← Back to Lewiston

Document Lewiston_doc_323ab0c84e

Full Text

Item # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ 202.15 4 EA Remove manhole or catch basin 500.00 $ 2,000.00 $ 250.00 $ 1,000.00 $ 250.00 $ 1,000.00 $ 202.203 50 SY Pavement butt joints 35.00 $ 1,750.00 $ 12.00 $ 600.00 $ 21.00 $ 1,050.00 $ 203.20 780 CY Common excavation 12.00 $ 9,360.00 $ 25.00 $ 19,500.00 $ 15.00 $ 11,700.00 $ 304.10 820 CY Aggregate Sub-Base Course - Gravel 25.00 $ 20,500.00 $ 28.00 $ 22,960.00 $ 20.00 $ 16,400.00 $ 403.209 325 TN Hot Mix Asphalt 9.5mm (sidewalks, drives etc) 130.00 $ 42,250.00 $ 120.00 $ 39,000.00 $ 135.25 $ 43,956.25 $ 402.21 110 TN Hot Mix Asphalt 9.5mm Nominal Max. size 130.00 $ 14,300.00 $ 120.00 $ 13,200.00 $ 137.25 $ 15,097.50 $ 604.072 4 EA Catch Basin Type A1-C 2,850.00 $ 11,400.00 $ 2,200.00 $ 8,800.00 $ 2,500.00 $ 10,000.00 $ 604.161 3 EA Altering Catch Basin 600.00 $ 1,800.00 $ 900.00 $ 2,700.00 $ 1,030.00 $ 3,090.00 $ 604.18 5 EA Adjusting manhole or catch basin to grade 500.00 $ 2,500.00 $ 350.00 $ 1,750.00 $ 580.00 $ 2,900.00 $ 608.26 96 SF Curb ramp detectable warning field 65.00 $ 6,240.00 $ 57.00 $ 5,472.00 $ 62.00 $ 5,952.00 $ 609.11 2,320 LF Vertical Curb Type 1 26.00 $ 60,320.00 $ 26.00 $ 60,320.00 $ 30.00 $ 69,600.00 $ 609.12 40 LF Vertical Curb Type 1 - Circular 36.00 $ 1,440.00 $ 33.00 $ 1,320.00 $ 45.00 $ 1,800.00 $ 609.238 63 EA Terminal Curb Type 1 - 8' 250.00 $ 15,750.00 $ 230.00 $ 14,490.00 $ 275.00 $ 17,325.00 $ 609.2381 10 EA Terminal Curb Type 1 - 8' Circular 325.00 $ 3,250.00 $ 300.00 $ 3,000.00 $ 352.00 $ 3,520.00 $ 609.38 265 LF Reset Curb Type 1 20.00 $ 5,300.00 $ 13.00 $ 3,445.00 $ 25.00 $ 6,625.00 $ 615.07 100 CY Loam 35.00 $ 3,500.00 $ 40.00 $ 4,000.00 $ 45.00 $ 4,500.00 $ 618.1301 10 Unit Seeding method #1 - plan qty 55.00 $ 550.00 $ 30.00 $ 300.00 $ 50.00 $ 500.00 $ 619.1201 10 Unit Mulch - Plan qty 10.00 $ 100.00 $ 20.00 $ 200.00 $ 50.00 $ 500.00 $ 629.05 20 HR Hand labor, straight time 38.00 $ 760.00 $ 25.00 $ 500.00 $ 40.00 $ 800.00 $ 631.12 10 HR All purpose excavator (including operator) 135.00 $ 1,350.00 $ 100.00 $ 1,000.00 $ 90.00 $ 900.00 $ 631.171 10 HR Truck - small (including operator) 65.00 $ 650.00 $ 40.00 $ 400.00 $ 70.00 $ 700.00 $ 631.221 10 HR Smal front end loader (including operator) 100.00 $ 1,000.00 $ 65.00 $ 650.00 $ 85.00 $ 850.00 $ 652.33 25 EA Drum 110.00 $ 2,750.00 $ 50.00 $ 1,250.00 $ 50.00 $ 1,250.00 $ 652.34 150 EA Cone 20.00 $ 3,000.00 $ 10.00 $ 1,500.00 $ 20.00 $ 3,000.00 $ 652.35 350 SF Construction signs 8.00 $ 2,800.00 $ 5.00 $ 1,750.00 $ 17.00 $ 5,950.00 $ 652.361 60 CD Maintenance of Traffic Control Devices 65.00 $ 3,900.00 $ 10.00 $ 600.00 $ 60.00 $ 3,600.00 $ 652.38 600 HR Flaggers 21.00 $ 12,600.00 $ 15.00 $ 9,000.00 $ 16.50 $ 9,900.00 $ 656.75 1 LS Temp. Soil erosion & water pollution control 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 3,500.25 $ 3,500.25 $ 659.10 1 LS Mobilization 8,000.00 $ 8,000.00 $ 29,275.00 $ 29,275.00 $ 27,300.00 $ 27,300.00 $ City of Lewiston, Maine East Avenue Sidewalk Improvemetns Bid 2012-024 Bid Date: August 17, 2012 Off Road Construction St. Laurent & Son Doten's Total all items 240,120.00 $ 248,482.00 $ 273,266.00 $ ---PAGE BREAK--- Item # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ 202.15 4 EA Remove manhole or catch basin 225.00 $ 900.00 $ - $ 750.00 $ 3,000.00 $ 202.203 50 SY Pavement butt joints 15.00 $ 750.00 $ - $ 18.00 $ 900.00 $ 203.20 780 CY Common excavation 24.00 $ 18,720.00 $ - $ 12.00 $ 9,360.00 $ 304.10 820 CY Aggregate Sub-Base Course - Gravel 38.00 $ 31,160.00 $ - $ 22.00 $ 18,040.00 $ 403.209 325 TN Hot Mix Asphalt 9.5mm (sidewalks, drives etc) 130.00 $ 42,250.00 $ - $ 135.00 $ 43,875.00 $ 402.21 110 TN Hot Mix Asphalt 9.5mm Nominal Max. size 130.00 $ 14,300.00 $ - $ 135.00 $ 14,850.00 $ 604.072 4 EA Catch Basin Type A1-C 2,700.00 $ 10,800.00 $ - $ 5,500.00 $ 22,000.00 $ 604.161 3 EA Altering Catch Basin 2,500.00 $ 7,500.00 $ - $ 1,250.00 $ 3,750.00 $ 604.18 5 EA Adjusting manhole or catch basin to grade 850.00 $ 4,250.00 $ - $ 650.00 $ 3,250.00 $ 608.26 96 SF Curb ramp detectable warning field 74.00 $ 7,104.00 $ - $ 65.00 $ 6,240.00 $ 609.11 2,320 LF Vertical Curb Type 1 27.00 $ 62,640.00 $ - $ 35.00 $ 81,200.00 $ 609.12 40 LF Vertical Curb Type 1 - Circular 42.00 $ 1,680.00 $ - $ 45.00 $ 1,800.00 $ 609.238 63 EA Terminal Curb Type 1 - 8' 250.00 $ 15,750.00 $ - $ 275.00 $ 17,325.00 $ 609.2381 10 EA Terminal Curb Type 1 - 8' Circular 350.00 $ 3,500.00 $ - $ 375.00 $ 3,750.00 $ 609.38 265 LF Reset Curb Type 1 17.00 $ 4,505.00 $ - $ 25.00 $ 6,625.00 $ 615.07 100 CY Loam 60.00 $ 6,000.00 $ - $ 50.00 $ 5,000.00 $ 618.1301 10 Unit Seeding method #1 - plan qty 30.00 $ 300.00 $ - $ 200.00 $ 2,000.00 $ 619.1201 10 Unit Mulch - Plan qty 20.00 $ 200.00 $ - $ 200.00 $ 2,000.00 $ 629.05 20 HR Hand labor, straight time 50.00 $ 1,000.00 $ - $ 40.00 $ 800.00 $ 631.12 10 HR All purpose excavator (including operator) 130.00 $ 1,300.00 $ - $ 95.00 $ 950.00 $ 631.171 10 HR Truck - small (including operator) 80.00 $ 800.00 $ - $ 75.00 $ 750.00 $ 631.221 10 HR Smal front end loader (including operator) 105.00 $ 1,050.00 $ - $ 85.00 $ 850.00 $ 652.33 25 EA Drum 70.00 $ 1,750.00 $ - $ 40.00 $ 1,000.00 $ 652.34 150 EA Cone 18.00 $ 2,700.00 $ - $ 10.00 $ 1,500.00 $ 652.35 350 SF Construction signs 12.00 $ 4,200.00 $ - $ 12.00 $ 4,200.00 $ 652.361 60 CD Maintenance of Traffic Control Devices 45.00 $ 2,700.00 $ - $ 150.00 $ 9,000.00 $ 652.38 600 HR Flaggers 15.00 $ 9,000.00 $ - $ 25.00 $ 15,000.00 $ 656.75 1 LS Temp. Soil erosion & water pollution control 3,000.00 $ 3,000.00 $ - $ 2,500.00 $ 2,500.00 $ 659.10 1 LS Mobilization 25,000.00 $ 25,000.00 $ - $ 35,000.00 $ 35,000.00 $ * Gendron & Gendron - did not use the revised Proposal Form Pratt & Sons Gendron & Gendron Glidden Total all items 284,809.00 $ * $299,999.99 316,515.00 $