Full Text
May 2, 2014 Jepson Brook Sewer Separation Phase VI Bid No. 2014-023 Bid Date: 5/8/14 ADDENDUM NO 2 Please make the following changes to the Specifications: Questions: 1. Will snouts/CB hoods still be required now that the CB sump has been changed to 2ft.? If they are still required are they required on all pipe diameters? Catch Basin Hoods will still be required on all outlet pipes 15” or smaller. The two approved catch basin hoods are: Snout manufactured by Best Management Products PPF Catch Basin Hood manufactured by Plastic Pipe Fabrication END Department of Public Works • 103 Adams Ave • Lewiston, ME • 04240 • Voice Tel. [PHONE REDACTED] • Fax [PHONE REDACTED] • TTY/TDD [PHONE REDACTED] – www.lewistonmaine.gov Department of Public Works David A. Jones, P.E. Director