← Back to Lafayette

Document Lafayette_doc_e2eb7c05d4

Full Text

All fees are subject to change without notice. 1-1-26 City of Lafayette Building Permit Fees Fee Description Residential Non-Residential Single-Family Multi-Family Duplex Accessory Dwelling* Commercial/Industrial Building Permit Fee See attached Exhibit A Plan Check Fee 65% of Building Permit Fee Water Tap Fee Dependent on water meter size. See attached Exhibit B. Water Rights per Subdiv. Agree. Contact Public Works Contact Public Works Water Meter Dependent on meter size. See attached Exhibit B. Water Reclamation Tap Fee Dependent on water meter size. See attached Exhibit B. Electrical Temporary $33 City Use Tax 3.87% of 60% of total value (.02322 x value) County Use Tax 1.335% of 60% of total value (.00801 x value) Affordable Housing Fee $1.00 per square foot for new residential unit (includes unfinished basement) $1.00 per square foot of gross floor area of structure Engineering Inspection $250 per new residential unit; $200/unit for razed/rebuilt Impact Fees Paid with Building Permit Storm Water Fee $1,300 per residential unit and non-residential building if platted prior to 4-13-07. If platted after 4-13-07, paid as part of development impact fee, see Attached Exhibit C. Storm Water Utility Fee/Unit type $1,750 $750 $1,250 $250 N/A Service Expansion Fee $7,500 $2,500 Per DU Per TH, Condo, or Apt $10,000 Per 2 DU $1,000 $0.15/gross building sq. ft. Parks & Rec Fee $1350 per unit $0.35/gross sq. ft. of building Public Arts Fee $150 per unit $0.05/gross sq. ft. building Other Miscellaneous Fees Master Plan Review Fee Per Permit for One- and Two- Family Dwellings and Townhomes $750 Renewal of Building Permit Half the original Building Permit Fee, Minimum $100 Stormwater Management Permit $100/plan plus $50 per distributed acre > 5 acres Building Permit Commitment Deposit $1,000 /unit Temporary Sign Permit $25 Temp. Outdoor Sales, Storage or Display of Merchandise $75 Fire Inspection See Exhibit D Permit Fee for work without an issued permit Double building permit fee Out of City Fees Properties outside the legal City boundary pay twice the listed amount for water tap, water reclamation tap and water right fees. * Separate water service, waste water service, water meters and water rights are not required for accessory dwelling units if existing tap is adequate for increased fixture count. If not, owner is responsible for installing new tap and paying difference in tap/meter costs Building Permit Fees ---PAGE BREAK--- Exhibit A Building Permit Fee Schedule 1290 S. Public Road Lafayette, Colorado 80026 Total Valuation Fee Residential: AC, Furnace, Fence, Roof, Sewer Repair, Shed, Siding, Solar PV, Water Heater, & Windows $100.00 Demolition Review w/out HPB Review $150.00 per application Demolition Review with HPB Review $300.00 per application plus Public Hearing Fee $1.00 to $500.00 $30.00 $501.00 to $2,000.00 $30.00 for the first $500.00 plus $3.35 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $80.25 for the first $2,000.00 plus $15.40 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $434.45 for the first $25,000.00 plus $11.11 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $712.20 for the first $50,000.00 plus $7.70 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $1,097.20 for the first $100,000.00 plus $6.16 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $3,561.10 for the first $500,000.00 plus $5.22 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $6,176.10 for the first $1,000,000.00 plus $4.01 for each additional $1,000.00, or fraction thereof Other Inspections and Fees 1. A plan review fee 65% of the applicable building permit fee 2. Inspections outside of normal business hours (min. charge 2 hours) $75.00 per hour* 3a. Reinspection fees $75.00 per hour* 3b. Electrical reinspection fees $75.00 per inspection 4. Inspections for which no fee is specifically indicated (minimum charge - one hour) $75.00 per hour* 5. Additional plan review required by changes, additions or revisions to plans (min. charge - one hour) $75.00 per hour* 6. For use of outside consultants for plan checking and inspections, or both Actual costs** *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include the supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. **Actual costs include administrative and overhead costs. Exhibit A Building And Sign Permit Fee Schedule All fees are subject to change without notice. 1-1-26 Page 2 of 6 ---PAGE BREAK--- Note: All fees are subject to change without notice. 1-1-26 Exhibit B – Utility Tap Fees Water Meter and Utility Tap Fees3 Water Tap Size Maximum Peak Flow1 (gpm) Tap Fee Meter Fee 3/4" Tap 30 $20,300 $346 1" Tap 50 $33,900 $392 1 1/2" Tap 100 $67,600 $1,070 2" Tap 160 $108,200 $1,287 3” Tap 350 $176,000 $1,540 4” Tap 600 $406,000 $2,814 6” Tap2 Contact Public Works $676,600 $5,213 Residential Duplex (Two-Units)* *If units sold separately, each unit must have its own tap $31,700 for Duplex with single tap Multi-Family Units* or Mobile Home Community *If units sold separately, each unit must have its own tap $20,300 per building plus $9,304 per unit Accessory Dwelling Unit* *Separate water taps, water meters, and water rights are not required for accessory dwelling units under 750 sq. ft. if existing tap is adequate for increased fixture count. If not, owner is responsible for installing new tap and paying difference in tap/meter costs $9,304 per unit Out-of-City Fees Twice the applicable In-City Tap Fees Same as In-City Meter Fees 1 Water Meter Sizing Tool required to evaluate fixture counts and confirm meter/tap sizing. 2 Contact Public Works Department for tap/meter larger than 4-inches. 3. All properties must be within Northern Water Conservancy District Boundary prior to service. Water Reclamation Tap Fees (Based on Water Tap Size) Water Tap Size/Category Tap Fee 3/4" Tap $6,350 1" Tap $10,600 1 1/2" Tap $21,100 2" Tap $33,800 3” Tap $55,050 4” Tap $127,000 6” Tap $211,650 ---PAGE BREAK--- Exhibit B Utility Tap Fees (Continued) Note: All fees are subject to change without notice. 1-1-26 Water Tap Size/Category Tap Fee Residential Duplex (Two-Unit)* *If units sold separately, each unit must have its own tap $9,500 for Duplex with single tap Multi-Family Units* or Mobile Home Community *If units sold separately, each unit must have its own tap $6,350 per building plus $2,865 per unit Accessory Dwelling Unit* $2,865 per Unit Out-of-City Tap Fees Twice the applicable In-City Tap Fees Miscellaneous Water Reclamation Fees Category Fee Private Effluent Disposal System Construction and Permit Inspection Fee (95-76(b)) $25 per Application Non-Residential Discharge Permit (95-74(17)) Varies; amount sufficient to pay the costs of administering the permit as determined by the Water Reclamation Superintendent ---PAGE BREAK--- Note: All fees are subject to change without notice. 1-1-26 Exhibit C Development Impact Fees & Exactions Exhibit C Development Impact Fees and Exactions Water Rights Dedication The dedication of water rights occurs with the platting of residential properties based on predetermined projected uses. For non-residential uses water rights are either dedicated at the time of platting or can be deferred until the issuance of a building permit. The amount of water rights dedication for non-residential uses is based on a projected annual water use that is dependent on the actual land use. Any development with a projected total annual water use of ten (10) acre-feet or more is required to dedicate shares of CBT water units; approval of cash-in-lieu is at the sole and absolute discretion of City Council. Developments with a projected total annual water use of less than ten (10) acre-feet is also required to dedicate shares of CBT water units; approval of cash-in-lieu is at the sole and absolute discretion of the Director of Public Works. The cash in-lieu fee is periodically subject to change based on the market value fluctuation of the Colorado- Big Thompson (CBT) units. If the projected number of CBT units results in a fraction the total number of CBT units is rounded up to the next whole number. Along with the dedication of water rights, developments are required to pay a Windy Gap/Northern Integrated Supply Project (NISP) Supplemental Water fee for each acre-foot of water dedicated. All properties receiving water service from the City of Lafayette must be within the service boundary of the Northern Colorado Conservancy District (District). If the property is not, an approved Petition for Inclusion to the District must be received prior to service. Residential Water Rights Dedication Single-Family dwelling 0.50 acre-feet per unit Multi-Family dwellings, including duplexes with outdoor irrigation 0.35 acre-feet per unit Multi-Family dwellings, including duplexes with no outdoor irrigation 0.25 acre-feet per unit Non-residential Water Rights Dedication In most non-residential subdivisions the water rights dedication is required at the time of issuance of the building permit. The water right dedication amount is determined based upon the proposed land use and the projected annual water use. Windy Gap/Northern Integrated Supply Project (NISP) Supplemental Water Fee $5,021 per acre-foot of dedicated water Acre-foot yield per CBT share One CBT share yields 0.70 acre-feet of water Cash in-lieu fee $95,714 per acre foot ---PAGE BREAK--- Note: All fees are subject to change without notice. 1-1-26 Exhibit C Development Impact Fees & Exactions (continued) Stormwater Utility Fees Category Fee Per Stormwater Construction Fee – Developed Land (104-18(b)) Residential Single Family $1,750 Unit Residential Duplex $1,250 Unit Residential Multi-Family Units) $750 Unit Residential ADU or Mobile Home $250 Unit Stormwater Development Fee – New Platted Land (104-19) Platted on or after 4/13/2007 $0.254 Sq. Ft. of land $11,632 Acre of land Platted prior to 4/13/2007 $1,300 Per dwelling unit or non-residential building Storm Drainage Fee - Grading and Erosion Plan Review $100 Plan Storm Drainage Fee - Disturbed Area > 5 Acres $50 Plan per Acre Public Land Dedication Amount of Public Land dedication 12% of total land area (Non-residential) 15% of total land area (Residential) Cash-in-Lieu Fair market value of required dedication Visitability Regulations Cash In-Lieu Amount Unit Unbuilt visitable dwelling unit $5,000.00 Per dwelling unit Unbuilt visitable model home unit $10,000.00 Per model home Off Street Parking Requirement Cash In-Lieu Amount Unit Parking stall $12,000.00 Per parking stall ---PAGE BREAK--- Exhibit D Fire Department Fees Construction Inspection Fee Non-Residential Only New Building Core & Shell Fee 1 - 15,000 sq. ft. $350 15,001 - 100,000 sq. ft. $350 for the first 15,000 sq. ft. plus $.0125 for each additional sq. ft. up to 100,000 sq. ft. 100,001 - 150,000 sq. ft. $1,600 for the first 100,000 sq. ft. plus $.025 for each additional sq. ft. up to 150,000 sq. ft. over 150,000 sq. ft. $3,750 for the first 150,001 sq. ft. plus $.03 for each additional sq. ft. Tenant Finish Fee 0-1,500 sq. ft. $50 over 1,500 sq. ft. $50 for the first 1,500 sq. ft. plus $.033/sq. ft. for each additional sq. ft. Reinspection Fee $75 for first offense, double the previous fee for every re-inspection. Exhibit D Sprinkler or Fire Suppression System and/or Fire Alarm All fees are subject to change without notice. 1-1-23