Document Lewiston_doc_4aaaa61abf

Full Text

Bid No: 2014-016 Bid Date: April 8, 2014 Date Issued: March 18, 2014 ADDENDUM 2 PUBLIC WORKS OPERATIONS CENTER OFF-SEASON STORAGE BUILDING Please make the following modifications to the proposal: Item No. 1 Sprinkler system is not required. Item No. 2 The City will provide the Contractor with direction to the specific location of the building and provide the floor elevation at the overhead door entrances. The floor will be roughly six inches above the highest elevation of the building site. Item No. 3 The D-9 bulldozer, when stored in the building, will drive straight in and back out. No turning will be required in the building. The Contractor shall take measures to protect the concrete foundation at the entrances. Item No. 4 The Contractor will be responsible for all electrical equipment, panels, conduit, wires, and testing work required for the installation as requested. In addition, the Contractor shall wire and connect all equipment as required, furnish and install all required systems and equipment grounds in accordance with the requirements, of the National Electrical Code and secure and pay for all permits and certificates as required by Local, State and Federal laws. All work shall be in accordance with the latest issue of the National Electrical Code. Local permit fees shall be waived. All work shall be in accordance with the National Electrical Code requirements as amended to date, with the local electric utility company’s rules, the Fire Underwriters’ requirements and all local, State and Federal laws and regulations. All equipment and wiring shall be Underwriters’ listed. All electrical work must be completed by a State of Maine Registered Master Electrician. PE signed and stamped design drawings are not required for the electrical systems. Item No. 5 The Contractor shall furnish and install an erosion control system as shown on the attached plan. ---PAGE BREAK--- RIVER RD. Proposed 60'x90' Building 50' Front Setback ¯ 0 100 200 50 Feet 1 inch = 101 feet G:\Projects\EngineeringDiv\JimW\NewPWbuilding\PWOpsStorageBuilding-8x11.mxd 3/14/2014 PW Operations Center 195 River Road Proposed Equipment Storage Building Location Map with Groundwater Conservation Overlay District Aerial Photography and mapping compilation performed by James W. Sewall Co. by photogrammetric methods from aerial photographs dated April 9, 2006. Planimetrics and topography features meet ASPRS Class 1 accuracies for 1”=100’ mapping. Horizontal datum: NAD83 State Plane Maine West, Vertical datum NAVD 1988. Units: Feet. Updates are performed on planimetrics from development cAD submissions. Parcel overlay, if displayed, is for reference only, and shall not be used for description, delineation, or transfer. Any service utility information shown is intended for general information only. Other utilities may be present, and the appropriate utility owner should be contacted for detailed information. GIS data is not intended for engineering design. The City of Lewiston shall not be held liable for damages due to discrepancies, and makes no warranty of accuracy of map or data. Field verification is required. 220' Side Setback +20' From Aquifer Boundary Groundwater Conservation Overlay District Boundary Wal-Mart Disturibution Center Existing PW Sand/Salt Sheds Existing PW Stockpile Areas Existing PW Stockpile Areas Existing Compacted Gravel Silt Fence