00 Each additional Subpanel up to 100 Amps or Fraction thereof $10.00 Each Subpanel, additional 100 Amps or Fraction thereof $10.00 120 Volt Wiring(Opening =Total # of Outlets Lights and Switches 1 to 10 Openings $12.00 11 to 30 Openings $15.00 31 to 60 Openings $20.00 Each additional opening over 61 $0.50 Appliances fixed in place 120 Volt (Compactors, Dishwashers, Disposals, Air Conditioners) $5.00 240 Volt (Wiring Receptacles, Switches, Appliances, Each Device) $10.00 ---PAGE BREAK--- ELECTRICAL PERMIT FEE SCHEDULE 2 Updated 4/20/2010 Effective: 6/28/2010 Heating Electric per KW or Fraction thereof $3.00 Gas Oil or Other $12.00 Swimming Pools and Spas Above Ground $40.00 In Ground $50.00 Hot Tub, Spas, Sauna’s $37.00 Alarm Systems & Low Voltage Systems (Cooper or Fiber) Fire, Burglar Alarms (Permit and Licenses Required) Up to 10 Devices $18.00 Computer, Phone, Cable, Satellite Dish, Sound, Closed Circuit TV (Permit required, No license required) $18.00 Over 10 Devices = Fee +.55 per device over 10 $0.55 Transformers, Generators, UPS (Battery Backup) 1 to 10 KW/KVA $18.00 11 to 25 KW/ KVA $24.00 Over 25 KW/ KVA $30.00 Circuses, Fairs, Special Events (Mass Gatherings) Up to 400 Amps $50.00 More than 400 Amps $100.00 Motors Fractional to 5 HP $8.00 6HP to 10 HP $12.00 11HP up to 25HP $18.00 Each additional 5 HP or Fraction thereof over 25HP $2.00 Signs Permanent $25.00 Portable Mobile $15.00 Emergency Lights Battery and one light unit (per unit) $7.00 ---PAGE BREAK--- ELECTRICAL PERMIT FEE SCHEDULE 3 Updated 4/20/2010 Effective: 6/28/2010 Water Pumps, Sewer Pumps, Gas Pumps, Well Pumps (per Unit) $10.00 Private request electrical inspection/report $150.00 Inspection for State licensing of a business $40.00 Belated Fees Fee for electrical work undertaken prior to the issuance of the appropriate electrical permit: First offense per calender year $200.00 Second or additional offense(s) per calender year double to a maximum per offense $1,600.00 Inspections and department call outs after normal hours (minimum)* $150.00 * = Additional time beyond three hours shall be calculated @ Time and one half for the electrician on call*