Base Bid: Oak Street Item # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 17 EA remove manhole or catch basin 300.00 $ 5,100.00 $ 750.00 $ 12,750.00 $ 335.00 $ 5,695.00 $ 500.00 $ 8,500.00 $ 2 800 CY select backfill 8.00 $ 6,400.00 $ 25.00 $ 20,000.00 $ 16.00 $ 12,800.00 $ 10.00 $ 8,000.00 $ 3 10 EA test pit excavation 400.00 $ 4,000.00 $ 1,050.00 $ 10,500.00 $ 375.00 $ 3,750.00 $ 200.00 $ 2,000.00 $ 4 25 CY structural rock excavation 100.00 $ 2,500.00 $ 400.00 $ 10,000.00 $ 102.00 $ 2,550.00 $ 300.00 $ 7,500.00 $ 5 50 CY extra structural excavation 35.00 $ 1,750.00 $ 30.00 $ 1,500.00 $ 25.00 $ 1,250.00 $ 30.00 $ 1,500.00 $ 6 1,000 CY aggregate base crushed 19.00 $ 19,000.00 $ 24.50 $ 24,500.00 $ 22.00 $ 22,000.00 $ 25.00 $ 25,000.00 $ 7 2,000 CY aggregate sub-base gravel 18.00 $ 36,000.00 $ 22.00 $ 44,000.00 $ 20.00 $ 40,000.00 $ 20.00 $ 40,000.00 $ 8 6,400 SY fine grade/prep areas for paving 4.00 $ 25,600.00 $ 4.00 $ 25,600.00 $ 6.00 $ 38,400.00 $ 2.00 $ 12,800.00 $ 9 950 TON hot mix asphalt, 19.0mm 85.00 $ 80,750.00 $ 83.50 $ 79,325.00 $ 82.00 $ 77,900.00 $ 88.00 $ 83,600.00 $ 10 550 TON hot mix asphalt, 9.5mm 94.50 $ 51,975.00 $ 98.50 $ 54,175.00 $ 95.50 $ 52,525.00 $ 95.00 $ 52,250.00 $ 11 200 TON hot mix asphalt, hand placed 125.00 $ 25,000.00 $ 125.00 $ 25,000.00 $ 160.00 $ 32,000.00 $ 130.00 $ 26,000.00 $ 12 100 LF 6" dia. Storm drain/6" storm service 55.00 $ 5,500.00 $ 40.00 $ 4,000.00 $ 70.00 $ 7,000.00 $ 100.00 $ 10,000.00 $ 13 150 LF 6" dia. Sewer/ 6" sewer service 55.00 $ 8,250.00 $ 42.00 $ 6,300.00 $ 160.00 $ 24,000.00 $ 100.00 $ 15,000.00 $ 14 289 LF 8" dia. storm drain 57.00 $ 16,473.00 $ 55.00 $ 15,895.00 $ 85.00 $ 24,565.00 $ 75.00 $ 21,675.00 $ 15 174 LF 12" dia. storm drain 48.00 $ 8,352.00 $ 58.50 $ 10,179.00 $ 92.75 $ 16,138.50 $ 125.00 $ 21,750.00 $ 16 79 LF 12" dia. Sewer 52.00 $ 4,108.00 $ 78.50 $ 6,201.50 $ 86.10 $ 6,801.90 $ 125.00 $ 9,875.00 $ 17 34 LF 15" dia. Storm drain 55.00 $ 1,870.00 $ 78.50 $ 2,669.00 $ 82.00 $ 2,788.00 $ 100.00 $ 3,400.00 $ 18 250 LF 15" dia. Sewer 55.00 $ 13,750.00 $ 74.00 $ 18,500.00 $ 65.00 $ 16,250.00 $ 125.00 $ 31,250.00 $ 19 29 LF 21" dia. Storm drain 85.00 $ 2,465.00 $ 128.50 $ 3,726.50 $ 170.00 $ 4,930.00 $ 300.00 $ 8,700.00 $ 20 288 LF 24" dia. Storm drain 95.00 $ 27,360.00 $ 98.50 $ 28,368.00 $ 80.00 $ 23,040.00 $ 400.00 $ 115,200.00 $ 21 906 LF 24" dia. Sewer 95.00 $ 86,070.00 $ 108.50 $ 98,301.00 $ 150.00 $ 135,900.00 $ 300.00 $ 271,800.00 $ 22 358 LF 30" dia. Storm drain 190.00 $ 68,020.00 $ 130.00 $ 46,540.00 $ 154.00 $ 55,132.00 $ 375.00 $ 134,250.00 $ 23 678 LF 30" dia. Sewer 180.00 $ 122,040.00 $ 142.00 $ 96,276.00 $ 180.00 $ 122,040.00 $ 375.00 $ 254,250.00 $ 24 516 LF 36" dia. Storm drain 200.00 $ 103,200.00 $ 260.00 $ 134,160.00 $ 230.00 $ 118,680.00 $ 450.00 $ 232,200.00 $ 25 653 LF 42" dia. Storm drain 300.00 $ 195,900.00 $ 275.00 $ 179,575.00 $ 238.00 $ 155,414.00 $ 450.00 $ 293,850.00 $ 26 11 EA 4' dia. Catch basin 2,500.00 $ 27,500.00 $ 3,350.00 $ 36,850.00 $ 3,151.00 $ 34,661.00 $ 2,950.00 $ 32,450.00 $ 27 13 EA 4' dia. Sewer manhole 4,500.00 $ 58,500.00 $ 5,500.00 $ 71,500.00 $ 4,000.00 $ 52,000.00 $ 9,500.00 $ 123,500.00 $ 28 5 EA 5' dia. Storm drain manhole 8,000.00 $ 40,000.00 $ 11,000.00 $ 55,000.00 $ 8,950.00 $ 44,750.00 $ 15,000.00 $ 75,000.00 $ 29 2 EA 5' dia. Sewer manhole 8,000.00 $ 16,000.00 $ 11,000.00 $ 22,000.00 $ 7,220.00 $ 14,440.00 $ 15,000.00 $ 30,000.00 $ 30 4 EA 6' dia. Storm drain manhole 11,000.00 $ 44,000.00 $ 22,000.00 $ 88,000.00 $ 9,530.00 $ 38,120.00 $ 25,000.00 $ 100,000.00 $ 31 1 EA convert catch basin to manhole 475.00 $ 475.00 $ 1,300.00 $ 1,300.00 $ 851.00 $ 851.00 $ 500.00 $ 500.00 $ 32 1 EA relocate 6" water line 3,000.00 $ 3,000.00 $ 3,750.00 $ 3,750.00 $ 4,475.00 $ 4,475.00 $ 2,500.00 $ 2,500.00 $ 33 3 EA relocate 8" water line 3,000.00 $ 9,000.00 $ 3,250.00 $ 9,750.00 $ 3,680.00 $ 11,040.00 $ 3,000.00 $ 9,000.00 $ 34 4 EA alter catch basin grate to cascade 300.00 $ 1,200.00 $ 800.00 $ 3,200.00 $ 770.00 $ 3,080.00 $ 500.00 $ 2,000.00 $ 35 1,500 EA remove & reset existing curb 17.00 $ 25,500.00 $ 14.00 $ 21,000.00 $ 16.00 $ 24,000.00 $ 30.00 $ 45,000.00 $ 36 8 LF F&I granite tipdown 225.00 $ 1,800.00 $ 210.00 $ 1,680.00 $ 220.00 $ 1,760.00 $ 300.00 $ 2,400.00 $ 37 50 SY F&I new granite curb 29.00 $ 1,450.00 $ 26.50 $ 1,325.00 $ 29.45 $ 1,472.50 $ 40.00 $ 2,000.00 $ 38 50 HR loam, seed & mulch 8.00 $ 400.00 $ 8.50 $ 425.00 $ 56.30 $ 2,815.00 $ 4.00 $ 200.00 $ 39 60 HR hand labor straight time 40.00 $ 2,400.00 $ 40.00 $ 2,400.00 $ 35.00 $ 2,100.00 $ 30.00 $ 1,800.00 $ 40 20 HR front end loader w/operator 80.00 $ 1,600.00 $ 115.00 $ 2,300.00 $ 95.00 $ 1,900.00 $ 100.00 $ 2,000.00 $ City of Lewiston, Maine Oak Street Sewer Separation Phase IV Bid 2013-003 Bid Date: March 28, 2013 Lewiston ME Gendron & Gendron Lewiston ME Longchamps & Sons Turner ME Lisbon ME St. Laurent & Son K & K Excavation ---PAGE BREAK--- City of Lewiston, Maine Oak Street Sewer Separation Phase IV Bid 2013-003 Bid Date: March 28, 2013 Base Bid: Oak Street Item # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 41 20 HR all purpose excavator w/operator 80.00 $ 1,600.00 $ 160.00 $ 3,200.00 $ 125.00 $ 2,500.00 $ 125.00 $ 2,500.00 $ 42 20 HR truck, small w/operator 50.00 $ 1,000.00 $ 65.00 $ 1,300.00 $ 55.00 $ 1,100.00 $ 75.00 $ 1,500.00 $ 43 1 LS traffic control 1.00 $ 1.00 $ 13,500.00 $ 13,500.00 $ 82,500.00 $ 82,500.00 $ 25,000.00 $ 25,000.00 $ 44 200 HR flaggers 17.00 $ 3,400.00 $ 22.00 $ 4,400.00 $ 17.00 $ 3,400.00 $ 20.00 $ 4,000.00 $ 45 1 LS bypass pumping/sewage flow control 15,000.00 $ 15,000.00 $ 31,000.00 $ 31,000.00 $ 83,650.00 $ 83,650.00 $ 125,000.00 $ 125,000.00 $ 46 1 LS mobilization, misc. & clean up 104,000.00 $ 104,000.00 $ 198,500.00 $ 198,500.00 $ 143,391.65 $ 143,391.65 $ 100,000.00 $ 100,000.00 $ Item Alternate Bid: Side Streets # Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 7 EA removal manhole or catch basin 300.00 $ 2,100.00 $ 600.00 $ 4,200.00 $ 335.00 $ 2,345.00 $ 500.00 $ 3,500.00 $ 2 200 CY select backfill 8.00 $ 1,600.00 $ 25.00 $ 5,000.00 $ 16.00 $ 3,200.00 $ 10.00 $ 2,000.00 $ 3 5 EA test pit excavation 400.00 $ 2,000.00 $ 900.00 $ 4,500.00 $ 375.00 $ 1,875.00 $ 200.00 $ 1,000.00 $ 4 160 CY aggregate base crushed 20.00 $ 3,200.00 $ 28.50 $ 4,560.00 $ 22.00 $ 3,520.00 $ 20.00 $ 3,200.00 $ 5 300 CY aggregate sub-base gravel 18.00 $ 5,400.00 $ 26.50 $ 7,950.00 $ 18.70 $ 5,610.00 $ 19.00 $ 5,700.00 $ 6 1,800 SY fine grade/prep areas for paving 5.00 $ 9,000.00 $ 8.00 $ 14,400.00 $ 5.85 $ 10,530.00 $ 4.00 $ 7,200.00 $ 7 300 TON hot mix asphalt, 19.0mm 91.50 $ 27,450.00 $ 92.50 $ 27,750.00 $ 85.00 $ 25,500.00 $ 92.00 $ 27,600.00 $ 8 200 TON hot mix asphalt, 9.5mm 105.00 $ 21,000.00 $ 102.00 $ 20,400.00 $ 94.00 $ 18,800.00 $ 108.00 $ 21,600.00 $ 9 100 TON hot mix asphalt, hand placed 125.00 $ 12,500.00 $ 125.00 $ 12,500.00 $ 160.00 $ 16,000.00 $ 165.00 $ 16,500.00 $ 10 50 LF 6" dia. Storm drain/6" storm service 85.00 $ 4,250.00 $ 40.00 $ 2,000.00 $ 67.00 $ 3,350.00 $ 100.00 $ 5,000.00 $ 11 100 LF 6" dia. Sewer/ 6" sewer service 85.00 $ 8,500.00 $ 42.00 $ 4,200.00 $ 160.00 $ 16,000.00 $ 100.00 $ 10,000.00 $ 12 332 LF 8" dia. storm drain 57.00 $ 18,924.00 $ 48.50 $ 16,102.00 $ 85.00 $ 28,220.00 $ 75.00 $ 24,900.00 $ 13 543 LF 12" dia. storm drain 48.00 $ 26,064.00 $ 56.50 $ 30,679.50 $ 93.00 $ 50,499.00 $ 125.00 $ 67,875.00 $ 14 379 LF 15" dia. Storm drain 51.00 $ 19,329.00 $ 62.50 $ 23,687.50 $ 82.00 $ 31,078.00 $ 125.00 $ 47,375.00 $ 15 38 LF 24" dia. Storm drain 100.00 $ 3,800.00 $ 98.50 $ 3,743.00 $ 152.00 $ 5,776.00 $ 400.00 $ 15,200.00 $ 16 7 EA 4' dia. Catch basin 3,500.00 $ 24,500.00 $ 3,500.00 $ 24,500.00 $ 3,150.00 $ 22,050.00 $ 4,000.00 $ 28,000.00 $ 17 3 EA 4' dia. Storm drain manhole 3,800.00 $ 11,400.00 $ 3,000.00 $ 9,000.00 $ 4,080.00 $ 12,240.00 $ 4,000.00 $ 12,000.00 $ 18 7 EA F&I granite tipdown 225.00 $ 1,575.00 $ 210.00 $ 1,470.00 $ 221.00 $ 1,547.00 $ 300.00 $ 2,100.00 $ 19 50 LF F&I new granite curb 28.00 $ 1,400.00 $ 26.50 $ 1,325.00 $ 27.00 $ 1,350.00 $ 40.00 $ 2,000.00 $ 20 50 SY loam, seed & mulch 5.00 $ 250.00 $ 8.50 $ 425.00 $ 56.00 $ 2,800.00 $ 10.00 $ 500.00 $ 21 20 HR hand labor straight time 30.00 $ 600.00 $ 40.00 $ 800.00 $ 35.00 $ 700.00 $ 40.00 $ 800.00 $ 22 10 HR front end loader w/operator 80.00 $ 800.00 $ 115.00 $ 1,150.00 $ 95.00 $ 950.00 $ 100.00 $ 1,000.00 $ 23 10 HR all purpose excavator w/operator 80.00 $ 800.00 $ 165.00 $ 1,650.00 $ 125.00 $ 1,250.00 $ 135.00 $ 1,350.00 $ 24 10 HR truck, small w/operator 40.00 $ 400.00 $ 65.00 $ 650.00 $ 55.00 $ 550.00 $ 65.00 $ 650.00 $ 25 1 LS traffic control 10,000.00 $ 10,000.00 $ 6,650.00 $ 6,650.00 $ 74,782.22 $ 74,782.22 $ 25,000.00 $ 25,000.00 $ 26 100 HR flaggers 18.00 $ 1,800.00 $ 22.00 $ 2,200.00 $ 17.00 $ 1,700.00 $ 20.00 $ 2,000.00 $ Lewiston ME Turner ME Lewiston ME Lisbon ME St. Laurent & Son K & K Excavation Gendron & Gendron Longchamps & Sons 334,050.00 $ Total all items 218,642.00 $ 231,492.00 $ 342,222.22 $ 2,376,700.00 $ Longchamps & Sons Lisbon ME Total all items St. Laurent & Son K & K Excavation Gendron & Gendron Lewiston ME Turner ME Lewiston ME 1,279,259.00 $ 1,530,421.00 $ 1,555,555.55 $