Water System Project: Firm : Date : No. YES N/A Deviation Requested Water System 5.1.1.A Professional Stamp 5.1.1.B MDEQ Circular 1 Requirements 5.1.1.C Fire flow tests 5.1.2.A Water pipe size 5.1.2.B Water pipe locations 5.1.3.A Valve sizes and types 5.1.3.B Valve locations 5.1.4 Fire locations 5.1.5.A Water service general requirements 5.1.5.B Water service locations 5.1.5.C Water service sizes 5.2.1 and CK Special Provision for Water Construction 5.2.2 Offsets 5.2.3 Pipe materials 5.2.4 Valve materials 5.2.5 Valve box materials 5.2.6 Fire Hydrant materials 5.2.7 Service saddle materials 5.2.8 Corp. and curb stop materials 5.2.9 Service fitting materials 5.2.10 Curb box materials 5.2.11 Service pipe materials 5.2.12 Meter pit/vault materials 5.2.13 Tapping sleeve materials 5.2.14 Ductile iron fitting materials 5.2.15 Mechanical joint restraint materials 5.2.16 Pipe bedding materials 5.2.17 Warning tape materials 5.2.18 Toner wire materials 5.2.19 Marker post materials Deviation requests noted on this form shall be submitted for review and approval in accordance with Section 3.3 of the Design and Construction Standards. Deviations not individually approved, even if shown in the approved plans, specifications, or reports, are not approved.