# Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ 201.11 2 AC Clearing 3,200.00 $ 6,400.00 $ 31,077.00 $ 62,154.00 $ 16,250.00 $ 32,500.00 $ 203.20 1,780 CY Common Excavation 16.00 $ 28,480.00 $ 13.75 $ 24,475.00 $ 20.00 $ 35,600.00 $ 203.21 20 CY Rock Excavation 200.00 $ 4,000.00 $ 250.00 $ 5,000.00 $ 200.00 $ 4,000.00 $ 203.24 2,000 CY Commor Borrow 1.00 $ 2,000.00 $ 18.50 $ 37,000.00 $ 17.00 $ 34,000.00 $ 203.25 2,000 CY Granular Borrow 1.00 $ 2,000.00 $ 21.55 $ 43,100.00 $ 23.00 $ 46,000.00 $ 206.061 20 CY Earth excavation - drainage below grade 30.00 $ 600.00 $ 25.25 $ 505.00 $ 30.00 $ 600.00 $ 304.10 3,300 CY Aggregate Sub-Base Course 27.00 $ 89,100.00 $ 23.55 $ 77,715.00 $ 25.00 $ 82,500.00 $ 403.209 1,000 TON HMA 9.5 mm 116.00 $ 116,000.00 $ 96.00 $ 96,000.00 $ 96.00 $ 96,000.00 $ 502.325 50 CY Structural Concrete Pedestal/Footer 700.00 $ 35,000.00 $ 1,092.00 $ 54,600.00 $ 1,100.00 $ 55,000.00 $ 509.131 1 LS 25'-11" span X 8'-7" rise steel arch 94,000.00 $ 94,000.00 $ 86,872.00 $ 86,872.00 $ 115,000.00 $ 115,000.00 $ 603.159 20 LF 12" culvert pipe, Option III 27.00 $ 540.00 $ 50.58 $ 1,011.60 $ 55.00 $ 1,100.00 $ 603.179 40 LF 18" culvert pipe, Option III 44.00 $ 1,760.00 $ 60.76 $ 2,430.40 $ 65.00 $ 2,600.00 $ 603.219 175 LF 36" culvert pipe, Option III 70.00 $ 12,250.00 $ 104.13 $ 18,222.75 $ 95.00 $ 16,625.00 $ 605.09 1,000 LF 6" underdrain, Type B 20.00 $ 20,000.00 $ 38.17 $ 38,170.00 $ 23.00 $ 23,000.00 $ 605.10 25 LF Underdrain outlet 20.00 $ 500.00 $ 33.05 $ 826.25 $ 25.00 $ 625.00 $ 606.611 332 LF Timber Guardrail 29.00 $ 9,628.00 $ 24.00 $ 7,968.00 $ 25.00 $ 8,300.00 $ 607.16 5,600 LF 4' high vinyl coated chain link fence 13.50 $ 75,600.00 $ 12.90 $ 72,240.00 $ 17.00 $ 95,200.00 $ 608.26 16 SF Curb ramp detectable warning field 80.00 $ 1,280.00 $ 75.00 $ 1,200.00 $ 100.00 $ 1,600.00 $ 610.08 310 CY Riprap (D50=9") 100.00 $ 31,000.00 $ 50.80 $ 15,748.00 $ 40.00 $ 12,400.00 $ 610.16 60 CY Heavy riprap (D50=12") 100.00 $ 6,000.00 $ 64.40 $ 3,864.00 $ 70.00 $ 4,200.00 $ 613.319 3,500 SY Erosion control blanket 2.00 $ 7,000.00 $ 4.50 $ 15,750.00 $ 3.00 $ 10,500.00 $ 615.07 1,300 CY Loam 40.00 $ 52,000.00 $ 37.05 $ 48,165.00 $ 40.00 $ 52,000.00 $ 618.1301 105 Unit Seeding method #1 - plan Qty 17.50 $ 1,837.50 $ 26.00 $ 2,730.00 $ 28.00 $ 2,940.00 $ 618.1401 32 Unit Seeding method #2 - plan Qty 17.50 $ 560.00 $ 21.00 $ 672.00 $ 23.00 $ 736.00 $ 619.1201 137 Unit Mulch - plan Qty 12.75 $ 1,746.75 $ 13.00 $ 1,781.00 $ 15.00 $ 2,055.00 $ 627.733 6,620 LF 4" white or yellow marking line 0.30 $ 1,986.00 $ 0.30 $ 1,986.00 $ 0.40 $ 2,648.00 $ 629.05 20 HR Hand labor, straight time 30.00 $ 600.00 $ 45.00 $ 900.00 $ 35.00 $ 700.00 $ 631.12 20 HR All purpose excavator w/operator 130.00 $ 2,600.00 $ 155.00 $ 3,100.00 $ 125.00 $ 2,500.00 $ 631.171 20 HR Truck - small w/operator 60.00 $ 1,200.00 $ 75.00 $ 1,500.00 $ 65.00 $ 1,300.00 $ 631.22 20 HR Smal front end loader w/operator 70.00 $ 1,400.00 $ 125.00 $ 2,500.00 $ 110.00 $ 2,200.00 $ 635.31 2,280 SF Pre-fab concrete block gravity wall 35.00 $ 79,800.00 $ 36.08 $ 82,262.40 $ 35.00 $ 79,800.00 $ 645.1 4 EA MUTCD signs 250.00 $ 1,000.00 $ 190.00 $ 760.00 $ 125.00 $ 500.00 $ Gorham ME Riverside Greenway Bicycle/Pedestrian Path Phase II Bid 2014-012 J. Pratt Hebron ME Peter's Construction Buxton ME Glidden Excavation ---PAGE BREAK--- # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ 652.31 5 EA Type I barricade 30.00 $ 150.00 $ 325.00 $ 1,625.00 $ 75.00 $ 375.00 $ 652.312 4 EA Type II barricade 30.00 $ 120.00 $ 425.00 $ 1,700.00 $ 100.00 $ 400.00 $ 652.33 5 EA drum 40.00 $ 200.00 $ 50.00 $ 250.00 $ 60.00 $ 300.00 $ 652.34 10 EA cone 10.00 $ 100.00 $ 15.00 $ 150.00 $ 15.00 $ 150.00 $ 652.35 40 SF construction signs 10.00 $ 400.00 $ 19.00 $ 760.00 $ 30.00 $ 1,200.00 $ 652.361 1 LS Maintenance of traffic control devices 500.00 $ 500.00 $ 675.00 $ 675.00 $ 1,500.00 $ 1,500.00 $ 652.38 20 HR flaggers 16.00 $ 320.00 $ 17.35 $ 347.00 $ 25.00 $ 500.00 $ 656.75 1 LS Temp. erosion/water pollution control 13,000.00 $ 13,000.00 $ 16,500.00 $ 16,500.00 $ 30,000.00 $ 30,000.00 $ 659.10 1 LS Mobilization 180,650.00 $ 180,650.00 $ 80,000.00 $ 80,000.00 $ 95,000.00 $ 95,000.00 $ 802.162 8 EA adjust sewer manhole 500.00 $ 4,000.00 $ 485.00 $ 3,880.00 $ 650.00 $ 5,200.00 $ 841.481 2 EA Removable bollard 1,250.00 $ 2,500.00 $ 1,550.00 $ 3,100.00 $ 1,250.00 $ 2,500.00 $ # Qty Unit Description Unit $ Total $ Unit $ Total $ 201.11 2 AC Clearing 7,000.00 $ 14,000.00 $ 29,000.00 $ 58,000.00 $ 203.20 1,780 CY Common Excavation 30.00 $ 53,400.00 $ 20.00 $ 35,600.00 $ 203.21 20 CY Rock Excavation 75.00 $ 1,500.00 $ 220.00 $ 4,400.00 $ 203.24 2,000 CY Commor Borrow 12.00 $ 24,000.00 $ 22.00 $ 44,000.00 $ 203.25 2,000 CY Granular Borrow 21.00 $ 42,000.00 $ 45.00 $ 90,000.00 $ 206.061 20 CY Earth Excavation - Drainage below grade 25.00 $ 500.00 $ 20.00 $ 400.00 $ 304.10 3,300 CY Aggregate Sub-Base Course 30.00 $ 99,000.00 $ 36.00 $ 118,800.00 $ 403.209 1,000 TON HMA 9.5 mm 106.00 $ 106,000.00 $ 96.00 $ 96,000.00 $ 502.325 50 CY Structural Concrete Pedestal/Footer 1,200.00 $ 60,000.00 $ 1,200.00 $ 60,000.00 $ 509.131 1 LS 25'-11" span X 8'-7" rise steel arch 96,000.00 $ 96,000.00 $ 147,000.00 $ 147,000.00 $ 603.159 20 LF 12" culvert pipe, Option III 42.00 $ 840.00 $ 50.00 $ 1,000.00 $ 603.179 40 LF 18" culvert pipe, Option III 48.00 $ 1,920.00 $ 55.00 $ 2,200.00 $ 603.219 175 LF 36" culvert pipe, Option III 90.00 $ 15,750.00 $ 123.00 $ 21,525.00 $ 605.09 1,000 LF 6" underdrain, Type B 16.50 $ 16,500.00 $ 15.00 $ 15,000.00 $ 605.10 25 LF Underdrain outlet 20.00 $ 500.00 $ 15.00 $ 375.00 $ 606.611 332 LF Timber Guardrail 23.00 $ 7,636.00 $ 26.00 $ 8,632.00 $ 607.16 5,600 LF 4' high vinyl coated chain link fence 16.00 $ 89,600.00 $ 18.00 $ 100,800.00 $ 608.26 16 SF Curb ramp detectable warning field 60.00 $ 960.00 $ 75.00 $ 1,200.00 $ 610.08 310 CY Riprap (D50=9") 50.00 $ 15,500.00 $ 113.00 $ 35,030.00 $ 610.16 60 CY Heavy riprap (D50=12") 120.00 $ 7,200.00 $ 175.00 $ 10,500.00 $ Peter's Construction Glidden Excavation Hebron ME Buxton ME Gorham ME Gorham ME Mechanic Falls ME Shaw Brothers Pratt & Sons J. Pratt Total 889,808.25 $ 920,195.40 $ 961,854.00 $ ---PAGE BREAK--- # Qty Unit Description Unit $ Total $ Unit $ Total $ 613.319 3,500 SY Erosion control blanket 2.00 $ 7,000.00 $ 2.00 $ 7,000.00 $ 615.07 1,300 CY Loam 45.00 $ 58,500.00 $ 50.00 $ 65,000.00 $ 618.1301 105 Unit Seeding method #1 - plan Qty 26.00 $ 2,730.00 $ 18.00 $ 1,890.00 $ 618.1401 32 Unit Seeding method #2 - plan Qty 21.00 $ 672.00 $ 18.00 $ 576.00 $ 619.1201 137 Unit Mulch - plan Qty 13.00 $ 1,781.00 $ 13.00 $ 1,781.00 $ 627.733 6,620 LF 4" white or yellow marking line 0.30 $ 1,986.00 $ 0.35 $ 2,317.00 $ 629.05 20 HR Hand labor, straight time 40.00 $ 800.00 $ 55.00 $ 1,100.00 $ 631.12 20 HR All purpose excavator w/operator 135.00 $ 2,700.00 $ 150.00 $ 3,000.00 $ 631.171 20 HR Truck - small w/operator 60.00 $ 1,200.00 $ 82.00 $ 1,640.00 $ 631.22 20 HR Smal front end loader w/operator 75.00 $ 1,500.00 $ 145.00 $ 2,900.00 $ 635.31 2,280 SF Pre-fabricated concrete block gravity wall 37.00 $ 84,360.00 $ 45.00 $ 102,600.00 $ 645.1 4 EA MUTCD signs 145.00 $ 580.00 $ 300.00 $ 1,200.00 $ 652.31 5 EA Type I barricade 100.00 $ 500.00 $ 20.00 $ 100.00 $ 652.312 4 EA Type II barricade 175.00 $ 700.00 $ 300.00 $ 1,200.00 $ 652.33 5 EA drum 55.00 $ 275.00 $ 40.00 $ 200.00 $ 652.34 10 EA cone 15.00 $ 150.00 $ 25.00 $ 250.00 $ 652.35 40 SF construction signs 10.00 $ 400.00 $ 15.00 $ 600.00 $ 652.361 1 LS Maintenance of traffic control devices 1,000.00 $ 1,000.00 $ 3,500.00 $ 3,500.00 $ 652.38 20 HR flaggers 18.00 $ 360.00 $ 21.00 $ 420.00 $ 656.75 1 LS Temp. erosion & water pollution control 19,700.00 $ 19,700.00 $ 19,000.00 $ 19,000.00 $ 659.10 1 LS Mobilization 137,715.00 $ 137,715.00 $ 115,000.00 $ 115,000.00 $ 802.162 8 EA adjust sewer manhole 875.00 $ 7,000.00 $ 700.00 $ 5,600.00 $ 841.481 2 EA Removable bollard 1,750.00 $ 3,500.00 $ 1,500.00 $ 3,000.00 $ Mechanic Falls ME Shaw Brothers Pratt & Sons Total 987,915.00 $ 1,190,336.00 $ Gorham ME