February 20, 2013 Walnut Street Rehabilitation and Sidewalk Improvements Bid No. 2013-002 Bid Date: 3/5/13 ADDENDUM NO. 1 Please make the following changes to the Specifications: 1. The pay unit for Item No. 615.07 - Loam should be changed to CY. 2. The concrete used for curb installation shall have an aggregate size of three (3/8) inch, and shall have an ultimate compressive strength between 1,000 psi and 1,500 psi as determined by ASTM D 4832. Slump shall be between 8 and 10 inches. 3. Installation of catch basins shall include connecting to the existing lead pipe and connecting any other existing underdrain/storm drain pipes into the new catch basin. This shall include any pipe materials required and flexible couplings. Prior to ordering the catch basins, the Contractor shall determine the size, material, quantity and depth of any existing pipes and order the new catch basin accordingly. Clarification: 4. Removing pavement surface on the side streets is included as part of Bid Item 202.203 – Pavement Butt Joints. Removing pavement surface for Walnut Street is included as part of Bid Item 202.202 – Removing Pavement Surface END Department of Public Works • 103 Adams Ave • Lewiston, ME • 04240 • Voice Tel. [PHONE REDACTED] • Fax [PHONE REDACTED] • TTY/TDD [PHONE REDACTED] – www.ci.lewiston.me.us Department of Public Works David A. Jones, P.E. Director ---PAGE BREAK--- 1 Date: 2/19/13 Walnut St. Rehabilitation & Sidewalk Improvements, Bid. #2013-002 Mandatory Pre-Bid Meeting Time & Location: Lewiston Public Works, 10:00 AM Name Title Company Tel. FAX E-Mail Justin Early Project Engineer Lewiston 513-3003 784-5647 [EMAIL REDACTED] Norm Beauparlant Dir. Budget/Purch. Lewiston 513-3040 784-2959 [EMAIL REDACTED] Richard Burnham City Engineer Lewiston 513-3003 784-5647 [EMAIL REDACTED] Rob Owens Project Mgr. Peters Const. 929-8912 929-8916 [EMAIL REDACTED] Tom Linindoll Estimator/PM K&K Excav. 225-3030 225-3027 [EMAIL REDACTED] Larry Morin Estimator/PM Pike 854-2561 854-2539 [EMAIL REDACTED] Gary St. Laurent President St. Laurent 784-7944 784-6592 [EMAIL REDACTED] Denise Longchamps Office Mgr. Longchamps 353-2349 353-5814 [EMAIL REDACTED] Diane Laliberte Secretary Gendron 782-7372 782-7308 [EMAIL REDACTED] Paul Parks Project Mgr. Dotens Const. 865-4412 865-6373 [EMAIL REDACTED] Dan Klemanski Paving foreman White Bros. 890-1141 [EMAIL REDACTED] Greg Washburn President Washburn 345-4671 345-3671 Washburn&[EMAIL REDACTED] Brett Plossay Engineer CPM Constr. 865-0000 865-4836 [EMAIL REDACTED] Jamie Ward Estimator/sales All State Asph. 440-3915 894-5182 [EMAIL REDACTED] Justin Hagar VP Hagar Enterp. 563-8588 563-8468 [EMAIL REDACTED] Adam Lake Project Mgr. C.H. Stevenson 685-3600 685-3711 [EMAIL REDACTED] Raymond Poirier Project Mgr. L.P. Poirier 782-3617 777-3911 [EMAIL REDACTED] Andrew Ward Foreman Pratt & Sons 345-3311 345-3313 [EMAIL REDACTED] Steve Piela Project Mgr. Glidden Excav. 856-9990 856-9998 [EMAIL REDACTED] Lauren Shaw Admin. Asst. Lewiston 513-3003 784-5647 [EMAIL REDACTED] Project Engineer: Justin Early 1. Introductions 2. Overall scope This is a Community Development Block Grant (CDBG) project, so Davis Bacon wage rates (included in the specs) must be adhered to with certified payrolls submitted to Project Engineer with each bill (not through Elations). The project is on Walnut St. beginning at Bates St. and ending at Horton St. and will include sidewalks, parking, and street-scaping. The “bulb-outs” will have a ten-foot (10’) radius. The City has these in stock at its Operations Center – contractor responsible to pick up and to trim down the ends as needed for each tip down. The project is mill and shim, with the chance at some peel near Bates. Tree planting is also included in the specifications. If PW Highway crews are available, they may complete this work, so it may be pulled from the contract. There will be five feet of green space on the north side of the project. ---PAGE BREAK--- 2 Concrete must be between 1000-1500 psi. Cast iron detectables (ramps) will be placed in concrete, not asphalt. Item #615.07 - Loam on the bid schedule should read Cubic Yards (CY) rather than Square Yards (SY). There is a 50’ right of way in the project. A ten foot (10’) travel lane will be placed in each direction out from the centerline. There are some variances due to buildings where the difference will need to be made up on the sidewalks. There is to be a six foot sidewalk on the north. Four concrete pads will be placed in the green space for benches and trash receptacles (items included in another contract). The “bulb-outs” are asphalt. Work is to be done during the day. There is a high point at Blake St. and catch basins are to be installed at the low points of each bulb out as shown on the drawings. Drainage at the curb line will need to be accounted for to ensure that the bulb out drains and no ponding water is created. Reveal will be lost on “bulb-outs” as go up the cross slope of the street. May use doghouse structures where appropriate. There needs to be three feet between back of ramp and buildings, so some “bulb-outs” will stick out more and have to come back to meet the curb. The Removing Pavement Surface bid item does not include the side streets. Removing pavement on the side-streets is included in the Pavement Butt Joints bid item. It was incorrectly stated at the Pre-Bid that the side-street pavement removal was included in the Removing Pavement Surface Bid Item. Millings may go to Gendron’s, but do not have to (Section 10.12). The bid opening is March 5, 2013 at 2:00 p.m. at City Hall. An addendum, which includes the meeting sign-up sheet and minutes will be out by tomorrow, February 2, 2013. 3. Traffic: There can be road closures by section, if needed, as there are enough areas for detours. This should be included with the traffic plan. 4. Questions 1. Will water gates be lowered before milling? Justin will get that planned for. 2. “Altering Catch Basins” includes frame and grate. 3. Are there time restrictions? There will be no night work unless approved. Submit any anticipated, sectional road closures with traffic plan. If any of the meeting participants feel that the above is not an accurate representation of what was discussed at the meeting, they should contact Justin Early, Project Engineer at 513-3003, Ext. 3421.