Full Text
PUBLIC WORKS PROJECTS 2012‐2013 WATER LINES Project Title Location Contractor SPT23 Monroe/Harrison Six‐Points Solutions SPT24 Hill/Downey, 11‐13 Connell Resources Mitchell/Curtis, 7‐9 Connell Resources SPT25 Shield/Curtis, 6‐7 Mechanical Systems Inc. Shield/Lyon, 4‐5 Mechanical Systems Inc. SPT26 Cedar, Curtis‐Harney Simon Contractors SPT27 Ord/Steele, 17‐Park Hamaker Excavation Park/Sheridan, 15‐17 Hamaker Excavation SPT28 Ord/Steele, 13‐15 Hamaker Excavation 13‐15 Hamaker Excavation SPT29 Russell/Fetterman, 5‐7 Not assigned Quarterhorse Waterline Imperial Heights Pump Station Not assigned Grand Avenue Waterlines 15th Street ‐ 21st Street Not assigned SPT31 Canby/Sully, 9‐11 Not assigned Lyons‐Reynolds, 7‐9 Not assigned SPT32 Overland/Park, Hillside/LaPrele Not assigned SPT34 19th Street, Reynolds/cul de sac Not assigned SANITARY SEWER LINES Project Title Location Contractor SPT24 Hill/Downey, 11‐13 Connell Resources Mitchell/Curtis, 7‐9 Connell Resources SPT25 Shield/Curtis, 6‐7 Mechanical Systems Inc. Shield/Lyon, 4‐5 Mechanical Systems Inc. SPT26 Cedar, Curtis‐Harney Simon Contractors SPT27 Ord/Steele, 17‐Park Hamaker Excavation Park/Sheridan, 15‐17 Hamaker Excavation SPT28 Ord/Steele, 13‐15 Hamaker Excavation 13‐15 Hamaker Excavation SPT29 Russell/Fetterman, 5‐7 Not assigned SPT31 Canby/Sully, 9‐11 Not assigned Lyons‐Reynolds, 7‐9 Not assigned SPT32 Overland/Park, Hillside/LaPrele Not assigned SPT36 Cedar, Bradley ‐Garfield Not assigned B‐Line Replacement Garfield ‐ Sanders Not assigned South Laramie Sewer Extension Sanders ‐ Skyline and east Not assigned Banner Road Outfall Curtis Street ‐ WWTP Not assigned WATER TREATMENT Project Title Location Contractor Center Pivot Replacement Monolith Ranch Not assigned ---PAGE BREAK--- Salt Storage System Wye Facility Not assigned Simpson Springs Well Drilling Monolith Ranch Water Systems Drilling Inc. Zone 3 Water Storage Tank To be determined Not assigned WASTEWATER TREATMENT Project Title Location Contractor Blower Pipe Replacement Wastewater Treatment Plant Completed Grit Hopper Wastewater Treatment Plant In‐house WAS meter Wastewater Treatment Plant In‐house Effluent meter Wastewater Treatment Plant In‐house WL Lift Station Wastewater Treatment Plant Velocity Constructors STREETS Project Title Location Contractor Vista Drive Grand Ave ‐ Meadowlark WYDOT/Simon Downtown Lighting Phase 2 Clark/Sheridan, 1st‐4th Speigelberg Downtown Lighting Phase 3 Clark/Sheridan, 1st‐4th (remainder) Not assigned Slurry Seal Various Intermountain Slurry Seal