Full Text
Solid Waste Automated Garbage Collection 430,589 $ Integrated Solid Waste Management Plan 50,000 $ Curbside Recycling 76,755 $ Wastewater West Laramie Banner Road Outfall 1,064,295 $ Adams Street Lift Station 831,674 $ South of Laramie Sewer Study 30,058 $ 27" Outfall Abandonment 44,000 $ Aeration Basin Cleaning 150,000 $ Development Aerial Photo GIS Layers 20,000 $ Grease Interceptor 33,000 $ Garfield San Sewer 500,000 $ Water 2008 Waterline System Rehab $ 500,000 2009 Priority 1 Water Main Rehab Design/Constr $ 1,650,000 Laramie Transmission Pipeline Project 7,835,882 $ South Laramie Water Delivery - Level III 432,975 $ Superior Court Water Line 150,000 $ On Site Chlorine Generation 870,000 $ Backwash Water Reuse 505,000 $ Flushing Valves for 20"/24" Pipelines 81,640 $ Analysis of 20"/24" Transmission Pipelines 385,000 $ Electric Valve Replacement 286,000 $ WTP Security Fencing 5,000 $ Expansion Tank 132,000 $ Water Management Plan (WWDC) - $ Grease Interceptor 33,000 $ Streets Vista Dr. 300,000 $ Storm Water Interceptor 122,550 $ South Yard Paving 75,000 $ West Laramie Paving 1,371,726 $ West Laramie Drainage 2,029,250 $ PROJECT Public Works Capital Projects ‐ FY 2009/2010 Budget ---PAGE BREAK--- WL Drainage Master Plan 76,073 $ West Campus Drainage 200,000 $ Rebuild Storm Sewer Inlets 66,000 $ Adams Street Reconstruction 10,000 $ Safe Routes to School 100,000 $ TOTAL PROJECT BUDGET 20,447,467 $