Full Text
Plan Rev (Small P 1. E as 2. T sh 3. P 4. In Plan Rev (Large P 1. N sp 2. T S 3. A ap 4. P 5. In Special R Adopted 2015 Inte NFPA 13 NFPA 72 Special A pressur and/or cro Special 1. A 2. In Special None. Eac view & Subm Projects & T xisting system ssembly, and he typical tim hould be mad refer NICET nspection requ view & Subm Projects) New systems s pecified in thi he typical tim ubmittals sho All submittals a pproved by th refer NICET nspection requ Requirement d Standard rnational Fire – Standard fo – National Fi l Fire Sprink re gauge shal oss-connectio l Standpipe R All designs mu n some instan l Pre‐action S ch project is r mittal Requir Tenant Fini m alterations, d consisting of me period for p de with this ex III qualificatio uests must be mittal Requir shall comply w s section. me period for p ould be made are expected he Lafayette F III qualificatio uest must be ts / Code Int s / Codes ( Code or the Installa re Alarm Cod kler Requirem l be required on control dev Requiremen ust meet NFPA nces, roof pre System Requ review specifi Lafayet S rements ishes) (Def or the install f 20 or fewer plan review of xpectation. n for fire sprin e scheduled 4 rements with applicab plan review of with this exp to be in 100% Fire Preventio n for fire sprin scheduled 48 terpretation (Including S ation of Sprink de, 2016 editio ments on all NFPA vice. ts A 14 criteria a ssure require uirements ic to that indiv tte Fire Sprinkler fine Small P ation of a ten heads is cons f small projec nkler system 48 hours in ad le design stan f large project ectation. % compliance on Bureau. nkler system 8 hours in adv Specific Ed kler Systems, on 13 systems, and requirem ements may b vidual project Depart System Projects) nant finish sys sidered a sm cts is one t or qualified P dvance: (303 ndards and s ts is a maxim e with applica or qualified P vance: (303) dition) 2016 edition located above ments of the IF be modified. . tment stem to an ex all project. to two wee Professional E ) 661-1202. hall conform mum of two ble design sta Professional E 661-1202. e and below the main valve FC. isting riser eks. Submittals Engineer. to requirements as ) weeks. andards, as Engineer. ---PAGE BREAK--- Special Underground Requirements 1. Installations shall be in accordance with NFPA 24 and applicable City of Lafayette design criteria. 2. The assigned Engineering Inspector from the Public Works Department handles plan review and inspections. 3. For additional information, call (303) 665-5506 ext 1276. Fire Hose Threads & F.D.C. Requirements 1. All thread connections shall be N.S.T. (National Standard Thread). 2. FDC access shall be clear and unobstructed for a width of 3 feet from street, parking lot, etc. 3. FDC locations in excess of forty (40) feet from approved fire apparatus access shall require approval of the Lafayette Fire Prevention Bureau. Alternate design may include a freestanding FDC installed at a location approved by the FPB. Water Flow Test Information For hydrant flow test information contact: (303) 665-5506, ext 1275. Other Requirements For additional information, contact Norm Kellett - Fire Marshal (303) 661-1202. Fire Sprinkler Rough and Final Inspections Requirements / Procedures for Requesting Inspections 1. 48 hours advance notice is requested to meet scheduling request. 2. Please contact (303) 661-1202 to schedule a fire sprinkler inspection. 3. Access to all required areas must be assured by the contractor to insure proper inspection of required system components. 4. Special equipment or appliances necessary for any required inspection shall be provided by the contractor or business owner. 5. Re-inspection fees may be applied to projects requiring multiple re-inspections due to poor system installation or repeated failure of NFPA 13 required system testing. Interior Ordinary Hazard Fire Sprinkler System Inspection: Existing system alterations or modifications involving fewer than 20 sprinkler heads shall not require hydrostatic testing, unless piping has been replaced and/or altered. Underground Pipe Inspections including Flushing: 1. All inspections and flushing criteria shall comply with NFPA 24 and City of Lafayette criteria. 2. Inspections are scheduled with assigned Engineering Inspectors with the Public Works Department. ---PAGE BREAK--- Annual and Semi‐annual Fire Sprinkler Inspections: 1. Annual backflow prevention inspections are required by the Public Works Department. 2. All system inspection and maintenance requirements shall comply with applicable NFPA 13 and 25 standards. Email Address for questions or comments: Primary: [EMAIL REDACTED] System requirements Plan review For Inspections call: (303) 661-1202