Full Text
Existing Sec. 64(115kV) Existing Sec. 76(34.5kV) Existing Sec. 62(115kV) Existing Sec. 72(34.5kV) Existing Sec. 43(34.5kV) Existing Sec. 202(115kV) Existing Sec. 41(34.5kV) to be removed Existing Sec. 212(115kV) to be removed Existing Sec. 75(34.5kV) Existing Sec. 61(115kV) Existing Sec. 200(115kV) Existing Sec. 72A(34.5kV) Segment 17 Segment 15 Segment 14 Project Overview Map Lewiston, ME Created by: 1/4/2010 Data Sources: Maine Office of GIS (MEGIS), United States Geological Survey (USGS), Central Maine Power Company (CMP), Powers Engineers, Inc. (PEI), TRC Companies, Inc. (TRC). Projection: NAD83, UTM Zone 19N, Grid North. MPRP PROJECT LIMITS (CMP) PROPOSED SUBSTATION PROJECT AREA (PEI) AREAS WITH 115 KV SINGLE POLE STRUCTURES (TRC) AREAS WITH 345 KV SINGLE POLE STRUCTURES (TRC) PROPOSED TRANSMISSION LINE (PEI) EXISTING INFRASTRUCTURE 34.5 KV TRANSMISSION LINE (CMP) 115 KV TRANSMISSION LINE (CMP) 345 KV TRANSMISSION LINE (CMP) POLITICAL BOUNDARIES TOWN BOUNDARY (MEGIS) COUNTY BOUNDARY (MEGIS) CITY OF LEWISTON (MEGIS) 0 2,000 4,000 Feet [ Legend Areas Along Proposed New Section 3026 (345 kV) With Single Pole Structures Area Around Proposed Larrabee Road Substation With 115 kV Single Pole Structures Areas Along Proposed New Section 3026 (345 kV) With Single Pole Structures Areas Along Proposed New Section 3026 (345 kV) With Single Pole Structures Areas Along Proposed New Section 3026 (345 kV) With Single Pole Structures Proposed New Section 3026 (345 kV) Area Along Proposed Section 64 (115 kV) Rebuild With Single Pole Structures Areas Along Proposed New Section 251 (115 kV) With Single Pole Structures Areas Along Proposed New Section 251 (115 kV) With Single Pole Structures Area Along Proposed Section 200 (115 kV) Rebuild With Single Pole Structures Area Along Proposed Section 212 (115 kV) Rebuild With Single Pole Structures