Full Text
TABULATION BID TITLE: BITUMINOUS PAVEMENT BID 2014-030 OPEN DATE/TIME: MAY 20, 2014 @ 2:00 P.M. REQUESTING DEPT: PUBLIC WORKS Description: prices are per ton White Bros. Pike Industries Shaw Bros. 1) Type 19 mm, 50 Gyration HMA 65.20 67.00 60.00 2) Type 12.5 mm, 50 Gyration HMA 68.20 69.00 64.00 3) Type 9.5 mm, Surface, 50 Gyration HMA 71.20 73.00 66.00 4) Bituminous Curbing Mix No Bid No Bid No Bid Location of Plant 50 Gendron Dr. Lewiston ME 164 Springwater Poland ME Route 237 Gorham ME Terms Net 30 days Net 30 days Net 30 days Bid Price History White Bros Pike Industries Auburn Asphalt 1) Type 19 mm, 50 Gyration HMA 2013 65.70 68.00 66.00 2012 65.25 68.75 2011 65.00 2010 62.00 2) Type 12.5 mm, 50 Gyration HMA 2013 68.70 71.00 68.00 2012 68.00 71.75 2011 68.00 2010 66.00 3) Type 9.5 mm, Surface, 50 Gyration HMA 2013 71.70 73.00 68.00 2012 70.00 73.75 2011 69.00 2010 66.00 4) Bituminous Curbing Mix 2013 No Bid No Bid 90.00 2012 No Bid No Bid 2011 N/A 2010 N/A