Full Text
Bioretention Project: Firm : Date : No. YES N/A Deviation Requested Montana Post-Construction Storm Water BMP Design Guidance Manual - Bioretention 5.3.1 Description 5.3.2 Performance 5.3.3 Site Selection 5.3.4.1 Full infiltration, partial infiltration, or no infiltration section 5.3.4.2 Basin storage volume 5.3.4.3 Surface ponding area geometry 5.3.4.4 Inlet and coveyance 5.3.4.5 Pretreatment facilities 5.3.4.6 Surface cover 5.3.4.7 Bioretention soil media 5.3.4.8 Underdrain system 5.3.4.9 Impermeable liner 5.3.4.10 Guidelines for incorporating flood control 5.3.5 Vegetation considerations 5.3.6 Construction considerations 5.3.7 Maintenanace 5.3.8 Plan view and typical details Section references on this sheet are to the Montana Post-Construction Storm Water BMP Design Guidance Manual. Please also refer to section 7.1.4.B of the CK Standards for CK modifications to the BMP Manual. Deviation requests noted on this form shall be submitted for review and approval in accordance with Section 3.3 of the Design and Construction Standards. Deviations not individually approved, even if shown in the approved plans, specifications, or reports, are not approved.