← Back to Lewiston

Document Lewiston_doc_0deee054a3

Full Text

# Qty Unit Description Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ Unit $ Total $ 1 8 EA Remove manhole or catchbasin 615.00 4,920.00 $ 480.00 3,840.00 1,500.00 12,000.00 750.00 6,000.00 500.00 4,000.00 350.00 2,800.00 2 200 CY Granular borrow 20.00 4,000.00 17.00 3,400.00 0.01 2.00 20.00 4,000.00 30.00 6,000.00 26.00 5,200.00 3 5 EA Test Pit excavation 335.00 1,675.00 315.00 1,575.00 1,400.00 7,000.00 1,000.00 5,000.00 500.00 2,500.00 2,000.00 10,000.00 4 50 CY Structural Earth Ex, drainage & minor 45.00 2,250.00 20.00 1,000.00 94.00 4,700.00 30.00 1,500.00 57.00 2,850.00 56.00 2,800.00 structures "Overdepth" 5 500 CY Structural rock excavation 500.00 250,000.00 550.00 275,000.00 500.00 250,000.00 425.00 212,500.00 400.00 200,000.00 500.00 250,000.00 6 450 CY Aggregate Base crushed 20.00 9,000.00 18.50 8,325.00 0.01 4.50 35.00 15,750.00 19.00 8,550.00 30.00 13,500.00 7 900 CY Aggregate Sub-base gravel 19.00 17,100.00 15.20 13,680.00 0.01 9.00 28.00 25,200.00 15.00 13,500.00 26.00 23,400.00 8 2,500 SY Fine grade/prep areas for paving 7.60 19,000.00 6.00 15,000.00 2.00 5,000.00 3.00 7,500.00 5.33 13,325.00 4.60 11,500.00 9 300 TN Hot Mix Asphalt, 19.0 mm 91.00 27,300.00 90.35 27,105.00 90.00 27,000.00 116.00 34,800.00 100.00 30,000.00 120.00 36,000.00 10 160 TN Hot Mix Asphalt, 12.5 mm 91.00 14,560.00 102.75 16,440.00 103.00 16,480.00 130.00 20,800.00 100.00 16,000.00 120.00 19,200.00 11 50 TN Hot Mix Asphalt, hand placed 165.00 8,250.00 125.00 6,250.00 125.00 6,250.00 160.00 8,000.00 150.00 7,500.00 140.00 7,000.00 12 105 LF 8" dia. HDPE storm drain 55.00 5,775.00 37.00 3,885.00 260.00 27,300.00 118.00 12,390.00 53.00 5,565.00 80.00 8,400.00 13 180 LF 12" dia. HDPE storm drain 62.00 11,160.00 46.00 8,280.00 200.00 36,000.00 120.00 21,600.00 53.00 9,540.00 70.00 12,600.00 14 295 LF 15" dia. HDPE underdrain 65.00 19,175.00 48.00 14,160.00 150.00 44,250.00 123.00 36,285.00 53.00 15,635.00 70.00 20,650.00 15 45 LF 18" dia. HDPE storm drain 210.00 9,450.00 108.50 4,882.50 200.00 9,000.00 252.00 11,340.00 93.00 4,185.00 150.00 6,750.00 16 50 LF 15" dia. PVC Sewer 90.00 4,500.00 39.50 1,975.00 200.00 10,000.00 165.00 8,250.00 103.00 5,150.00 80.00 4,000.00 17 300 LF 18" dia. PVC Sewer 100.00 30,000.00 74.00 22,200.00 200.00 60,000.00 170.00 51,000.00 83.00 24,900.00 110.00 33,000.00 18 48 LF 42" dia. Class IV RCP storm drain 250.00 12,000.00 322.00 15,456.00 400.00 19,200.00 440.00 21,120.00 520.83 24,999.84 800.00 38,400.00 19 420 EA 48" dia. Class IV RCP storm drain 290.00 121,800.00 330.00 138,600.00 400.00 168,000.00 480.00 201,600.00 671.23 281,916.60 600.00 252,000.00 20 7 EA 4' dia. Catch basin 3,200.00 22,400.00 2,330.00 16,310.00 5,000.00 35,000.00 4,650.00 32,550.00 4,600.00 32,200.00 2,200.00 15,400.00 21 1 EA 4' dia. Doghouse Type sewer manhole 3,900.00 3,900.00 4,380.00 4,380.00 5,000.00 5,000.00 8,500.00 8,500.00 5,300.00 5,300.00 2,600.00 2,600.00 22 2 EA 8' dia. Manhole 7,500.00 15,000.00 9,375.00 18,750.00 22,000.00 44,000.00 15,000.00 30,000.00 21,200.00 42,400.00 24,000.00 48,000.00 23 4 EA 48"X48" RCP TEE base manhole 8,100.00 32,400.00 7,700.00 30,800.00 10,000.00 40,000.00 15,000.00 60,000.00 9,807.50 39,230.00 17,000.00 68,000.00 24 1 EA 42"X42" RCP TEE base manhole 8,500.00 8,500.00 7,490.00 7,490.00 10,000.00 10,000.00 15,000.00 15,000.00 9,549.00 9,549.00 17,000.00 17,000.00 25 50 LF Relocate existing sewer service 75.00 3,750.00 54.50 2,725.00 220.00 11,000.00 110.00 5,500.00 53.00 2,650.00 200.00 10,000.00 26 50 LF 6" PVC Roof drain service 76.00 3,800.00 57.00 2,850.00 52.00 2,600.00 110.00 5,500.00 53.00 2,650.00 100.00 5,000.00 27 500 LF Remove & reset existing curb 16.00 8,000.00 15.75 7,875.00 11.00 5,500.00 40.00 20,000.00 15.00 7,500.00 20.00 10,000.00 28 100 LF F&I new granite curb 28.00 2,800.00 29.60 2,960.00 30.00 3,000.00 50.00 5,000.00 30.00 3,000.00 35.00 3,500.00 29 16 EA F&I new granite tipdown 240.00 3,840.00 300.00 4,800.00 135.00 2,160.00 300.00 4,800.00 253.00 4,048.00 300.00 4,800.00 30 25 SY Loam, Seed & Mulch 16.50 412.50 15.00 375.00 43.00 1,075.00 7.50 187.50 50.00 1,250.00 10.00 250.00 31 80 HR Hand labor straight time 40.00 3,200.00 35.00 2,800.00 40.00 3,200.00 45.00 3,600.00 33.00 2,640.00 35.00 2,800.00 32 20 HR Foreman 55.00 1,100.00 45.00 900.00 45.00 900.00 55.00 1,100.00 43.00 860.00 45.00 900.00 33 10 HR Air tool & compressor w/operator 125.00 1,250.00 50.00 500.00 40.00 400.00 65.00 650.00 83.00 830.00 70.00 700.00 34 20 HR All purpose excavator w/operator 165.00 3,300.00 90.00 1,800.00 100.00 2,000.00 150.00 3,000.00 125.00 2,500.00 130.00 2,600.00 35 20 HR Truck, small, w/operator 60.00 1,200.00 45.00 900.00 50.00 1,000.00 60.00 1,200.00 63.00 1,260.00 60.00 1,200.00 36 10 HR Front End Loader w/operator 75.00 750.00 85.00 850.00 100.00 1,000.00 95.00 950.00 85.00 850.00 100.00 1,000.00 37 1 LS Traffic control 55,000.00 55,000.00 3,500.00 3,500.00 33,800.50 33,800.50 25,000.00 25,000.00 47,000.00 47,000.00 50,000.00 50,000.00 38 300 HR Flaggers 18.00 5,400.00 18.00 5,400.00 20.00 6,000.00 28.50 8,550.00 16.00 4,800.00 25.00 7,500.00 39 1 LS Miscellaneous work 90,000.00 90,000.00 170,000.00 170,000.00 22,000.00 22,000.00 45,000.00 45,000.00 128,000.00 128,000.00 80,000.00 80,000.00 40 1 LS Mobilization & Clean up 58,637.49 58,637.49 99,000.00 99,000.00 90,000.00 90,000.00 25,000.00 25,000.00 81,000.00 81,000.00 144,650.00 144,650.00 TOTAL PART 1 1,095,633.44 $ Wayne ME Auburn ME D&C Construction Oak Street Separation Phase III Lewiston ME 896,554.99 $ 966,018.50 $ Lisbon ME Longchamps & Sons Rockland MA Bid 2012-005 1,021,831.00 $ 1,005,722.50 $ C H Stevenson St. Laurent & Son T-Buck Construction PART 1 Gendron & Gendron Lewiston ME 1,233,100.00 $ ---PAGE BREAK--- Wayne ME Auburn ME D&C Construction Lewiston ME Lisbon ME Longchamps & Sons Rockland MA Bid 2012-005 C H Stevenson St. Laurent & Son T-Buck Construction Gendron & Gendron Lewiston ME 1 200 LF Install 4" DI water main 98.00 19,600.00 $ 36.00 7,200.00 93.00 18,600.00 109.00 21,800.00 41.00 8,200.00 80.00 16,000.00 2 620 LF Install 8" DI water main 93.00 57,660.00 39.00 24,180.00 92.00 57,040.00 90.00 55,800.00 41.00 25,420.00 70.00 43,400.00 3 1 EA Install hydrant, gate valve & 6" hydrant lead 3,920.00 3,920.00 1,680.00 1,680.00 5,000.00 5,000.00 3,000.00 3,000.00 1,500.00 1,500.00 3,900.00 3,900.00 4 1 EA Install 20"X8" Tapping sleeve & gate valve 2,640.00 2,640.00 6,100.00 6,100.00 5,000.00 5,000.00 7,500.00 7,500.00 2,000.00 2,000.00 2,800.00 2,800.00 5 19 EA Install 3/4" water service 1,500.00 28,500.00 1,300.00 24,700.00 2,500.00 47,500.00 2,100.00 39,900.00 1,100.00 20,900.00 1,200.00 22,800.00 6 165 CY Aggregate Base crushed 20.00 3,300.00 18.70 3,085.50 0.01 1.65 35.00 5,775.00 19.00 3,135.00 30.00 4,950.00 7 335 CY Aggregate Sub-base gravel 19.00 6,365.00 15.25 5,108.75 0.01 3.35 28.00 9,380.00 15.00 5,025.00 26.00 8,710.00 8 1,000 SY Fine grade/prep areas for paving 7.60 7,600.00 6.00 6,000.00 2.00 2,000.00 3.00 3,000.00 5.33 5,330.00 6.00 6,000.00 9 150 TN Hot Mix Asphalt, 19.0 mm 91.00 13,650.00 90.35 13,552.50 90.00 13,500.00 116.00 17,400.00 100.00 15,000.00 120.00 18,000.00 10 85 TN Hot Mix Asphalt, 12.5 mm 91.00 7,735.00 102.75 8,733.75 103.00 8,755.00 130.00 11,050.00 100.00 8,500.00 120.00 10,200.00 11 15 TN Hot Mix Asphalt, 9.5 mm hand placed 165.00 2,475.00 125.00 1,875.00 130.00 1,950.00 160.00 2,400.00 150.00 2,250.00 140.00 2,100.00 TOTAL PART 2 97,260.00 $ TOTAL PART 1 & PART 2 138,860.00 $ 1,371,960.00 $ 1,182,727.50 $ 1,192,893.44 $ 1,049,999.99 $ 1,068,234.00 $ 1,181,181.00 $ PART 2 153,445.00 $ 102,215.50 $ 159,350.00 $ 177,005.00 $