Full Text
Dock (New) utilizing a multiplier of $1.00 per sq. f.t. Dock Renovation Dock Resurface only Swimming Pool Fountains Spa Only Fire Pit Seawalls (New and Renovation) Retaining Wall Moving a Building/Structure Temporary Structure <400 Amps >400 Amps Attached and Detached Enclosed Garage, Carport or Porch, Open Porch, Open Deck and Accessory Buildings Per current ICC Building Valuation Table, min $125 Miscellaneous Greene County Building and Zoning Permit Fee Schedule Building Permits-Residential (This would cover all trades) Docks Manufactured Home Commercial - New Construction …...Per current ICC Building Valuation Table - Utility, Misc. Check with Building and Zoning Office for questions concerning Building Valuation Table Calculations Most single family dwellings and single-family remodeling work will be Group R-3, Construction Type VB Non-residential Building - Shell Only Office, Retail, Industrial, Other Types Non-residential Interior Finish of Existing Shell current ICC Building Valuation Table - Min. $125 current ICC Bldg. Valuation Table - Storage, Low Hazard Electrical (If Not Part of New Construction Permit) Approved by the Greene County Board of Commissioners on July 9, 2024, effective upon adoption. $0.25 per square foot current ICC Building Valuation Table- Utility, Misc. + $0.20 Per Amp over 400 Amps ---PAGE BREAK--- Heating BTU COOLING BTU (TON) 0-100,000 36,000 100,000-150,000 48,000 150,000-200,000 60,000 200,001-300,000 90,000 (7.5) 300,001-500,000 120,000 (10) 500,001-600,000 180,000 (15) 600,001-800,000 240,000 (20) 800,001-1,000,000 300,000 (25) 1,000,001-2,000,000 360,000 (30) 2,000,001-4,000,000 480,000 (40) 4,000,001-6,000,000 600,000 (50) 6,000,001-8,000,000 700,000 (60) 8,000,001-10,000,000 900,000 (75) Commercial Residential Tower Co-location ONLY $125 RESIDENTIAL - If Not Part of New Construction Permit . Telecommunications Tower or Structure Utility Permit $50/1st 2,640 ft + $25 for each additional 2,640 ft Signs Plumbing (If Not Part of New Construction Permit) HVAC Gas - Both New and Renovation COMMERCIAL - If Not Part of New Construction Permit, see the below table. per sign permit per sign permit $125 ---PAGE BREAK--- Less than one acre 1st Reinspection 2nd Reinspection 3rd Reinspection Conditional Use Permit Variance Review Special Use Permit Rezoning Preliminary Plat for Minor Subdivision Review Fee Preliminary Plat for Major Subdivision Review Fee $1,200 One acre or more requires NPDES Permit per acre disturbed ($40 to GA EPD and $40 to Greene County) Land Disturbing Activities Development of Regional Impact (DRI) $500 Miscellaneous Inspection Fee Plats (Including, but not limited to, Fire, Life Safety, MH Storage, Temporary Jobsite Trailer, Occupancy Change, Compliance Inspection, Electrical Inspection for Reconnection, Repairs, etc., Certificate of Occupancy, Driveways, Demolition) $150 Re-Inspection Fees Construction or Land Disturbance WITHOUT a Permit Preliminary Plat for Major Subdivision Final Plat for Major Subdivision Final Plat for Major Subdivision Review Fee for first review and $100.00 for each subsequent review Planning and Zoning Commission Items Final Plat for Minor Subdivision Review Fee for first review and $75.00 for each subsequent review for first review and $100.00 for each subsequent review for first review and $75.00 for each subsequent review More than 3 reinspections for same issue