Full Text
SHEET INDEX C001 COVER SHEET C101 EXISTING CONDITIONS C201 MAINLINE PLAN C202 ROAD PROFILE & TYPICAL SECTION C203-C204 ROAD CROSS SECTIONS C301 GRADING & DRAINAGE PLAN C401 EPD SITE IMPACT MAP C501 INITIAL EROSION PLAN C502 INTERMEDIATE EROSION PLAN C503 FINAL EROSION PLAN C504 EROSION CONTROL NOTES C505 EROSION CONTROL DETAILS C506 VEGETATION PLAN C507 C508 DRAINAGE MAP & SEDIMENT CALCS. C601 STORM SEWER PROFILES C602 STORM DETAILS C701-702 CONSTRUCTION DETAILS SITE N VICINITY MAP N FLOOD MAP GORDON COUNTY PUBLIC WORKS STEVE PARRIS 116 PUBLIC SAFETY DR CALHOUN, GA 30701 STEVE PARRIS DATE: MAY 3RD, 2023 CONSTRUCTION DOCUMENTS FOR: CLIENT ENGINEER: BAILEY CIVIL GROUP, LLC MATT BAILEY, P.E. P.O. BOX 4392 CARTERSVILLE, GA 30120 TELEPHONE: [PHONE REDACTED] EMAIL: [EMAIL REDACTED] TOTAL AREA OF DISTURBANCE = 0.85 ACRES WETLAND DISTURBANCE = 0.168 ACRES OPEN WATER DISTURBANCE=0.149 ACRES STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.) 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] C001 G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA LEVEL II DESIGN PROF. CERT#000010458 COVER 3 GRADING PAVING AND 11 10 LANDSCAPING CLEAN UP FINAL 9 8 7 6 5 4 (TEMP.) (PERM.) MAINTAIN EROSION CONTROL STORM DRAIN INSTALLATION GRASS ANTICIPATED ACTIVITY SCHEDULE ACTIVITY 2 INSTALL SEDIMENT CONTROLS CLEARING AND 1 3 5 7 6 4 2 8 1 FLAG/STAKE CLEARING LIMITS 9 10 11 12 GUARDRAIL INSTALL EXISTING DAM DEMOLITION OF DRAIN LAKES PRIMARY PERMITTEE: GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 PHONE: [PHONE REDACTED] [EMAIL REDACTED] PROJECT NARRATIVE: THE PROJECT WILL CONSISTS OF THE REMOVAL AND REPLACEMENT OF AN EXISTING ROAD DAM. THE DAM IS IN NEED OF REPAIR DUE TO INADEQUATE SIDE SLOPES. THE ROAD DAM AND THE EXISTING OUTLET PIPES WILL BE REMOVED. THE EXISTING LAKE WILL NEED TO BE DRAINED IN ORDER TO PLACE FILL FOR THE PROPOSED DAM RESTORATION. FILL WILL BE PLACED WITHIN THE EXISTING LAKE OPEN WATERS, THEREFORE A CORP OF ENGINEERS PERMIT WILL BE REQUIRED ALONG WITH AN EPD BUFFER VARIANCE. CURRENTLY THE ROAD DAM CONSIST OF TREES AND SHRUBS WITH STEEP SIDE SLOPES. THE PROPOSED DAM WILL CONSIST OF A GOOD STAND OF GRASS WITH 2:1 SIDE SLOPES. A NEW LAKE OUTLET WILL BE INSTALLED. GENERAL NOTES: -POST SPEED: 35 MPH -TRAFFIC ADT: N/A TRUCKS: N/A -FUNCTIONAL CLASS: LOCAL MINOR RURAL -THIS PROJECT IS 100% LOCATED IN GORDON COUNTY -THIS PROJECT IS FUNDED BY GORDON COUNTY - NET LENGTH OF PROJECT: 0.104 MILES -MID POINT COORDINATES: 2113406.17, 1622173.74 SITE MT. OLIVE CHURCH ROAD STATE ROUTE # N/A COUNTY ROUTE # N/A FEDERAL ROUTE # N/A DAM REMOVAL & RESTORATION ---PAGE BREAK--- 40' 18.3' EXISTING CONDITIONS PLAN DEMOLITION NOTES: 1. CONTRACTOR SHALL OBTAIN ALL PERMITS BEFORE DEMOLITION AND CONSTRUCTION BEGINS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH GORDON COUNTY REGULATIONS, O.S.H.A. STANDARDS, AND GOVERNING EPA REGULATIONS. 2. CONTRACTOR TO COMPLY WITH LOCAL AND COUNTY REGULATIONS REGARDING HAULING, DISPOSAL, AND THE BURNING OR BURYING OF DEBRIS ON-SITE. 3. DEMOLITION MATERIALS NOT SUITABLE FOR FILL MATERIAL SHALL BE DISPOSED OF OFF-SITE. ALL DEBRIS SHALL BE HAULED OFF-SITE TO A DISPOSAL AREA APPROVED BY GORDON COUNTY AND STATE OF GEORGIA FOR THE HANDLING OF DEMOLITION DEBRIS. 4. THE LOCATIONS OF EXISTING UTILITIES SHOWN ARE BASED ON A SURVEY AS INDICATED IN THE GENERAL NOTES ON THE SITE PLAN. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES BETWEEN THESE PLANS AND FIELD CONDITIONS. 5. CONTRACTOR SHALL CONTACT ALL UTILITIES COMPANIES (WATER, SEWER, POWER, TELEPHONE, NATURAL GAS, CABLE, ETC) FOR PROPER DISCONNECT OF UTILITIES TO BUILDING TO BE REMOVED, AS WELL AS VERIFICATION OF UTILITIES TO BE RELOCATED DUE TO CONSTRUCTION. CONTRACTOR TO CALL GEORGIA ONE-CALL CENTER @ 811 AT LEAST 72-HOURS PRIOR TO CONSTRUCTION TO HAVE UTILITIES LOCATED. 6. CONTRACTOR RESPONSIBLE FOR LOCATING, IDENTIFYING, DISCONNECTING, AND SEALING OR CAPPING UTILITIES SERVING BUILDINGS AND STRUCTURES TO BE DEMOLISHED. 7. THE PURPOSE OF THIS PLAN IS FOR DEMOLITION ONLY. UTILITIES SHALL NOT BE REMOVED, ABANDONED OR RELOCATED UNTIL ALTERNATE PROVISIONS ARE MADE TO MAINTAIN SERVICE TO OTHER BUILDINGS/FACILITIES AS APPROVED BY THE OWNER. 8. CONTRACTOR SHALL PROTECT ALL ADJACENT LANDS FROM DAMAGE DURING DEMOLITION WORK. ANY OFF-SITE AREAS DISTURBED SHALL BE RETURNED TO A CONDITION EQUAL TO OR BETTER THAN THE EXISTING CONDITION. C101 20 20 40 60 FEET SCALE: 1" = 20' 0 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA N EXISTING CONDITIONS PLAN LEVEL II DESIGN PROF. CERT#000010458 ---PAGE BREAK--- BP: 0+00.00 PC: 0+75.74 PT: 1+07.66 PC: 1+47.53 PT: 2+49.11 PC: 3+96.77 PT: 4+07.14 PC: 5+49.42 PT: 6+10.16 40' 18.3' R10' R10' R1000' R300' R700' 0+00 1+00 2+00 3+00 4+00 5+00 6+00 50' 24' 12' 12' 6.5' SHOULDER SLOPE @ 34"/FOOT 6.5' SHOULDER SLOPE @ 34"/FOOT 6.5' SHOULDER SLOPE @ 34"/FOOT 6.5' SHOULDER SLOPE @ 34"/FOOT CONSTRUCTION CENTERLINE BEGIN PROJECT STA: 0+08.06 N:2113165.87 E:1622182.42 BEGIN TAPER STA: 0+08.06 OFF: 9.45' BEGIN TAPER STA: 0+08.06 OFF: 9.429' END TAPER STA: 0+58.06 OFF: 12.0' END TAPER STA: 0+58.06 OFF: 12.0' BEGIN TAPER STA: 4+65.40 OFF: 12.0' BEGIN TAPER STA: 4+65.40 OFF: 12.0' END TAPER STA: 5+15.40 OFF: 9.58'' END TAPER STA: 5+15.40 OFF: 9.18'' END PROJECT STA: 5+40.24 N:2113696.50 E:1622195.25 PROPOSED EDGE OF PAVEMENT PROPOSED 5" SOLID WHITE LINE PROPOSED 5" SOLID WHITE LINE PROPOSED EDGE OF PAVEMENT 5" SOLID DOUBLE YELLOW BEGIN W-BEAM GUARDRAIL STA: 0+58.06 OFF:16.00 TYPE 12A ANCHOR BEGIN W-BEAM GUARDRAIL STA: 0+07.66 OFF:16.00 TYPE 1 ANCHOR END W-BEAM GUARDRAIL STA: 5+40.24 OFF:13.50 TYPE 1 ANCHOR END W-BEAM GUARDRAIL STA: 5+00 OFF:14.00 TYPE 12A ANCHOR 50' PERMANENT SLOPE EASEMENT PERMANENT SLOPE EASEMENT A1 A2 48" RCP C201 20 20 40 60 FEET SCALE: 1" = 20' 0 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA N MAINLINE PLAN STA: 0+00 TO 5+50 LIGHT DUTY ASPHALT DETAIL NOTE: 98% STANDARD PROCTOR COMPACTION IS REQUIRED IN ALL AREAS OF FILL. GEOTECHNICAL ENGINEER TO OBSERVE PLACEMENT OF FILL DURING CONSTRUCTION. LAKE POND PIPE TRENCH TO BE FILLED WILL CONCRETE UP TO THE SPRINGLINE. NO TREE GROWTH ON DAMS. DAM IS TO MAINTAIN A GOOD STAND OF GRASS, AND TO BE MAINTAINED BY GORDON COUNTY TO PREVENT BRUSH AND TREE GROWTH. ---PAGE BREAK--- MT. OLIVE CHURCH RD VERTICAL SCALE: 5.00 HORIZONTAL SCALE: 20.00 1.28% -0.50% GRADE BREAK STA = 0+00.00 ELEV = 753.548 GRADE BREAK STA = 5+15.40 ELEV = 754.077 HIGH PT STA: 2+18.63 HIGH PT ELEV: 755.42 PVI STA:1+75.00 PVI ELEV:755.78 K:112.44 LVC:200.00 BVCS: 0+75.00 BVCE: 754.51 EVCS: 2+75.00 EVCE: 755.28 END PROJECT STA: 5+40.24 C202 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA ROAD PROFILE & TYPICAL SECTION ---PAGE BREAK--- 3+50.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 0+50.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 1+00.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 1+50.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 2+00.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 2+50.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 3+00.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 4+00.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 710.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 -6.25% 50.00% -2.00% -50.00% OFFSET =0.000 FG. ELEV = 754.906 OFFSET =-18.500 FG. ELEV = 754.260 OFFSET =18.500 FG. ELEV = 754.260 OFFSET =0.000 FG. ELEV = 755.380 OFFSET =18.500 FG. ELEV = 754.733 OFFSET =-18.500 FG. ELEV = 754.733 OFFSET =0.000 FG. ELEV = 755.214 OFFSET =-18.500 FG. ELEV = 754.568 OFFSET =18.500 FG. ELEV = 754.568 OFFSET =0.000 FG. ELEV = 754.187 OFFSET =-18.500 FG. ELEV = 753.540 OFFSET =18.500 FG. ELEV = 753.540 OFFSET =0.000 FG. ELEV = 754.655 OFFSET =18.500 FG. ELEV = 754.009 OFFSET =-18.500 FG. ELEV = 754.009 OFFSET =0.000 FG. ELEV = 755.157 OFFSET =-18.500 FG. ELEV = 754.511 OFFSET =18.500 FG. ELEV = 754.511 OFFSET =0.000 FG. ELEV = 755.408 OFFSET =-18.500 FG. ELEV = 754.762 OFFSET =18.500 FG. ELEV = 754.762 OFFSET =0.000 FG. ELEV = 754.798 OFFSET =-18.500 FG. ELEV = 754.151 OFFSET =18.500 FG. ELEV = 754.151 -6.25% 50.00% -50.00% -2.00% -2.00% -6.25% -50.00% 50.00% -2.00% -6.25% -50.00% -2.00% -6.25% -50.00% -2.00% -6.25% -50.00% 50.00% -2.00% 50.00% -50.00% -2.00% -6.25% -50.00% 50.00% 40' R/W 40' R/W 40' R/W 40' R/W 40' R/W 40' R/W 40' R/W 40' R/W EXISTING GROUND EXISTING GROUND EXISTING GROUND EXISTING GROUND EXISTING GROUND EXISTING GROUND EXISTING GROUND EXISTING GROUND -6.25% -6.25% -6.25% -6.25% -6.25% -6.25% -6.25% -6.25% -6.25% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% -2.00% C203 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD, 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA ROAD CROSS SECTIONS 20 20 40 60 FEET SCALE: 1" = 20' 0 ---PAGE BREAK--- 4+50.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 5+00.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 720.00 730.00 740.00 750.00 760.00 770.00 780.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 0.00 -10.00 -20.00 -30.00 -40.00 -50.00 -60.00 -70.00 -80.00 -90.00 -100.00 40' R/W OFFSET =0.000 FG. ELEV = 754.405 OFFSET =-18.500 FG. ELEV = 753.759 OFFSET =18.500 FG. ELEV = 753.759 OFFSET =0.000 FG. ELEV = 754.154 OFFSET =-18.500 FG. ELEV = 753.508 OFFSET =18.500 FG. ELEV = 753.508 -2.00% -6.25% -50.00% -2.00% -6.25% -50.00% 40' R/W EXISTING GROUND EXISTING GROUND -6.25% -6.25% -2.00% -2.00% C204 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD, 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA ROAD CROSS SECTIONS 20 20 40 60 FEET SCALE: 1" = 20' 0 ---PAGE BREAK--- F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F 40' 18.3' F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F A A 0+50.00 1+00.00 1+50.00 2+00.00 2+50.00 3+00.00 3+50.00 4+00.00 4+50.00 5+00.00 5+50.00 6+00.00 748 750 752 750 750 754 754 754 754 754 754 TOE OF PROPOSED SLOPE LIMITS OF FILL TOE OF PROPOSED SLOPE LIMITS OF FILL CONTRACTOR TO USE A SIPHON OR PUMP TO DRAW DOWN THE UPPER LAKE WATER LEVEL TO BELOW THE PROPOSED FILL LINE CONTRACTOR TO CONSTRUCT A COFFERDAM FOR FILL PLACEMENT IN THE LOWER LAKE. OR LOWER THE LAKE LEVEL AT THE OUTLET. LAKE OUTLET CONTROL 72" 1011A MANHOLE W/ PEDESTAL TOP 10'X10'X2' PLUNGE POOL A1 A2 48" RCP AREA TO BE RE-VEGETATED WITH BROOMSEDGE BLUESTREAM, EASTERN DAISY, AND FESUE. AREA TO BE RE-VEGETATED WITH BROOMSEDGE BLUESTREAM, EASTERN DAISY, AND FESUE. 740 738 752 750 736 GRADING NOTES: 1. ALL AREAS TO RECEIVE PAVEMENT, STRUCTURES OR FILL MATERIAL SHALL BE STRIPPED OF ORGANIC MATERIAL, TOPSOIL, AND DEBRIS PRIOR TO CONSTRUCTION. 2. ONCE STRIPPING HAS BEEN COMPLETED, ALL AREAS TO RECEIVE FILL SHOULD BE PROOF-ROLLED IN THE PRESENCE OF A REPRESENTATIVE OF THE SOILS ENGINEER. SOFT AREAS ENCOUNTERED DURING PROOF-ROLLING SHALL BE STABILIZED BY COMPACTION OR UNDERCUT. 3. ALL FILL AREAS SHALL BE FREE OF ORGANIC OR OTHERWISE UNSUITABLE MATERIALS AND COMPACTED TO 95% OF MAXIMUM DRY DENSITY PER STANDARD PROCTOR ASTM D698 UNLESS OTHERWISE SPECIFIED BY THE GEOTECHNICAL REPORT AS LISTED BELOW. THE TOP TWO FEET OF FILL UNDER STRUCTURES AND PAVEMENT SHALL BE COMPACTED TO 98% OF MAXIMUM DRY DENSITY PER STANDARD PROCTOR ASTM D698 UNLESS OTHERWISE SPECIFIED BY THE GEOTECHNICAL REPORT AS LISTED BELOW. 4. EARTHMOVING OPERATIONS SHALL BE PERFORMED IN ACCORDANCE TO THE GEOTECHNICAL REPORT BY GEOHYDRO ENGINEERS, DATED MARCH 24TH 2004 : 95% (COMPACTION RECOMMENDATIONS)". 5. ALL SITE PREPARATION SHOULD BE MONITORED BY A REPRESENTATIVE OF THE GEOTECHNICAL ENGINEER. INSPECTIONS AND TESTING FOR ALL UNDERCUT AND FILL OPERATIONS AS WELL AS THE UTILIZATION OF ACCEPTABLE OFF-SITE BORROW MATERIALS SHOULD BE PERFORMED. THE OWNER, AT HIS OPTION, MAY HAVE DENSITY TESTS PERFORMED TO VERIFY THAT SPECIFIC COMPACTION IS OBTAINED. 6. CUT OR FILL SLOPE SHOULD NOT BE STEEPER THAN 2H:1V. ALL PROPOSED SLOPES SHOULD BE OVERBUILT AND CUT BACK TO THE PROPOSED GRADES, EXPOSING THE FIRM COMPACTED INNER CORE. THE EXCAVATION FOR THE SLOPES SHOULD BE MONITORED BY A REPRESENTATIVE OF THE GEOTECHNICAL ENGINEER. VERTICAL CUTS EXCEED 5 FEET SHOULD BE BRACED AS REQUIRED BY OSHA REGULATIONS FOR SAFETY. 7. SPOT ELEVATIONS SHALL TAKE PRECEDENCE OVER CONTOURS AND SLOPES SHOWN. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF SPOT ELEVATIONS WHICH DO NOT APPEAR TO BE CONSISTENT WITH THE CONTOURS AND SLOPES. SPOT ELEVATIONS SHOWN ALONG CURB & GUTTER DESIGNATE THE PROPOSED GRADE AT THE LIP OF THE GUTTER UNLESS OTHERWISE NOTED. 8. CONTRACTOR SHALL INSTALL APPROPRIATE EROSION CONTROL MEASURES PRIOR TO ANY LAND DISTURBANCE ACTIVITIES. 9. THE CONTRACTOR SHALL ADJUST ALL MANHOLE COVERS, VALVE COVERS, CLEAN OUTS, VAULTS, BOXES, AND GRATES, EXISTING AND PROPOSED, TO "AS-CONSTRUCTED" FINISHED GRADE. 10. IF GRADE ADJUSTMENTS ARE REQUIRED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER TO INVESTIGATE SUCH ADJUSTMENTS. GRADING PLAN C301 20 20 40 60 FEET SCALE: 1" = 20' 0 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA N GRADING & DRAINAGE PLAN EARTH EMBANKMENT CONSTRUCTION: (PER GEOTECHNICAL REPORT PREPARED BY GEOHYDRO ENGINEERS, DATED MARCH 24TH, 2004) · DAM EMBANKMENT: A TYPICAL MAXIMUM SLOPE GRADIENT FOR EARTHEN DAMS 3H:1V. STEEPER SLOPES MAY RESULT IN STABILITY PROBLEMS AND CAN BE DIFFICULT TO MAINTAIN. · DAM VEGETATION: VEGETATION ACCEPTABLE FOR A DAM SHOULD CONSIST OF GRASS COVER SUCH AS FESCUE OR BERMUDA. THE PRESENCE OF UNDERBRUSH AND TREES IMPEDE THE PROPER PERIODIC EVALUATION OF THE DAM FOR SEEPAGE, STRUCTURAL DAMAGE, OR ANIMAL BURROWS WHICH CAN LEAD TO THE DEGRADATION OF THE DAM. IN ADDITION, TREES SHOULD NOT BE ALLOWED TO GROW WITHIN THE EMBANKMENTS. SUCH PLANT GROWTH CAN LEAD TO STRUCTURAL STABILITY CONCERNS. · EROSION CONTROL: EROSION CONTROL MEASURES ALONG THE UPSTREAM EMBANKMENT AND EMBANKMENTS SHOULD CONSIST OF GRASS, RIP RAP, OR OTHER EROSION CONTROL MEASURES. PROPER EROSION CONTROL AT THE OUTLET STRUCTURE IN THE FORM OF A PLUNGE POOL LINED WITH RIP RAP WILL NEED TO BE INSTALLED TO ENSURE THE STRUCTURAL INTEGRITY OF THE OUTLET PIPE AND EMBANKMENT. · SPILLWAYS: THE PRINCIPAL SPILLWAY SHOULD BE DESIGNED TO MOVE WATER THROUGH THE DAM TO AN OUTLET AT THE BASE OF THE DAM DURING NORMAL FLOW CONDITIONS. THE OUTFLOW SHOULD BE RELEASED INTO A PLUNGE POOL. GRATES AND GUARDS SHOULD BE USED TO KEEP DEBRIS FROM ENTERING AND CLOGGING THE PIPES IN ADDITION TO KEEPING ANIMALS OUT. TYPICALLY, EMERGENCY SPILLWAYS ARE DESIGNED TO PASS FLOOD FLOW WITHIN A CONTROLLED AREA TO PREVENT OVERTOPPING. EARTH EMBANKMENT CONSTRUCTION -PAVEMENTS, TREES, UNDERBRUSH, TOPSOIL, ROOTS, AND OTHER DELETERIOUS MATERIALS SHOULD BE REMOVED FROM THE PROPOSED CONSTRICTION AREA. THE UPPER LAKE SHOULD BE DRAINED, AND THE STREAM CHANNEL SHOULD BE DIVERTED TO ALLOW DEMOLITION OF THE ROAD EMBANKMENT AND CONSTRUCTION OF THE NEW EMBANKMENT. TEMPORARY DEWATERING WILL BE NECESSARY TO MANAGE GROUNDWATER WITHIN THE NEW EMBANKMENT FOOTPRINT. DEWATERING REQUIREMENTS WILL BE DETERMINED BY SITE CONDITIONS AT THE TIME OF NEW CONSTRUCTION. GROUNDWATER LEVELS SHOULD BE MAINTAINED AT LEAST 3 FEET BELOW PREVAILING EXCAVATION LEVELS. WE EXPECT THAT DIRECT PUMPING FROM TEMPORARY TRENCHES AND SUMPS WILL SUFFICE TO MAINTAIN TEMPORARY CONTROL OF THE GROUNDWATER. THE COST AND TIME REQUIRED FOR TEMPORARY GROUNDWATER CONTROL MUST BE CONSIDERED FOR BUDGETING PURPOSES. THE CONTRACTOR MUST BE PREPARED TO IMPLEMENT TEMPORARY DEWATERING AS NECESSARY TO ALLOW WORK IN EXCAVATION. WE RECOMMEND THAT THE CONSTRUCTION DOCUMENTS INCLUDE A MINIMUM PERFORMANCE SPECIFICATION FOR DEWATERING. THIS SPECIFICATION SHOULD REQUIRE SPECIFIC RESULTS FROM DEWATERING RATHER THAN DICTATE A DEWATERING METHOD. A SAMPLE GUIDE SPECIFICATION IS INCLUDED IN THE APPENDIX AS EXHIBIT IN GENERAL, WE FEEL THAT EXHIBIT REPRESENTS THE MINIMUM SPECIFICATION FOR A PROJECT OF THIS SCOPE. -BASED ON OUR EXPERIENCE, WE EXPECT AREAS OF SOFT SOILS WITHIN THE FOUNDATION AREAS FOR THE NEW EMBANKMENT. AFTER EXPOSURE OF THE FOUNDATION FOR THE NEW EMBANKMENT, THE FOUNDATION AREA SHOULD BE OBSERVED GEO- HYDRO. ANY EXCESSIVELY SOFT FOUNDATION MATERIAL SHOULD BE REMOVED AND REPLACED WITH SUITABLE, WELL COMPACTED STRUCTURAL FILL. -TO REDUCE SEEPAGE ALONG THE PRINCIPAL SPILLWAY PIPE, THE TRENCH FOR THE PIPE MUST BE BACKFILLED WITH CONCRETE UP TO THE SPRINGLINE. THE TRENCH EXCAVATION SHOULD BE THOROUGHLY CLEANED TO AVOID LOOSE MATERIALS WHICH COULD CREATE VOIDS OR CONDUITS BETWEEN THE CONCRETE AND THE TRENCH SIDES AND BOTTOM. -ABOVE THE SPRINGLINE, THE BACKFILL SOILS OVER THE PRINCIPAL SPILLWAY PIPE SHOULD BE CAREFULLY COMPACTED WITH HAND OPERATED EQUIPMENT UNTIL ENOUGH COVER HAS BEEN PLACED TO ALLOW THE OPERATION OF CONVENTIONAL SELF-PROPELLED COMPACTION EQUIPMENT. -IN ADDITION TO PROPER BACKFILLING ALONG THE PRINCIPAL SPILLWAY TRENCH, WE RECOMMEND THAT ANTI SEEP COLLARS BE INSTALLED. ANTI SEEP COLLARS SHOULD FURTHER REDUCE SEEPAGE ALONG THE PRINCIPAL SPILLWAY PIPE TRENCH. CONSTRUCTION OF ANTI SEEP COLLARS AND BACKFILLING AROUND THE COLLARS IS OFTEN DIFFICULT AND LABOR INTENSIVE. SPECIAL ATTENTION SHOULD BE PAID TO PROPER BACKFILLING TO AVOID AREAS OF LOOSE SOIL WHICH MAY CREATE VOIDS OR CONDUITS. HAND OPERATED COMPACTION EQUIPMENT WILL BE REQUIRED FOR BACKFILLING AROUND ANTI SEEP COLLARS. -TYPICAL EARTHEN EMBANKMENT DAMS ARE CONSTRUCTED OF MATERIALS WITH HYDRAULIC CONDUCTIVITY ON THE ORDER OF 1 X 10^-6 CM/SEC OR LOWER. SOME DESIGNS MAY INCLUDE A CORE OF LESSER HYDRAULIC CONDUCTIVITY MATERIALS PROTECTED BY CONVENTIONAL FILL MATERIALS. ALTERNATELY, THE EMBANKMENT MAY BE CONSTRUCTED AS A HOMOGENEOUS MASS WITH SOILS THROUGHOUT THE EMBANKMENT HAVING THE SAME HYDRAULIC CONDUCTIVITY. -MATERIALS SELECTED FOR USE AS STRUCTURAL FILL SHOULD BE FREE OF ORGANIC MATTER AND OTHER DELETERIOUS MATERIALS. THE MATERIAL SHOULD NOT CONTAIN ROCKS HAVING DIAMETER OVER 3 INCHES. THE MOISTURE CONTENT OF SUITABLE BURROW SOILS SHOULD BE WET OPTIMUM FOR CONSTRUCTION OF THE EARTH EMBANKMENT. TYPICALLY, MOISTURE CONTENTS UP TO ABOUT 4 PERCENT POINTS ABOVE OPTIMUM WILL BE ADEQUATE FOR THIS APPLICATION. TIGHTER MOISTURE LIMITS MAY BE NECESSARY WITH CERTAIN SOILS. USE OF SOILS HAVING MOISTURE CONTENT DRY OF OPTIMUM IS NOT ACCEPTABLE. -SUITABLE FILL MATERIAL SHOULD BE PLACED IN THIN LIFTS (LIFT THICKNESS DEPENDS ON TYPE OF COMPACTION EQUIPMENT, BUT IN GENERAL, LIFTS OF 8 INCHES LOOSE MEASUREMENT ARE RECOMMENDED.) THE SOILS SHOULD BE COMPACTED BY HEAVY COMPACTION EQUIPMENT SUCH AS A CATERPILLAR 815 SHEEPSFOOT ROLLER. FILL MATERIALS SHOULD BE PLACED OVER AS LARGE AS AN AREA OF THE EMBANKMENT FOOTPRINT AS POSSIBLE AT ANY GIVEN TIME TO MINIMIZE VERTICALLY ORIENTED INTERFACES BETWEEN ZONES OF FILL PLACED AT DIFFERENT TIMES. AS THE EMBANKMENT IS CONSTRUCTED, FILL ON THE FACE OF THE SLOPES SHOULD BE COMPACTED BY OPERATING TRACK MOUNTED EQUIPMENT UP AND DOWN THE SLOPES. -AS THE EARTH EMBANKMENT IS CONSTRUCTED, NO PREVIOUS FILL LIFT SHOULD BE LEFT IN A SMOOTH CONDITION. SHOULD A SMOOTH CONDITION DEVELOP, SUCH AS RESULTS FROM THE RUBBER TIRED ROLLING, IT WILL BE NECESSARY TO SCARIFY THE EMBANKMENT SURFACE TO ASSURE ADEQUATE BONDING WITH THE NEXT LIFT OF FILL MATERIAL. ADDITIONALLY, DURING BREAKS IN CONSTRUCTION ACTIVITIES, SHOULD EXPOSED SUBGRADE BECOME OVERLY WET OR DRY, IT WILL BE NECESSARY TO BLADE THESE SOILS OFF, OR SCARIFY AND RECOMPACT THESE SOILS IN PLACE PRIOR TO PLACEMENT OF SUBSEQUENT FILL LAYERS. FILL PLACED ON THE FACE OF THE EXISTING SLOPES SHOULD BE ADEQUATELY BENCHED INTO THE EXISTING SLOPE TO PROVIDE A HORIZONTAL SURFACE FOR COMPACTION AND MINIMIZE THE CHANGES OF SLIPPAGE AT THE CUT/FILL INTERFACE. -WE RECOMMEND THAT STRUCTURAL FILL BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698.) GEO- HYDRO SHOULD OBSERVE PLACEMENT OF STRUCTURAL FILL ON A FULL-TIME BASIS AND PERFORM DENSITY TEST. NOTE: 98% STANDARD PROCTOR COMPACTION IS REQUIRED IN ALL AREAS OF FILL. GEOTECHNICAL ENGINEER TO OBSERVE PLACEMENT OF FILL DURING CONSTRUCTION. LAKE POND PIPE TRENCH TO BE FILLED WILL CONCRETE UP TO THE SPRINGLINE. NO TREE GROWTH ON DAMS. DAM IS TO MAINTAIN A GOOD STAND OF GRASS, AND TO BE MAINTAINED BY GORDON COUNTY TO PREVENT BRUSH AND TREE GROWTH. ---PAGE BREAK--- F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F BP: 0+00.00 PC: 0+75.74 PT: 1+07.66 PC: 1+47.53 PT: 2+49.11 PC: 3+96.77 PT: 4+07.14 PC: 5+49.42 PT: 6+10.16 40' 18.3' F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN 25' 25' ANCHOR ON LAND ANCHOR ON LAND ANCHOR ON LAND ANCHOR ON LAND 25' 25' Ss Su Ds1 Ds2 Du Ds3 Ss Su Ds1 Ds2 Du Ds3 Ss Su Ds1 Ds2 Du Ds3 Ss Su Ds1 Ds2 Du Ds3 Ss Su Ds1 Ds2 Du Ds3 Ss Su Ds1 Ds2 Du Ds3 Sd1-S Sd1-S Sd1-S Sd1-S Sd1-S DOUBLE ROW DOUBLE ROW DOUBLE ROW DOUBLE ROW DOUBLE ROW LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE Ds1 Ds2 Ds1 Ds2 Ds1 Ds2 Ds1 Ds2 Ds1 Ds2 Ds1 Ds2 St CONCRETE WASHOUT SAMPLING LOCATION SAMPLING LOCATION UPSTREAM Co 0+00 1+00 2+00 3+00 4+00 5+00 6+00 748 750 752 750 750 754 754 754 754 754 754 TOE OF PROPOSED SLOPE LIMITS OF FILL TOE OF PROPOSED SLOPE LIMITS OF FILL CONTRACTOR TO USE A SIPHON OR PUMP TO DRAW DOWN THE UPPER LAKE WATER LEVEL TO BELOW THE PROPOSED FILL LINE CONTRACTOR TO CONSTRUCT A COFFERDAM FOR FILL PLACEMENT IN THE LOWER LAKE. OR LOWER THE LAKE LEVEL AT THE OUTLET. LAKE OUTLET CONTROL 72" 1011A MANHOLE W/ PEDESTAL TOP 10'X10'X2' PLUNGE POOL A1 A2 48" RCP AREA TO BE RE-VEGETATED WITH BROOMSEDGE BLUESTREAM, EASTERN DAISY, AND FESUE. AREA TO BE RE-VEGETATED WITH BROOMSEDGE BLUESTREAM, EASTERN DAISY, AND FESUE. 740 738 752 750 736 C302 20 20 40 60 FEET SCALE: 1" = 20' 0 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA N EPD SITE MAP TOTAL AREA OF DISTURBANCE = 0.85 ACRES WETLAND DISTURBANCE = 0.168 ACRES OPEN WATER DISTURBANCE=0.149 ACRES STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.) WETLAND IMPACT AREA OPEN WATER IMPACT AREA STATE BUFFER IMPACT AREA ---PAGE BREAK--- F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F WATER TmD TaD DsA F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN 25' 25' ANCHOR ON LAND ANCHOR ON LAND ANCHOR ON LAND ANCHOR ON LAND 25' 25' Sd1-S Sd1-S Sd1-S Sd1-S Sd1-S DOUBLE ROW DOUBLE ROW DOUBLE ROW DOUBLE ROW DOUBLE ROW LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE Ds1 Ds2 Ds1 Ds2 Ds1 Ds2 Ds1 Ds2 Ds1 Ds2 Ds1 Ds2 Co WATER TmD TOTAL AREA OF DISTURBANCE = 0.85 ACRES WETLAND DISTURBANCE = 0.168 ACRES OPEN WATER DISTURBANCE=0.149 ACRES STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.) STONE Cd-S Co Co CONSTRUCTION EXIT DIVERSION Di TEMPORARY DOWNDRAIN STRUCTURE Dn1 (Label) Dn1 PERMANENT DOWNDRAIN STRUCTURE Dn2 (Label) Dn2 FILTER RING Fr Fr Rt RETRO FITTING SEDIMENT BARRIER Sd1 INLET SEDIMENT TRAP TEMPORARY SEDIMENT BASIN Sd3 St STORMDRAIN OUTLET PROTECTION St SURFACE ROUGHENING Su EROSION CONTROL MATTING AND BLANKETS Ss DISTURBED AREA STABILIZATION (WITH MULCHING ONLY) Ds1 DISTURBED AREA STABILIZATION (WITH TEMP SEEDING) Ds2 DISTURBED AREA STABILIZATION (WITH PERM SEEDING) Ds3 DISTURBED AREA STABILIZATION (SODDING) Ds4 DUST CONTROL ON DISTURBED AREAS Du Pm POLY- ACRYLAMIDE (PAM) Sd2-P INLET SEDIMENT TRAP Sd2-F CHECKDAM LEVEL II DESIGN PROF. CERT#000010458 C501 20 20 40 60 FEET SCALE: 1" = 20' 0 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA N INITIAL EROSION CONTROL PLAN INITIAL PHASE CONSTRUCTION SCHEDULE NOTES: · STAKE CLEARING LIMITS · PRIOR TO BEGINNING MASS CLEARING CONTRACTOR TO INSTALL SILT FENCE, TURBIDITY CURTAINS, AND CONSTRUCTION ENTRANCE. · INSTALL ALL EROSION CONTROL MEASURES AS SHOWN ON THE INITIAL PHASE PLAN (EROSION CONTROL MEASURES TO BE CONSTRUCTED AND FULLY FUNCTIONAL PRIOR TO ANY GRADING). · BEGIN DRAINING UPPER LAKE. · START STORMWATER MONITORING, INSPECTIONS, AND SAMPLING. INTERMEDIATE PHASE CONSTRUCTION SCHEDULE NOTES: · INSTALL CONCRETE WASHOUT AREA · AFTER UPPER LAKE HAS BEEN DRAINED BEGIN REMOVAL OF THE ROAD DAM AND EXISTING STORM PIPES. · DRAIN LOWER LAKE OR INSTALL COFFERDAM FOR PLACEMENT OF FILL. · BEGIN INSTALLING THE PROPOSED STORM PIPE OUTLET. · ENSURE ALL SILT FENCE AND TURBIDITY CURTAINS ARE FUNCTIONING AND MAINTAIN AS NEEDED. · INSTALL THE PLUNGE POOL AT THE PIPE OUTFALL. · CONSTRUCT ROAD DAM IMPERVIOUS CORE AND PLACE FILL. HAVE A GEOTECHNICAL ENGINEER ON SITE MONITORING THE COMPACTION. · PROVIDE DS1, DS2, & SS FOR AREAS THAT HAVE NOT BEEN DISTURBED FOR MORE THAN 14 DAYS AS GRADING PROGRESSES. · INSTALL SS & DS3 AS SOON AS THE DAM SLOPE IS ESTABLISHED. · MAINTAIN BMP'S AS NEEDED AND CONTINUE WITH STORMWATER MONITORING, INSPECTIONS, AND SAMPLING. FINAL PHASE CONSTRUCTION SCHEDULE NOTES: · MAINTAIN BMP'S AS GRADING PROGRESSES. · FINAL GRADE PROPOSED ROADWAY AND SLOPES · BEGIN INSTALLING BASE AND PAVING. · BEGIN INSTALLING GUARDRAIL. · BEGIN INSTALL PERMANENT VEGETATION AND LANDSCAPING, Ds3 & Ds4. · REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER SITE IS 100% STABILIZED. · REMOVE TURBIDITY CURTAINS FROM BOTH UPPER AND LOWER LAKE. · STRIP ROADWAY AND INSTALL ANY NECESSARY SIGNS. ---PAGE BREAK--- F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN FLOATING TURBIDITY CURTAIN 25' 25' ANCHOR ON LAND ANCHOR ON LAND ANCHOR ON LAND ANCHOR ON LAND 25' 25' Ss Su Ds1 Ds2 Du Ss Su Ds1 Ds2 Du Ss Su Ds1 Ds2 Du Ss Su Ds1 Ds2 Du Ss Su Ds1 Ds2 Du Ss Su Ds1 Ds2 Du Sd1-S Sd1-S Sd1-S Sd1-S Sd1-S DOUBLE ROW DOUBLE ROW DOUBLE ROW DOUBLE ROW DOUBLE ROW LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE St CONCRETE WASHOUT SAMPLING LOCATION SAMPLING LOCATION UPSTREAM Co 748 750 752 750 750 754 754 754 754 754 754 A1 A2 48" RCP 740 738 752 750 736 TOTAL AREA OF DISTURBANCE = 0.85 ACRES WETLAND DISTURBANCE = 0.168 ACRES OPEN WATER DISTURBANCE=0.149 ACRES STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.) STONE Cd-S Co Co CONSTRUCTION EXIT DIVERSION Di TEMPORARY DOWNDRAIN STRUCTURE Dn1 (Label) Dn1 PERMANENT DOWNDRAIN STRUCTURE Dn2 (Label) Dn2 FILTER RING Fr Fr Rt RETRO FITTING SEDIMENT BARRIER Sd1 INLET SEDIMENT TRAP TEMPORARY SEDIMENT BASIN Sd3 St STORMDRAIN OUTLET PROTECTION St SURFACE ROUGHENING Su EROSION CONTROL MATTING AND BLANKETS Ss DISTURBED AREA STABILIZATION (WITH MULCHING ONLY) Ds1 DISTURBED AREA STABILIZATION (WITH TEMP SEEDING) Ds2 DISTURBED AREA STABILIZATION (WITH PERM SEEDING) Ds3 DISTURBED AREA STABILIZATION (SODDING) Ds4 DUST CONTROL ON DISTURBED AREAS Du Pm POLY- ACRYLAMIDE (PAM) Sd2-P INLET SEDIMENT TRAP Sd2-F CHECKDAM LEVEL II DESIGN PROF. CERT#000010458 C502 20 20 40 60 FEET SCALE: 1" = 20' 0 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA N INTERMEDIATE EROSION CONTROL PLAN ---PAGE BREAK--- F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F 40' 18.3' F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F Ss Su Ds3 Ss Su Ds3 Ss Su Ds3 Ss Su Ds3 Ss Su Ds3 Ss Su Ds3 LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE St SAMPLING LOCATION SAMPLING LOCATION UPSTREAM 748 750 752 750 750 754 754 754 754 754 754 TOE OF PROPOSED SLOPE LIMITS OF FILL TOE OF PROPOSED SLOPE LIMITS OF FILL CONTRACTOR TO USE A SIPHON OR PUMP TO DRAW DOWN THE UPPER LAKE WATER LEVEL TO BELOW THE PROPOSED FILL LINE CONTRACTOR TO CONSTRUCT A COFFERDAM FOR FILL PLACEMENT IN THE LOWER LAKE. OR LOWER THE LAKE LEVEL AT THE OUTLET. LAKE OUTLET CONTROL 72" 1011A MANHOLE W/ PEDESTAL TOP 10'X10'X2' PLUNGE POOL A1 A2 48" RCP AREA TO BE RE-VEGETATED WITH BROOMSEDGE BLUESTREAM, EASTERN DAISY, AND FESUE. AREA TO BE RE-VEGETATED WITH BROOMSEDGE BLUESTREAM, EASTERN DAISY, AND FESUE. 740 738 752 750 736 TOTAL AREA OF DISTURBANCE = 0.85 ACRES WETLAND DISTURBANCE = 0.168 ACRES OPEN WATER DISTURBANCE=0.149 ACRES STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.) STONE Cd-S Co Co CONSTRUCTION EXIT DIVERSION Di TEMPORARY DOWNDRAIN STRUCTURE Dn1 (Label) Dn1 PERMANENT DOWNDRAIN STRUCTURE Dn2 (Label) Dn2 FILTER RING Fr Fr Rt RETRO FITTING SEDIMENT BARRIER Sd1 INLET SEDIMENT TRAP TEMPORARY SEDIMENT BASIN Sd3 St STORMDRAIN OUTLET PROTECTION St SURFACE ROUGHENING Su EROSION CONTROL MATTING AND BLANKETS Ss DISTURBED AREA STABILIZATION (WITH MULCHING ONLY) Ds1 DISTURBED AREA STABILIZATION (WITH TEMP SEEDING) Ds2 DISTURBED AREA STABILIZATION (WITH PERM SEEDING) Ds3 DISTURBED AREA STABILIZATION (SODDING) Ds4 DUST CONTROL ON DISTURBED AREAS Du Pm POLY- ACRYLAMIDE (PAM) Sd2-P INLET SEDIMENT TRAP Sd2-F CHECKDAM LEVEL II DESIGN PROF. CERT#000010458 C503 20 20 40 60 FEET SCALE: 1" = 20' 0 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA N FINAL EROSION CONTROL PLAN ---PAGE BREAK--- EROSION CONTROL NOTES & CHECKLIST LEVEL II DESIGN PROF. CERT#000010458 C504 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA EROSION CONTROL NOTES THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING. THE APPLICABLE PORTION OF THE PRIMARY PERMITTEES ES&PC PLAN IS TO BE PROVIDED TO EACH SECONDARY PERMITTEE PRIOR TO SECONDARY CONDUCTING ANY CONSTRUCTION ACTIVITY AND THAT EACH SECONDARY SHALL SIGN THE PLAN OR PORTION OF THE PLAN APPLICABLE TO THEIR SITE. LIST THE NAMES AND ADDRESSES OF ALL SECONDARY PERMITTEES. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST WEEKLY, AFTER EACH RAIN, AND REPAIRED AS NECESSARY. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED NECESSARY BY ON-SITE INSPECTION. ALL SILT FENCES MUST MEET THE REQUIREMENTS OF SECTION 171-TEMPORARY SILT FENCE FOR THE DEPARTMENT OF TRANSPORTATION, QUALIFIED PRODUCTS LIST #36. SILT FENCES SHALL NOT BE PLACED IN STREAM BUFFER OR FLOODPLAINS, UNLESS UTILIZED FOR THE CONSTRUCTION OF AN EXEMPT ACTIVITY (I.E. ROADWAY DRAINAGE STRUCTURES, SEWER/WATER CROSSINGS, OR DRAINAGE STRUCTURES) PER THE APPROVED PLANS. FOR SUCH DISTURBANCES WITHIN THE BUFFER, THE AREA SHALL BE IMMEDIATELY STABILIZED USING EROSION CONTROL MATTING AND/OR BLANKETS ONCE THE ACTIVITY IS COMPLETE. SEDIMENT STORAGE VOLUME (67 CY/ACRE) MUST BE INSTALLED PRIOR TO ANY OTHER LAND DISTURBANCE ACTIVITY AND IN PLACE UNTIL FINAL STABILIZATION OCCURS. FOR EACH SITE ON WHICH LAND DISTURBING ACTIVITY OCCURS, EACH ENTITY OR PERSON ACTING AS EITHER A PRIMARY, SECONDARY, OR TERTIARY PERMITTEE, AS DEFINED IN THE STATE GENERAL PERMIT, SHALL HAVE AS A MINIMUM ONE PERSON WHO IS IN RESPONSIBLE CHARGE OF EROSION AND SEDIMENTATION CONTROL ACTIVITIES ON BEHALF OF SAID ENTITY OR PERSON AND MEETS THE APPLICABLE (LEVEL 1A) EDUCATION OR TRAINING CERTIFICATION REQUIREMENTS (O.C.G.A. 12-7-19(A)(2)). ALL TEMPORARY AND PERMANENT SEEDING MUST BE PERFORMED AT THE APPROPRIATE SEASON. IN SUCH INSTANCES WHERE THE ESTABLISHMENT OF VEGETATION IS INOPPORTUNE DUE TO SEASON OR DROUGHT, DISTURBED AREAS SHALL BE TEMPORARILY STABILIZED USING 2”-4” OF MULCH (DS1). ADDITIONAL PLANTINGS WILL BE NECESSARY IF A SUFFICIENT STAND OF GRASS FAILS TO GROW. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE AT ALL TIMES. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, THE LIMITS OF LAND DISTURBANCE AND ALL STREAM BUFFERS SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS, OR OTHER APPROPRIATE MEANS. THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE THE APPROVED LIMITS INDICATED ON THE APPROVED PLANS. PRIOR TO ANY OTHER CONSTRUCTION, A STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED AT EACH POINT OF ENTRY TO OR EXIT FROM THE SITE OR ONTO ANY PUBLIC ROADWAY. THE FOLLOWING INITIAL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY OTHER CONSTRUCTION ACTIVITY. THE CONSTRUCTION EXIT, CONSISTING OF A MINIMUM PAD SIZE OF 20 FEET BY 50 FEET WITH A MINIMUM OF 6” THICK STONE, SHALL BE PLACED AS SHOWN ON THE PLAN. THE STONE SIZE SHOULD CONSIST OF COURSE AGGREGATE BETWEEN 1-1/2” & 3-1/2” IN DIAMETER AND OVERLAID ON A GEOTEXTILE UNDERLINER. THE GEOTEXTILE UNDERLINER SHALL MEET THE REQUIREMENTS OF AASHTO M288-96, SECTION 7.3 SEPARATION REQUIREMENTS. IMMEDIATELY AFTER THE ESTABLISHMENT OF CONSTRUCTION ENTRANCE/EXITS, ALL PERIMETER EROSION CONTROL AND TEMPORARY SEDIMENT BASINS SHALL BE INSTALLED AS SHOWN ON THE INITIAL PHASE EROSION CONTROL PLAN. SILT FENCE SHOULD BE INSTALLED AT THE PERIMETER OF THE DISTURBED AREA AS SHOWN ON THE PLAN. THE SILT FENCE SHOULD BE PLACED IN ACCORDANCE WITH THE MANUAL FOR EROSION CONTROL IN GEORGIA, TABLE 6-27.1. THE SILT FENCE SHOULD BE KEPT ERECT AT ALL TIMES AND REPAIRED WHEN REQUESTED BY THE SITE INSPECTOR OR THE PROJECT DESIGN PROFESSIONAL OF RECORD. SILT SHOULD BE REMOVED WHEN ACCUMULATION REACHES ½ HEIGHT OF THE BARRIER. THE PERIMETER SILT FENCE SHOULD BE INSPECTED DAILY FOR ANY FAILURES. ANY FAILURES OF SAID FENCING SHOULD BE REPAIRED IMMEDIATELY. STONE CHECK DAMS SHALL BE INSTALLED IN AREAS OF CONCENTRATED FLOWS AS SHOWN ON THE PLAN. TREE PROTECTION FENCING SHOULD BE INSTALLED PRIOR TO THE START OF ANY LAND DISTURBANCE ACTIVITY AND MAINTAINED UNTIL FINAL LANDSCAPE IS INSTALLED. THE TREE PROTECTION FENCING SHOULD BE INSPECTED DAILY. ANY FAILURES OF SAID FENCING SHOULD BE REPAIRED IMMEDIATELY. ADDITIONAL SILT BARRIERS MUST BE PLACED AS SHOWN ON THE PLAN AS ACCESS IS OBTAINED DURING CLEARING. NO GRADING SHALL TAKE PLACE UNTIL SILT BARRIER INSTALLATION AND SEDIMENT PONDS ARE CONSTRUCTED AS SHOWN ON THE CLEARING PHASE EROSION CONTROL PLAN. SEDIMENT AND EROSION CONTROL MEASURES SHOULD BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DEVICE. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION, WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1-3” OF STONE, AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLE ON TO PUBLIC ROADWAY OR INTO STORM DRAIN MUST BE REMOVED IMMEDIATELY. CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH MEASURES ARE CORRECTED BACK TO THE APPROVED EROSION CONTROL PLANS. THE SITE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES INCLUDING REPLACING OR REPAIRING ANY DAMAGED DEVICES DUE TO ANY CONSTRUCTION ACTIVITY BY OTHERS. EARTHWORK OPERATIONS IN THE VICINITY OF STREAM BUFFERS SHALL BE CAREFULLY CONTROLLED TO AVOID DUMPING OR SLOUGHING INTO THE BUFFER AREAS. SEDIMENT SHALL NOT BE WASHED INTO INLETS. IT SHALL BE REMOVED FROM THE SEDIMENT TRAPS AND DISPOSED OF AND STABILIZED SO THAT IT WILL NOT ENTER THE INLETS AGAIN. EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE APPROVED PLANS IF DRAINAGE PATTERNS DURING THE CONSTRUCTION ARE DIFFERENT FROM THE PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE DESIGN PROFESSIONAL IMMEDIATELY. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY BARRICADES WHILE ROADWAY FRONTAGE IMPROVEMENTS ARE BEING MADE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING BARRIERS AT THE TOE OF SLOPES UNDER CONSTRUCTION. THESE BARRIERS SHALL BE AS SHOWN IN THE PLANS. THESE BARRIERS MAY BE RELOCATED AND REUSED AFTER PERMANENT SLOPE STABILIZATION BECOMES FULLY ESTABLISHED. AS THEY ARE RELOCATED, ANY DEFECTIVE MATERIALS IN THE BARRIER SHALL BE REPLACED. IN ADDITION, ALL DEBRIS AND SILT AT THE PREVIOUS LOCATION SHALL BE REMOVED. CUT AND FILL SLOPES ARE NOT TO EXCEED “2H:1V”. INLET SEDIMENT PROTECTION MEASURES SHALL BE INSTALLED ON ALL STORM STRUCTURES AS THEY ARE CONSTRUCTED. SEE PLAN VIEW FOR SPECIFIC TYPE AND SEPARATE DETAILS FOR ADDITIONAL INFORMATION ON TYPE OF INLET PROTECTION SPECIFIED. STORM DRAIN OUTLET PROTECTION SHALL BE PLACED AT ALL OUTLET HEADWALLS AS SOON AS THE HEADWALL IS CONSTRUCTED. SEE DETAILS FOR ADDITIONAL INFORMATION. EROSION CONTROL NOTES LANDSCAPING 10 CLEAN UP 6 7 5 2 3 4 1 SANITARY SEWER INSTALL SEDIMENT MAINTAIN EROSION (TEMP.) (PERM.) INSTALLATION CLEARING AND CONTROLS GRADING ACTIVITY STORM DRAIN INSTALLATION CONTROL GRASS UTILITY INSTALLATION 5 3 4 2 1 AND PAVING FINAL 8 9 BLDG. CONST. 12 9 10 11 8 6 7 ANTICIPATED ACTIVITY SCHEDULE 29 ---PAGE BREAK--- C505 G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA SILT FENCE - TYPE SENSITIVE SIDE VIEW FRONT VIEW Sd1-S CRUSHED STONE CONSTRUCTION EXIT EXIT DIAGRAM NOTES: 1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS. 2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE DRAINAGE. 3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE). 4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'. 6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES. 8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE). 9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT REMOVE MUD AND DIRT. 10.MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ENTRANCE ELEVATION Co PIPE OUTLET TO WELL DEFINED CHANNEL PIPE OUTLET TO FLAT AREA NO WELL DEFINED CHANNEL RIPRAP OUTLET PROTECTION NOTES: 1. La IS THE LENGTH OF THE RIPRAP APRON. 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 3. IN A WELL-DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK (WHICHEVER IS LESS). 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND THE SOIL FOUNDATION. La D SECTION A-A FILTER BLANKET D 3d D La FILTER BLANKET PLAN SECTION A-A RIPRAP APRON PLAN A A RIPRAP APRON St 43 STRUCTURE Q100 V100 La W1 W2 (cfs) (fps) (ft) (ft) (ft) St - CALCULATIONS d50 (ft) DEPTH (ft) St # A1-48" RCP OUTFALL 100.32 10.85 30 12 20 1.50 2.0 1 Do (in) 48 SCALE: NONE ABOVE GROUND CONCRETE WASHDOWN A A SECTION A-A NOTES 1. AREA TO BE USED TO WASHDOWN TOOLS, CONCRETE MIXER CHUTES, HOPPERS AND THE REAR OF VEHICLES. WASHOUT OF THE DRUM AT CONSTRUCTION SITE IS PROHIBITED. 2. WASHDOWN FACILITY MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE ONCE WASHDOWN AREA IS 75% FULL. STRAW BALE BINDING WIRE 10 MIL PLASTIC LINING 2"X4" 'SOD' STAPLES (2 PER BALE) WOOD OR METAL STAKE (2 PER BALE) STRAW BALE (TYP.) STAKE (TYP.) VARIES 10' MIN. 10 MIL PLASTIC LINING STONE CHECK DAM CROSS SECTION PROFILE VIEW SPACING BETWEEN CHECK DAMS Cd-S TOTAL AREA OF DISTURBANCE = 0.85 ACRES WETLAND DISTURBANCE = 0.168 ACRES OPEN WATER DISTURBANCE=0.149 ACRES STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.) Know what'sbelow. before you dig. Call R 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] EROSION CONTROL DETAILS LEVEL II DESIGN PROF. CERT#000010458 ---PAGE BREAK--- C506 G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA EROSION VEGETATION PLAN 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] 1'-2" 1'-0" 6" 9" 1'-2' 1'-0" 15" 15'-20' 5' UPSTREAM TERMINAL TRANSVERSE CHECK SLOT TERMINAL STEP 1 : CUT TERMINAL SLOT STEP 2 : SNUG MAT INTO SLOT STEP 3 : A. STAKE MAT INTO SLOT. B. USE 1"x3" PRESSURE-TREATED BOARD TO BRACE MAT AGAINST VERTICAL CUT. C. BACKFILL AND COMPACT. STEP 4 : A. REVERSE MAT ROLL DIRECTION TO OVERLAY CHECK SLOT. B. STAKE MAT TO ANCHOR TERMINAL. STEP 1 : CUT CHECK SLOT. TEMPORARY STAKE MAT UNDER MODERATE TENSION. STEP 2 : WORK UPSTREAM ACROSS, CHECK SLOT LAP BACK 18". STEP 3 : TUCK MAT LAP INTO SLOT & STAKE. STEP 4 : BACKFILL AND PROGRESS UPSTREAM. PULL OUT TEMPORARY STAKES WHEN NO LONGER NEEDED FOR TENSIONING. STEP 1 : CUT TERMINAL SLOT. STEP 2 : STAKE MAT INTO SLOT. STEP 3 : BACKFILL TERMINAL SLOT. STEP 4 : A. ROLL MAT UPSTREAM OVER REFILLED TERMINAL. B. STAKE MAT DOWN TO ANCHOR TERMINAL. C. PROGRESS UPSTREAM WITH ROLL. SEE NOTE 3-8 INSTALLATION INSTRUCTIONS 1. START AT TERMINAL AND PROGRESS UPSTREAM. 2. FIRST ROLL IS CENTERED LONGITUDINALLY IN MID CHANNEL AND PINNED WITH TEMPORARY STAKES TO MAINTAIN ALIGNMENT. 3. SUBSEQUENT ROLLS FOLLOW IN STAGGERED SEQUENCE BEHIND FIRST ROLL. FOR ALIGNMENT TO CHANNEL CENTER. 4. WORK OUTWARDS FROM CHANNEL CENTER TO EDGE. 5. USE 3" OVERLAP AND STAKE AT 5' INTERVAL ALONG SEAMS. 6. USE 3" OVERLAPS AND SHINGLE TO CONNECT LINING AT ROLL ENDS. 5' 3' OVERLAP 5' 3" ROLL NO. 1 ROLL NO. 3 ROLL NO. 2 SEQUENTIAL ROLL RUN OUT IN CHANNELS STAKE 38" 9" 8" PICTORIAL VIEW OF TRANSVERSE SLOT INSTALLATION NOTES SITE PREPARATION AFTER THE SITE HAS BEEN SHAPED AND GRADED TO THE APPROVED DESIGN, PREPARE A FRIABLE SEEDBED RELATIVELY FREE FROM CLODS AND ROCKS MORE THAN ONE INCH IN DIAM ETER, AND ANY FOREIGN MATERIAL THAT WILL PREVENT CONTACT OF THE SOIL STABILIZATION MAT WITH THE SOIL SURFACE. SURFACE MUST BE SMOOTH TO ENSURE PROPER CONTACT OF BLANKETS OR MATTING TO THE SOIL SURFACE. IF NECESSARY, REDIRECT ANY RUNOFF FROM THE DITCH OR SLOPE DURING INSTALLATION. STAPLES THE FOLLOWING ARE CONSIDERED APPROPRIATE STAPLING AND STAKING MATERIALS. TEMPORARY BLANKETS THIS INCLUDES STRAW, EXCELSIOR, COCONUT FIBER, AND WOOD FIBER BLANKETS. STAPLES SHALL BE USED TO ANCHOR TEMPORARY BLANKETS. U-SHAPED WIRE (11 GAUGE OR GREATER) STAPLES WITH LEGS AT LEAST 6 INCHES IN LENGTH AND A CROWN OF ONE INCH OR APPROPRIATE BIODEGRADABLE STAPLES CAN BE USED. STAPLES SHALL BE OF SUFFICIENT THICKNESS FOR SOIL PENETRATION WITHOUT UNDUE DISTORTION. PERMANENT MATTING SOUND WOOD STAKES, 1X3 INCHES STOCK SAWN IN A TRIANGULAR SHAPE, SHALL BE USED. DEPENDING ON THE COMPACTION OF THE SOIL, SELECT STAKES WITH A LENGTH FROM 12 TO 18 INCHES. U-SHAPED STAPLES SHALL BE 11 GAUGE STEEL OR GREATER, WITH LEGS AT A MINIMUM OF 8 INCHES LENGTH WITH A 2 INCH CROWN. PLANTING LIME, FERTILIZER, AND SEED SHALL BE APPLIED IN ACCORDANCE WITH SEEDING OR OTHER TYPE OF PLANTING PLAN COMPLETED PRIOR TO INSTALLATION OF TEMPORARY COMBINATION BLANKETS OR JUTE MESH. FOR PERMANENT MATS, THE AREA MUST BE BROUGHT TO FINAL GRADE, PLOWED, LIMED, AND FERTILIZED. AFTER THE PERMANENT MAT HAS BEEN INSTALLED AND BACKFILLED, THE ENTIRE AREA SHALL BE GRASSED. REFER TO SPECIFICATION DS3 - DISTURBED AREA STABILIZATION ET(WITH PERMANENT VEGETATION). MAINTENANCE ALL EROSION CONTROL BLANKETS AND MATTING SHOULD BE INSPECTED PERIODICALLY FOLLOWING INSTALLATION, PARTICULARLY AFTER RAINSTORMS TO CHECK FOR EROSION AND UNDERMINING. ANY DISLOCATION OR FAILURE SHOULD BE REPAIRED IMMEDIATELY. IF WASHOUTS OR BREAKAGE OCCURS, REINSTALL THE MATERIAL AFTER REPAIRING DAMAGE TO THE SLOPE OR DITCH. CONTINUE TO MONITOR THESE AREAS UNTIL THEY BECOME PERMANENTLY STABILIZED. Ss EROSION CONTROL MATTING AND BLANKETS Ds1 DISTURBED AREA STABILIZATION WITH MULCHING Ds4 STABILIZATION WITH SODDING Du DUST CONTROL SOIL PREPARATION BRING SOIL SURFACE TO FINAL GRADE. CLEAR SURFACE OF TRASH, WOODY DEBRIS, STONES AND CLODS LARGER THAN APPLY SOD TO SOIL SURFACES ONLY AND NOT FROZEN SURFACES, OR GRAVEL TYPE SOILS. MIX FERTILIZER INTO SOIL SURFACE. FERTILIZE BASED ON SOIL TESTS OR GENERAL APPLICATION OF 10-10-10 @ 1000 LBS PER ACRE (1 LB /40 SQ. FT.) AGRICULTURAL LIME SHOULD BE APPLIED BASED ON SOIL TESTS OR AT A RATE OF 1 TO 2 TONS / ACRE. GRASS TYPE COOL SEASON GRASSES WARM SEASON GRASSES PLANTING YEAR 1ST 2ND MAINTENANCE 1ST 2ND MAINTENANCE FERTILIZER (NPK) 6-12-12 6-12-12 10-10-10 6-12-12 6-12-12 10-10-10 RATE (LBS/ ACRE) 1500 1000 400 1500 800 400 NITROGEN TOP DRESSING (LBS/ ACRE) 50-100 30 50-100 50-100 30 TEMPORARY METHODS MULCHES. SEE STANDARD DS1 - DISTURBED AREA STABILIZATION (WITH MULCHING ONLY). RESINS MAY BE USED INSTEAD OF ASPHALT TO BIND MULCH MATERIAL. REFER TO STANDARD TB-TACKIFIERS AND BINDERS. RESINS SUCH AS CURASOL OR TERRATACK SHOULD BE USED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. VEGETATIVE COVER. SEE STANDARD DS2 - DISTURBED AREA STABILIZATION (WITH TEMPORARY SEEDING). SPRAY-ON ADHESIVES. THESE ARE USED ON MINERAL SOILS (NOT EFFECTIVE ON MUCK SOILS). KEEP TRAFFIC OFF THESE AREAS. REFER TO STANDARD TB-TACKIFIERS AND BINDERS. TILLAGE. THIS PRACTICE IS DESIGNED TO ROUGHEN AND BRING CLODS TO THE SURFACE. IT IS AN EMERGENCY MEASURE WHICH SHOULD BE USED BEFORE WIND EROSION STARTS. IRRIGATION. THIS IS GENERALLY DONE AS AN EMERGENCY TREATMENT. SITE IS SPRINKLED WITH WATER UNTIL THE SURFACE IS WET. REPEAT AS NEEDED. BARRIERS. SOLID BOARD FENCES, SNOWFENCES, BURLAP FENCES, CRATE WALLS, BALES OF HAY AND SIMILAR MATERIAL CAN BE USED TO CONTROL AIR CURRENTS AND SOIL BLOWING. BARRIERS PLACED AT RIGHT ANGLES TO PREVAILING CURRENTS AT INTERVALS OF ABOUT 15 TIMES THEIR HEIGHT ARE EFFECTIVE IN CONTROLLING WIND EROSION. CALCIUM CHLORIDE. APPLY AT RATE THAT WILL KEEP SURFACE MOIST. MAY NEED RETREATMENT. PERMANENT METHODS PERMANENT VEGETATION. SEE STANDARD DS3 -DISTURBED AREA STABILIZATION (WITH PERMANENT VEGETATION). EXISTING TREES AND LARGE SHRUBS MAY AFFORD VALUABLE PROTECTION IF LEFT IN PLACE. TOPSOILING. THIS ENTAILS COVERING THE SURFACE WITH LESS EROSIVE SOIL MATERIAL. SEE STANDARD TP - TOPSOILING. STONE. COVER SURFACE WITH CRUSHED STONE OR COARSE GRAVEL. SEE STANDARD CR-CONSTRUCTION ROAD STABILIZATION. MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 14 DAYS OF DISTURBANCE. TEMPORARY GRASSING, INSTEAD OF MULCH, CAN BE APPLIED TO ROUGH GRADED AREAS THAT WILL BE EXPOSED FOR LESS THAN SIX MONTHS. IF AN AREA IS EXPECTED TO BE UNDISTURBED FOR LONGER THAN SIX MONTHS, PERMANENT PERENNIAL VEGETATION SHALL BE USED. IF OPTIMUM PLANTING CONDITIONS FOR TEMPORARY GRASSING IS LACKING, MULCH CAN BE USED AS A SINGULAR EROSION CONTROL DEVICE FOR UP TO SIX MONTHS BUT IT SHALL BE APPLIED AT THE APPROPRIATE DEPTH, ANCHORED, AND HAVE A CONTINUOUS 90% COVER OR GREATER OF THE SOIL SURFACE. REFER TO SPECIFICATION DS1-DISTURBED AREA STABILIZATION (WITH MULCHING ONLY). WHEN A HYDRAULIC SEEDER IS USED, SEEDBED PREPARATION IS NOT REQUIRED. WHEN USING CONVENTIONAL OR HANDSEEDING, SEEDBED PREPARATION IS NOT REQUIRED IF THE SOIL MATERIAL IS LOOSE AND NOT SEALED BY RAINFALL. WHEN SOIL HAS BEEN SEALED BY RAINFALL OR CONSISTS OF SMOOTH CUT SLOPES, THE SOIL SHALL BE PITTED, TRENCHED OR OTHERWISE SCARIFIED TO PROVIDE A PLACE FOR SEED TO LODGE AND GERMINATE. LIME AND FERTILIZER (TEMPORARY VEGETATION, DS-2) AGRICULTURAL LIME IS REQUIRED UNLESS SOIL TESTS INDICATE OTHERWISE. APPLY AGRICULTURAL LIME AT A RATE OF ONE TON PER ACRE. GRADED AREAS REQUIRE LIME APPLICATION. SOILS CAN BE TESTED TO DETERMINE IF FERTILIZER IS NEEDED. ON REASONABLY FERTILE SOILS OR SOIL MATERIAL, FERTILIZER IS NOT REQUIRED. FOR SOILS WITH VERY LOW FERTILITY, 500 TO 700 POUNDS OF 10-10-10 FERTILIZER OR THE EQUIVALENT PER ACRE (12-16 LBS./1,000 SQ. FT.) SHALL BE APPLIED. FERTILIZER SHOULD BE APPLIED BEFORE LAND PREPARATION AND INCORPORATED WITH A DISK, RIPPER OR CHISEL. LIME AND FERTILIZER RATES AND ANALYSIS (PERMANENT VEGETATION, DS-3) AGRICULTURAL LIME IS REQUIRED AT THE RATE OF ONE TO TWO TONS PER ACRE UNLESS SOIL TESTS INDICATE OTHERWISE. GRADED AREAS REQUIRE LIME APPLICATION. IF LIME IS APPLIED WITHIN SIX MONTHS OF PLANTING PERMANENT PERENNIAL VEGETATION, ADDITIONAL LIME IS NOT REQUIRED. AGRICULTURAL LIME SHALL BE WITHIN THE SPECIFICATIONS OF THE GEORGIA DEPARTMENT OF AGRICULTURE. INITIAL FERTILIZATION, NITROGEN, TOPDRESSING, AND MAINTENANCE FERTILIZER REQUIREMENTS FOR EACH SPECIES OR COMBINATION OF SPECIES ARE LISTED IN TABLE 6-5.1. MULCHING MULCH IS REQUIRED FOR ALL PERMANENT VEGETATION APPLICATIONS. MULCH APPLIED TO SEEDED AREAS SHALL ACHIEVE 75% SOIL COVER. SELECT THE MULCHING MATERIAL FROM THE FOLLOWING AND APPLY AS INDICATED: 1. DRY STRAW OR DRY HAY OF GOOD QUALITY AND FREE OF WEED SEEDS CAN BE USED. DRY STRAW SHALL BE APPLIED AT THE RATE OF 2 TONS PER ACRE. DRY HAY SHALL BE APPLIED AT A RATE OF 2 1/2 TONS PER ACRE. 2. WOOD CELLULOSE MULCH OR WOOD PULP FIBER SHALL BE USED WITH HYDRAULIC SEEDING. IT SHALL BE APPLIED AT THE RATE OF 500 POUNDS PER ACRE. DRY STRAW OR DRY HAY SHALL BE APPLIED (AT THE RATE INDICATED ABOVE) AFTER HYDRAULIC SEEDING. 3. ONE THOUSAND POUNDS OF WOOD CELLULOSE OR WOOD PULP FIBER, WHICH INCLUDES A TACKIFIER, SHALL BE USED WITH HYDRAULIC SEEDING ON SLOPES 3/4:1 OR STEEPER. 4. SERICEA LESPEDEZA HAY CONTAINING MATURE SEED SHALL BE APPLIED AT A RATE OF THREE TONS PER ACRE. 5. PINE STRAW OR PINE BARK SHALL BE APPLIED AT A THICKNESS OF 3 INCHES FOR BEDDING PURPOSES. OTHER SUITABLE MATERIALS IN SUFFICIENT QUANTITY MAY BE USED WHERE ORNAMENTALS OR OTHER GROUND COVERS ARE PLANTED. THIS IS NOT APPROPRIATE FOR SEEDED AREAS. 6. WHEN USING TEMPORARY EROSION CONTROL BLANKETS OR BLOCK SOD, MULCH IS NOT REQUIRED. 7. BITUMINOUS TREATED ROVING MAY BE APPLIED ON PLANTED AREAS ON SLOPES, IN DITCHES OR DRY WATERWAYS TO PREVENT EROSION. BITUMINOUS TREATED ROVING SHALL BE APPLIED WITHIN 24 HOURS AFTER AN AREA HAS BEEN PLANTED. APPLICATION RATES AND MATERIALS MUST MEET GEORGIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS. VEGETATION NOTES FERTILIZER RATES FOR PERMANENT VEGETATION (Ds-3) DEFINITION APPLYING PLANT RESIDUES OR OTHER SUITABLE MATERIALS, PRODUCED ON THE SITE IF POSSIBLE, TO THE SOIL SURFACE. CONDITIONS MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 14 DAYS OF DISTURBANCE. MULCH CAN BE USED AS A SINGULAR EROSION CONTROL DEVICE FOR UP TO SIX MONTHS, BUT IT SHALL BE APPLIED AT THE APPROPRIATE DEPTH, DEPENDING ON THE MATERIAL USED, ANCHORED, AND HAVE A CONTINUOUS 90% COVER OR GREATER OF THE SOIL SURFACE. MAINTENANCE SHALL BE REQUIRED TO MAINTAIN APPROPRIATE DEPTH AND 90 % COVER. TEMPORARY VEGETATION MAY BE EMPLOYED INSTEAD OF MULCH IF THE AREA WILL REMAIN UNDISTURBED FOR LESS THAN SIX MONTHS. IF AN AREA WILL REMAIN UNDISTURBED FOR GREATER THAN SIX MONTHS, PERMANENT VEGETATIVE TECHNIQUES SHALL BE EMPLOYED. SPECIFICATIONS MULCHING WITHOUT SEEDING THIS STANDARD APPLIED TO GRADES OR CLEARED AREAS WHERE SEEDINGS MAY NOT HAVE A SUITABLE GROWING SEASON TO PRODUCE AN EROSION RETARDANT COVER, BUT CAN BE STABILIZED WITH A MULCH COVER. SITE PREPARATION 1. GRADE TO PERMIT THE USE OF EQUIPMENT FOR APPLYING AND ANCHORING MULCH. 2. INSTALL NEEDED EROSION CONTROL MEASURES AS REQUIRED SUCH AS DIKES, DIVERSIONS, BERMS, TERRACES AND SEDIMENT BARRIERS. 3. LOOSEN COMPACT SOIL TO A MINIMUM DEPTH OF 3 INCHES. MULCHING MATERIALS SELECT ONE OF THE FOLLOWING MATERIALS AND APPLYING AT THE DEPTH INDICATED: 1. DRY STRAW OR HAY SHALL BE APPLIED AT A DEPTH OF 2 TO 4 INCHES PROVIDING COMPLETE SOIL COVERAGE. ONE ADVANTAGE OF THIS MATERIAL IS EASY APPLICATION. 2. WOOD WASTE (CHIPS, SAWDUST OR BARK) SHALL BE APPLIED AT A DEPTH OF 2 TO 3 INCHES. ORGANIC MATERIAL FROM THE CLEARING STAGE OF DEVELOPMENT SHOULD REMAIN ON SITE, BE CHIPPED, AND APPLIED AS MULCH. THIS METHOD OF MULCHING CAN GREATLY REDUCE EROSION CONTROL COSTS. 3. POLYETHYLENE FILM SHALL BE SECURED OVER BANKS OF STOCKPILED SOIL MATERIAL FOR TEMPORARY PROTECTION. THIS MATERIAL CAN BE SALVAGED AND REUSED. APPLYING MULCH WHEN MULCH IS USED WITHOUT SEEDING, MULCH SHALL BE APPLIED TO PROVIDE FULL COVERAGE OF THE EXPOSED AREA. 1. DRY STRAW OR HAY MULCH AND WOOD CHIPS SHALL BE APPLIED UNIFORMLY BY HAND OR BY MECHANICAL EQUIPMENT. 2. IF THE AREA WILL EVENTUALLY BE COVERED WITH PERENNIAL VEGETATION, 20-30 POUNDS OF NITROGEN PER ACRE IN ADDITION TO THE NORMAL AMOUNT SHALL BE APPLIED TO OFFSET THE UPTAKE OF NITROGEN CAUSED BY THE DECOMPOSITION OF THE ORGANIC MULCHES. 3. APPLY POLYETHYLENE FILM ON EXPOSED AREAS. ANCHORING MULCH 1. STRAW OR HAY MULCH CAN BE PRESSED INTO THE SOIL WITH A DISK HARROW WITH THE DISK SET STRAIGHT OR WITH A SPECIAL “PACKER DISK.” DISKS MAY BE SMOOTH OR SERRATED AND SHOULD BE 20 INCHES OR MORE IN DIAMETER AND 8 TO 12 INCHES APART. THE EDGES OF THE DISK SHOULD BE DULL ENOUGH NOT TO CUT THE MULCH BUT TO PRESS IT INTO THE SOIL LEAVING MUCH OF IT IN AN ERECT POSITION. STRAW OR HAY MULCH SHALL BE ANCHORED IMMEDIATELY AFTER APPLICATION. STRAW OR HAY MULCH SPREAD WITH SPECIAL BLOWER-TYPE EQUIPMENT MAY BE ANCHORED WITH EMULSIFIED ASPHALT (GRADE AE-5 OR SS-1). THE ASPHALT EMULSION SHALL BE SPRAYED ONTO THE MULCH AS IT IS EJECTED FROM THE MACHINE. USE 100 GALLONS OF EMULSIFIED ASPHALT AND 100 GALLONS OF WATER PER TON OF MULCH. TACKIFERS AND BINDERS CAN BE SUBSTITUTED FOR EMULSIFIED ASPHALT. PLEASE REFER TO SPECIFICATION TB-TACKIFERS AND BINDERS. PLASTIC MESH OR NETTING WITH MESH NO LARGER THAN ONE INCH BY ONE INCH SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS. 2. NETTING OF THE APPROPRIATE SIZE SHALL BE USED TO ANCHOR WOOD WASTE. OPENINGS OF THE NETTING SHALL NOT BE LARGER THAN THE AVERAGE SIZE OF THE WOOD WASTE CHIPS. 3. POLYETHYLENE FILM SHALL BE ANCHOR TRENCHED AT THE TOP AS WELL AS INCREMENTALLY AS NECESSARY. Ds2 DISTURBED AREA STABILIZATION WITH TEMPORARY SEEDING DEFINITION THE ESTABLISHMENT OF TEMPORARY VEGETATIVE COVER WITH FAST GROWING SEEDINGS FOR SEASONAL PROTECTION ON DISTURBED OR DENUDED AREA. CONDITIONS TEMPORARY GRASSING, INSTEAD OF MULCH, CAN BE APPLIED TO ROUGH GRADED AREAS THAT WILL BE EXPOSED FOR LESS THAN SIX MONTHS. TEMPORARY VEGETATIVE MEASURES SHOULD BE COORDINATED WITH PERMANENT MEASURES TO ASSURE ECONOMICAL AND EFFECTIVE STABILIZATION. MOST TYPES OF TEMPORARY VEGETATION ARE IDEAL TO USE AS COMPANION CROPS UNTIL THE PERMANENT VEGETATION IS ESTABLISHED. SEEDING RATES FOR TEMPORARY SEEDING *UNUSUAL SITE CONDITIONS MAY REQUIRE HEAVIER SEEDING RATES **SEEDING DATES MAY NEED TO BE ALTERED TO FIT TEMPERATURE VARIATIONS AND CONDITIONS SPECIFICATIONS GRADING AND SHAPING EXCESSIVE WATER RUN-OFF SHALL BE REDUCED BY PROPERLY DESIGNED AND INSTALLED EROSION CONTROL PRACTICES SUCH AS CLOSED DRAINS, DITCHES, DIKES, DIVERSIONS, SEDIMENT BARRIERS AND OTHERS. NO SHAPING OR GRADING IS REQUIRED IF SLOPES CAN BE STABILIZED BY HAND-SEEDED VEGETATION OR IF HYDRAULIC SEEDING EQUIPMENT IS TO BE USED. SEEDBED PREPARATION WHEN A HYDRAULIC SEEDER IS USED, SEEDBED PREPARATION IS NOT REQUIRED. WHEN USING CONVENTIONAL OR HANDSEEDING, SEEDBED PREPARATION IS NOT REQUIRED IF THE SOIL MATERIAL IS LOOSE AND NOT SEALED BY RAINFALL. WHEN SOIL HAS BEEN SEALED BY RAINFALL OR CONSISTS OF SMOOTH CUT SLOPES, THE SOIL SHALL BE PITTED, TRENCHED OR OTHERWISE SCARIFIED TO PROVIDE A PLACE FOR SEED TO LODGE AND GERMINATE. LIME AND FERTILIZER AGRICULTURAL LIME IS REQUIRED UNLESS SOIL TESTS INDICATE OTHERWISE. APPLY AGRICULTURAL LIME AT A RATE OF ONE TON PER ACRE. GRADED AREAS REQUIRE LIME APPLICATION. SOILS CAN BE TESTED TO DETERMINE IF FERTILIZER IS NEEDED. ON REASONABLY FERTILE SOILS OR SOIL MATERIAL, FERTILIZER IS NOT REQUIRED. FOR SOILS WITH VERY LOW FERTILITY, 500 TO 700 POUNDS OF 10-10-10 FERTILIZER OF THE EQUIVALENT PER ACRE (12-16 LBS./1,000 SQ.FT.) SHALL BE APPLIED. FERTILIZER SHOULD BE APPLIED BEFORE LAND PREPARATION AND INCORPORATED WITH A DISK, RIPPER OR CHISEL. SEEDING SELECT A GRASS OR GRASS-LEGUME MIXTURE SUITABLE TO THE AREA AND SEASON OF THE YEAR. SEED SHALL BE APPLIED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDRAULIC SEEDER (SLURRY INCLUDING SEED AND FERTILIZER). DRILL OR CULTIPACKER SEEDERS SHOULD NORMALLY PLACE SEED ONE-QUARTER TO ONE-HALF INCH DEEP. APPROPRIATE DEPTH OF PLANTING IS TEN TIMES THE SEED DIAMETER. SOIL SHOULD BE “RAKED” TO COVER SEED WITH SOIL IF SEEDED BY HAND. MULCHING TEMPORARY VEGETATION CAN, IN MOST CASES, IN ESTABLISHED WITHOUT THE USE OF MULCH. MULCH WITHOUT SEEDING SHOULD BE CONSIDERED FOR SHORT TERM PROTECTION. REFER TO DS1 - DISTURBED AREA STABILIZATION (WITHOUT MULCHING ONLY). IRRIGATION DURING TIMES OF DROUGHT, WATER SHALL BE APPLIED AT A RATE NOT CAUSING RUNOFF AND EROSION. THE SOIL SHALL BE THOROUGHLY WETTED TO A DEPTH THAT WILL INSURE GERMINATION OF THE SEED. SUBSEQUENT APPLICATIONS SHOULD BE MADE WHEN NEEDED. Ds3 DISTURBED AREA STABILIZATION WITH PERMANENT SEEDING DEFINITION THE PLANTING OF PERENNIAL VEGETATION SUCH AS TREES, SHRUBS, VINES, GRASSES, OR LEGUMES ON EXPOSED AREAS FOR FINAL PERMANENT STABILIZATION. PERMANENT PERENNIAL VEGETATION SHALL BE USED TO ACHIEVE FINAL STABILIZATION. CONDITIONS PERMANENT PERENNIAL VEGETATION IS USED TO PROVIDE A PROTECTIVE COVER FOR EXPOSED AREAS INCLUDING CUTS, FILLS, DAMS, AND OTHER DENUDED AREAS. SPECIFICATIONS GRADING AND SHAPING GRADING AND SHAPING MAY NOT BE REQUIRED WHERE HYDRAULIC SEEDING AND FERTILIZER EQUIPMENT IS TO BE USED. VERTICAL BANKS SHALL BE SLOPED TO ENABLE PLANT ESTABLISHMENT. WHEN CONVENTIONAL SEEDING AND FERTILIZING ARE TO BE DONE GRADE AND SHAPE WHERE FEASIBLE AND PRACTICAL, SO THAT EQUIPMENT CAN BE USED SAFELY AND EFFICIENTLY DURING SEEDBED PREPARATION, SEEDING, MULCHING AND MAINTENANCE OF THE VEGETATION. CONCENTRATIONS OF WATER THAT WILL CAUSE EXCESSIVE SOIL EROSION SHALL BE DIVERTED TO A SAFE OUTLET. DIVERSIONS AND OTHER TREATMENT PRACTICES SHALL CONFORM WITH THE APPROPRIATE STANDARDS AND SPECIFICATIONS. SEEDBED PREPARATION SEEDBED PREPARATION MAY NOT BE REQUIRED WHERE HYDRAULIC SEEDING AND FERTILIZING EQUIPMENT IS TO BE USED. WHEN CONVENTIONAL SEEDING IS TO BE USED, SEEDBED PREPARATION WILL BE DONE AS FOLLOWS: BROADCAST PLANTINGS 1.TILLAGE AT A MINIMUM, SHALL ADEQUATELY LOOSEN THE SOIL TO A DEPTH OF 4 TO 6 INCHES; ALLEVIATE COMPACTION; INCORPORATE LIME AND FERTILIZER; SMOOTH AND FIRM THE SOIL; ALLOW FOR THE PROPER PLACEMENT OF SEED, SPRIGS, OR PLANTS; AND ALLOW FOR THE ANCHORING OF STRAW OR HAY MULCH IF A DISK IS TO BE USED. 2.TILLAGE MAY BE DONE WITH ANY SUITABLE EQUIPMENT. 3.TILLAGE SHOULD BE DONE ON THE CONTOUR WHERE FEASIBLE. 4.ON SLOPES TOO STEEP FOR THE SAFE OPERATION OF TILLAGE EQUIPMENT, THE SOIL SURFACE SHALL BE PITTED OR TRENCHED ACROSS THE SLOPE WITH APPROPRIATE HAND TOOLS TO PROVIDE TWO PLACES 6 TO 8 INCHES APART IN WHICH SEED MAY LODGE AND GERMINATE. HYDRAULIC SEEDING MAY ALSO BE USED. INDIVIDUAL PLANTS 1.WHERE INDIVIDUAL PLANTS ARE TO BE SET, THE SOIL SHALL BE PREPARED BY EXCAVATING HOLES, OPENING FURROWS, OR DIBBLE PLANTING. 2.FOR NURSERY STOCK PLANTS, HOLES SHALL BE LARGE ENOUGH TO ACCOMMODATE ROOTS WITHOUT CROWDING. 3.WHERE PINE SEEDLINGS ARE TO BE PLANTED, SUBSOIL UNDER THE ROW 36 INCHES DEEP ON THE CONTOUR FOUR TO SIX MONTHS PRIOR TO PLANTING. SUBSOILING SHOULD BE DONE WHEN THE SOIL IS DRY, PREFERABLY IN AUGUST OR SEPTEMBER. PLANTING HYDRAULIC SEEDING MIX THE SEED (INOCULATED IF NEEDED), FERTILIZER, AND WOOD CELLULOSE OR WOOD PULP FIBER MULCH WITH WATER AND APPLY IN A SLURRY UNIFORMLY OVER THE AREA TO BE TREATED. APPLY WITHIN ONE HOUR AFTER THE MIXTURE IS MADE. CONVENTIONAL SEEDING SEEDING WILL BE DONE ON A FRESHLY PREPARED AND FIRMED SEEDBED. FOR BROADCAST PLANTING, USE A CULTIPACKER SEEDER, DRILL, ROTARY SEEDER, OTHER MECHANICAL SEEDER, OR HAND SEEDING TO DISTRIBUTE THE SEED UNIFORMLY OVER THE AREA TO BE TREATED. COVER THE SEED WITH 1/8 TO 1/4 INCH OF SOIL FOR SMALL SEED AND 1/2 TO 1 INCH FOR LARGE SEED WHEN USING A CULTIPACKER OR OTHER SUITABLE EQUIPMENT. NO-TILL SEEDING NO-TILL SEEDING IS A PERMISSIBLE INTO ANNUAL COVER CROPS WHEN PLANTING IS DONE FOLLOWING MATURITY OF THE COVER CROP OR IF THE TEMPORARY COVER STAND IS SPARSE ENOUGH TO ALLOW ADEQUATE GROWTH OF THE PERMANENT (PERENNIAL) SPECIES. NO-TILL SEEDING SHALL BE DONE WITH APPROPRIATE NO-TILL SEEDING EQUIPMENT. THE SEED MUST BE UNIFORMLY DISTRIBUTED AND PLANTED AT THE PROPER DEPTH. INDIVIDUAL PLANTS SHRUBS, VINES AND SPRIGS MAY BE PLANTED WITH APPROPRIATE PLANTERS OR HAND TOOLS. PINE TREES SHALL BE PLANTED MANUALLY IN THE SUBSOIL FURROW. EACH PLANT SHALL BE SET IN A MANNER THAT WILL AVOID CROWDING THE ROOTS. NURSERY STOCK PLANTS SHALL BE PLANTED AT THE SAME DEPTH OR DEEPER THAN THEY GREW AT THE NURSERY. THE TIPS OF VINES AND SPRIGS MUST BE AT OR ABOVE THE GROUND SURFACE. WHERE INDIVIDUAL HOLES ARE DUG, FERTILIZER SHALL BE PLACED IN THE BOTTOM OF THE HOLE, TWO INCHES OF SOIL SHALL BE ADDED AND THE PLANT SHALL BE SET IN THE HOLE. MULCHING MULCH IS REQUIRED FOR ALL PERMANENT VEGETATION APPLICATIONS. MULCH APPLIED TO SEEDED AREAS SHALL ACHIEVE 75% SOIL COVER. SELECT THE MULCHING MATERIAL FROM THE FOLLOWING AND APPLY AS INDICATED: 1. DRY STRAW OR DRY HAY OF GOOD QUALITY AND FREE OF WEED SEEDS CAN BE USED. DRY STRAW SHALL BE APPLIED AT THE RATE OF 2 TONS PER ACRE. DRY HAY SHALL BE APPLIED AT A RATE OF 2 1/2 TONS PER ACRE. 2. WOOD CELLULOSE MULCH OR WOOD PULP FIBER SHALL BE USED WITH HYDRAULIC SEEDING. IT SHALL BE APPLIED AT THE RATE OF 500 POUNDS PER ACRE. OR DRY HAY SHALL BE APPLIED (AT THE RATE INDICATED ABOVE) AFTER HYDRAULIC SEEDING. 3. ONE THOUSAND POUNDS OF WOOD CELLULOSE OR WOOD PULP FIBER, WHICH INCLUDES A TACKIFIER, SHALL BE USED WITH HYDRAULIC SEEDING ON SLOES OF 3/4 : 1 OR STEEPER. 4. SERICEA LESPEDEZA HAY CONTAINING MATURE SEED SHALL BE APPLIED AT A RATE OF THREE TONS PER ACRE. 5. PINE STRAW OR PINE BARK SHALL BE APPLIED AT A THICKNESS OF 3 INCHES FOR BEDDING PURPOSES. OTHER SUITABLE MATERIALS IN SUFFICIENT QUANTITY MAY BE USED WHERE ORNAMENTALS OR OTHER GROUND COVERS ARE PLANTED. THIS IS NOT APPROPRIATE FOR SEEDED AREAS. 6. WHEN USING TEMPORARY EROSION CONTROL BLANKETS OR BLOCK SOD, MULCH IS NOT REQUIRED. 7. BITUMINOUS TREATED ROVING MAY BE APPLIED ON PLANTED AREAS ON SLOPES, IN DITCHES OR DRY WATERWAYS TO PREVENT EROSION. BITUMINOUS TREATED ROVING SHALL BE APPLIED WITHIN 24 HOURS AFTER AN AREA HAS BEEN PLANTED. APPLICATION RATES AND MATERIALS MUST MEET GEORGIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS. WOOD CELLULOSE AND WOOD PULP FIBERS SHALL NOT CONTAIN GERMINATION OR GROWTH INHIBITING FACTORS. THEY SHALL BE EVENLY DISPERSED WHEN AGITATED IN WATER. THE FIBERS SHALL CONTAIN A DYE TO ALLOW VISUAL METERING AND AID IN UNIFORM APPLICATION DURING SEEDING. APPLY MULCH STRAW OR HAY MULCH WILL BE SPREAD UNIFORMLY WITHIN 24 HOURS AFTER SEEDING AND/OR PLANTING. THE MULCH MAY BE SPREAD BY BLOWER-TYPE SPREADING EQUIPMENT, OTHER SPREADING EQUIPMENT OR BY HAND. MULCH SHALL BE APPLIED TO COVER 75% OF THE SOIL SURFACE. WOOD CELLULOSE OR WOOD FIBER MULCH SHALL BE APPLIED UNIFORMLY WITH HYDRAULIC SEEDING EQUIPMENT. ANCHORING MULCH ANCHOR STRAW OR HAY MULCH IMMEDIATELY AFTER APPLICATION BY ONE OF THE FOLLOWING METHODS: 1.EMULSIFIED ASPHALT CAN BE SPRAYED UNIFORMLY ONTO THE MULCH AS IT IS EJECTED FROM THE BLOWER MACHINE OR SPRAYED ON THE MUCH IMMEDIATELY FOLLOWING MULCH APPLICATION WHEN STRAW OR HAY IS SPREAD BY METHODS OTHER THAN SPECIAL BLOWER EQUIPMENT. THE EQUIPMENT OF ASPHALT EMULSION AND WATER SHALL CONSIST OF A HOMOGENEOUS MIXTURE SATISFACTORY FOR SPRAYING. THE MIXTURE SHALL CONSIST OF 100 GALLONS OF GRADE SS-1H OR CSS-1H EMULSIFIED ASPHALT AND 100 GALLONS OF WATER PER TON OF MULCH. CARE SHALL BE TAKEN AT ALL TIMES TO PROTECT STATE WATER, THE PUBLIC, ADJACENT PROPERTY, PAVEMENTS, CURBS, SIDEWALKS, AND ALL OTHER STRUCTURES FROM ASPHALT DISCOLORATION. 2. HAY AND STRAW MULCH SHALL BE PRESSED INTO THE SOIL IMMEDIATELY AFTER THE MULCH IS SPREAD. A SPECIAL “PACKER DISK” OR DISK HARROW WITH THE DISKS SET STRAIGHT MAYBE USED. THE DISKS MAYBE SMOOTH OR SERRATED AND SHOULD BE 20 INCHES OR MORE IN DIAMETER AND 8 TO 12 INCHES APART. THE EDGES OF THE DISKS SHALL BE DULL ENOUGH TO PRESS THE MULCH INTO THE GROUND WITHOUT CUTTING IT, LEAVING MUCH OF IT IN AN ERECT POSITION. MULCH SHALL NOT BE PLOWED INTO THE SOIL. 3. TACKIFIERS OR BINDERS APPROVED BY GDOT SHALL BE APPLIED IN CONJUNCTION WITH OR IMMEDIATELY AFTER THE MULCH IS PREAD. TACKIFIERS SHALL BE MIXED AND APPLIED ACCORDING TO MANUFACTURER'S SPECIFICATIONS. REFER TO TB- TACKIFIERS AND BINDERS. 4. RYE OR WHEAT CAN BE INCLUDED WITH FALL AND WINTER PLANTINGS TO STABILIZE THE MULCH. THEY SHALL BE APPLIED AT A RATE OF ONE-QUARTER TO ONE HALF BUSHEL PER ACRE. 5. PLASTIC MESH OR NETTING WITH MESH NO LARGER THAN ONE INCH BY ONE INCH MAY BE NEEDED TO ANCHOR STRAW OR HAY MULCH ON UNSTABLE SOILS AND CONCENTRATED FLOW AREAS. THESE MATERIALS SHALL BE INSTALLED AND ANCHORED ACCORDING TO MANUFACTURER'S SPECIFICATIONS. IRRIGATION IRRIGATION SHALL BE APPLIED AT A RATE THAT WILL NOT CAUSE RUNOFF. SEEDING RATE FOR PERMANENT SEEDING *Unusual site conditions may require heavier seeding rates **Seeding dates may need to be altered to fit temperature variations and conditions Know what'sbelow. before you dig. Call R LEVEL II DESIGN PROF. CERT#000010458 APPROPRIATE SOD VARIETIES FOR MOUNTAIN; BLUE RIDGE; AND RIDGES AND VALLEYS. GRASS VARIETY GROWING SEASON BERMUDA COMMON TIFWAY TIFGREEEN, WARM WEATHER TIFLAWN TALL FESCUE KENTUCKY COOL WEATHER ---PAGE BREAK--- STORM WATER POLLUTION PREVENTION PLAN PROJECT SPECIFIC ES&PC PLAN CHECKLIST NOTES THE PROPOSED SITE CONSTRUCTION WILL NOT DISTURB MORE THAN 50 ACRES AT ONE TIME. 24-HOUR LOCAL CONTACT: STEVE PARRIS [PHONE REDACTED] [EMAIL REDACTED] PRIMARY PERMITTEE: GORDON COUNTY STEVE PARRIS 116 PUBLIC SAFETY DR CALHOUN, GA 30701 [PHONE REDACTED] [EMAIL REDACTED] TOTAL AREA OF DISTURBANCE = 0.85 ACRES WETLAND DISTURBANCE = 0.168 ACRES OPEN WATER DISTURBANCE=0.149 ACRES MID COORDINATES: N: 2113406.17, E: 1622173.74 DESCRIPTION AND NATURE OF THE CONSTRUCTION ACTIVITY THE PROJECT WILL CONSISTS OF THE REMOVAL AND REPLACEMENT OF AN EXISTING ROAD DAM. THE DAM IS IN NEED OF REPAIR DUE TO INADEQUATE SIDE SLOPES. THE ROAD DAM AND THE EXISTING OUTLET PIPES WILL BE REMOVED. THE EXISTING LAKE WILL NEED TO BE DRAINED IN ORDER TO PLACE FILL FOR THE PROPOSED DAM RESTORATION. FILL WILL BE PLACED WITHIN THE EXISTING LAKE OPEN WATERS, THEREFORE A CORP OF ENGINEERS PERMIT WILL BE REQUIRED ALONG WITH AN EPD BUFFER VARIANCE. CURRENTLY THE ROAD DAM CONSIST OF TREES AND SHRUBS WITH STEEP SIDE SLOPES. THE PROPOSED DAM WILL CONSIST OF A GOOD STAND OF GRASS WITH 2:1 SIDE SLOPES. A NEW LAKE OUTLET WILL BE INSTALLED. THE POLLUTANT SOURCES WILL BE SILT, SEDIMENT, AND OTHER SUSPENDED SOLIDS DURING THE CONSTRUCTION PROCESS. THE PROJECT'S INITIAL RECEIVING WATER IS AN UN-NAMED TRIBUTARY TO PINE LOG CREEK A WARM WATER STREAM. IT IS NOT AN IMPAIRED STREAM SEGMENT. THERE ARE SENSITIVE AREAS ON SITE, INCLUDING LAKES, RESIDENTIAL AREAS, WETLANDS, ETC. A CORP OF ENGINEERS AND EPD BUFFER VARIANCE ARE REQUIRED PRIOR TO CONSTRUCTION. THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT THE INSTALLATION OF INITIAL SEDIMENT STORAGE REQUIREMENTS, PERIMETER CONTROL BMPs, AND SEDIMENT BASINS IN ACCORDANCE WITH PART IV.A.5. WITHIN 7 DAYS AFTER INSTALLATION. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS. THERE WILL BE ENCROACHMENTS IN THE BUFFER, THEREFORE A BUFFER PERMIT IS REQUIRED. AMENDMENTS/REVISIONS TO THE EX&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON THE BMPs WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL. WASTE MATERIALS SHALL NOT BE DISCHARGED TO THE WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING. THE PROJECT DOES NOT DISCHARGE STORM WATER INTO AN IMPAIRED STREAM SEGMENT, OR WITHIN 1 LINEAR MILE UPSTREAM OF AND WITHIN THE SAME WATERSHED AS, ANY PORTION OF A BIOTA IMPAIRED STREAM SEGMENT. IF A TMDL IMPLEMENTATION PLAN FOR SEDIMENT HAS BEEN FINALIZED FOR THE IMPAIRED STREAM SEGMENT AT LEAST SIX MONTHS PRIOR TO SUBMITTAL OF NOI, THE ES&PC PLAN MUST ADDRESS ANY SITE-SPECIFIC CONDITIONS OR REQUIREMENTS INCLUDED IN THE TMDL IMPLEMENTATION PLAN. N/A CONCRETE TRUCK WASHING - AREA TO BE USED TO WASHDOWN TOOLS, CONCRETE MIXER CHUTES, HOPPERS AND THE REAR OF VEHICLES. WASHOUT OF THE DRUM AT CONSTRUCTION SITE IS PROHIBITED. BMP'S FOR PETROLEUM SPILLS AND LEAKS: LOCAL, STATE AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY POSTED AND PROCEDURES WILL BE MADE AVAILABLE TO SITE PERSONNEL. MATERIAL AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, BROOMS, DUSTPANS, MOPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST AND PROPERLY LABELED PLASTIC AND METAL WASTE CONTAINERS. SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED AFTER A SPILL AND ADJUSTED AS NECESSARY TO PREVENT FUTURE SPILLS. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. ALL SPILLS WILL BE REPORTED AS REQUIRED BY LOCAL, STATE AND FEDERAL REGULATIONS. FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER) OR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL RESPONSE CENTER (NRC) SHALL BE CONTACTED WITHIN 24 HOURS AT 1-[PHONE REDACTED]. FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE GEORGIA EPD WILL BE CONTACTED WITHIN 24 HOURS. FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE SPILL WILL BE CLEANED UP AND LOCAL AGENCIES WILL BE CONTACTED AS REQUIRED. THE CONTRACTOR SHALL NOTIFY THE DESIGN PROFESSIONAL WHO PREPARED THIS PLAN IF MORE THAN 1320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES CAPACITIES OF EQUIPMENT) OR IF ANY ONE PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660 GALLONS. THE CONTRACTOR WILL NEED A SPILL PREVENTION CONTAINMENT AND COUNTERMEASURES PLAN PREPARED BY THE LICENSED PROFESSIONAL. A DESCRIPTION OF MEASURES THAT WILL BE INSTALLED DURING THE CONSTRUCTION PROCESS TO CONTROL POLLUTANTS IN STORM WATER THAT WILL OCCUR AFTER CONSTRUCTION OPERATIONS HAVE BEEN COMPLETED. THE PROPOSED DAM PROJECT WILL HAVE PERMANENT VEGETATIVE COVER ON THE DAM, TO CONSIST OF NATIVE SPECIES. GORDON COUNTY WILL MAINTAIN THE ROAD DAM AFTER CONSTRUCTION IS COMPLETE TO ENSURE THE DAM REMAINS STABLE AND FREE FROM ANY TREES OR SHRUBS. 4 5 3 7 11 14 22 26 23 34 LEVEL II DESIGN PROF. CERT#000010458 C507 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA 6 9 THE FOLLOWING STATEMENT AND THE SIGNATURE OF THE DESIGN PROFESSIONAL MUST BE SHOWN ON THE ES&PC PLAN OR UNDER ES&PC NOTES. "I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY CONTROL ACT AND THE DOCUMENT "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA" (MANUAL) PUBLISHED BY THE GEORGIA SOIL AND WATER CONSERVATIONCOMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICH THE LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE SAMPLING OFTHE RECEIVING WATER(S) OR THE SAMPLING OF THE STORM WATER OUTFALLS AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICES AND SAMPLING METHODS IS EXPECTED TO MEET THE REQUIREMENTS CONTAINED IN THE GENERAL NPDES PERMIT NO. GAR 100001.". SIGNATURE DATE THE FOLLOWING STATEMENT AND THE SIGNATURE OF THE DESIGN PROFESSIONAL MUST BE SHOWN ON THE ES&PC PLAN OR UNDER ES&PCNOTES. "I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE VISIT TO THE LOCATIONS DESCRIBED HEREIN BY MYSELFOR MY AUTHORIZED AGENT, UNDER MY SUPERVISION." SIGNATURE DATE 5-2-23 5-2-23 12 13 15 16 17 18 19 20 21 24 25 DESCRIPTION OF THE PRACTICES THAT WILL BE USED TO REDUCE THE POLLUTANTS IN STORM WATER DISCHARGES CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS AND TARS WILL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES ON-SITE VEHICLE AND MACHINERY DAILY INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH EQUIPMENT. EQUIPMENT MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE WATER, NATURAL DRAINS AND STORMWATER DISCHARGE INLETS. IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO PREVENT/MINIMIZE SITE CONTAMINATION. DISCHARGE OF OILS, FUELS AND DISPOSAL AS REQUIRED BY LOCAL AND STATE REGULATIONS. PAINTS/FINISHES/SOLVENTS- ALL PRODUCTS WILL BE STORED IN SEALED ORIGINAL CONTAINERS WHEN NOT IN USE. EXCESS PRODUCT WILL NOT BE DISCHARGED TO THE STORM WATER COLLECTION SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS, AND PRODUCT CONTAINERS WILL BE DISPOSED OF ACCORDING TO MANUFACTURES SPECIFICATIONS AND RECOMMENDATIONS. CONCRETE TRUCK WASHING- AREA TO BE USED TO WASHDOWN TOOLS, CONCRETE MIXER CHUTES, HOPPERS AND THE REAR OF VEHICLES. WASHOUT OF THE DRUM AT CONSTRUCTION SITE IS PROHIBITED. FERTILZER/HERBICIDES- THESE PRODUCTS WILL BE APPLIED AT RATES THAT DO NOT EXCEED THE MANUFACTURE'S SPECIFICATIONS OR ABOVE THE GUIDELINES SET FORTH IN THE CROP ESTABLISHMENTS OR IN THE MANUAL FOR EROSION AND SEDIMENTS CONTROL IN GEORGIA. ANY STORAGE OF THESE MATERIALS WILL BE UNDER ROOF IN SEALED CONTAINERS. BUILDING MATERIALS- NO BUILDING OR CONSTRUCTION MATERIALS WILL BE BURIED OR DISPOSED ONSITE. ALL SUCH MATERIAL WILL BE DISPOSED OF IN PROPER WASTE DISPOSAL PROCEDURES. SEE THIS SHEET FOR CONSTRUCTION SCHEDULE. INSPECTIONS: a. PERMITTEE REQUIREMENTS 1. EACH DAY WHEN ANY TYPE OF CONSTRUCTION ACTIVITY HAS TAKEN PLACE AT A PRIMARY PERMITTEE'S SITE, CERTIFIED PERSONNEL PROVIDED BY THE PRIMARY PERMITTEE SHALL INSPECT: ALL AREAS AT THE PRIMARY PERMITTEE'S SITE WHERE PETROLEUM PRODUCTS ARE STORED, USED, OR HANDLED FOR SPILLS AND LEAKS FROM VEHICLES AND EQUIPMENT AND ALL LOCATIONS AT THE PRIMARY PERMITTEE'S SITE WHERE VEHICLES ENTER OR EXIT THE SITE FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING. THESE INSPECTIONS MUST BE CONDUCTED UNTIL A NOTICE OF TERMINATION IS SUBMITTED. 2. MEASURE AND RECORD RAINFALL WITHIN DISTURBED AREAS OF THE SITE THAT HAVE NOT MET FINAL STABILIZATION ONCE EVERY 24 HOURS EXCEPT ANY NON WORKING SATURDAY, NON WORKING SUNDAY, AND NON WORKING FEDERAL HOLIDAY. THE DATA COLLECTED FOR THE PURPOSE WITH COMPLIANCE OF THIS PERMIT SHALL BE REPRESENTATIVE OF THE MONITORED ACTIVITY. MEASUREMENT OF RAINFALL MAY BE SUSPENDED IF ALL AREAS OF THE SITE HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION. 3. CERTIFIED PERSONNEL (PROVIDED BY THE PRIMARY PERMITTEE) SHALL INSPECT THE FOLLOW AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.5 INCHES RAINFALL OR GREATER (UNLESS SUCH STORM ENDS AFTER 5:00 PM ON ANY FRIDAY OR ON ANY NON-WORKING SATURDAY, NON-WORKING SUNDAY OR ANY NON-WORKING FEDERAL HOLIDAY IN WHICH CASE THE INSPECTION SHALL BE COMPLETED BY THE END OF THE NEXT BUSINESS DAY AND/OR WORKING DAY, WHICHEVER OCCURS FIRST) : DISTURBED AREAS OF THE PRIMARY PERMITTEE'S CONSTRUCTION SITE ; AREAS USED BY THE PRIMARY PERMITTEE FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION ; AND STRUCTURAL CONTROL MEASURES. EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN APPLICABLE TO THE PRIMARY PERMITTEE'S SITE SHALL BE OBSERVED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATER(S). FOR AREAS OF A SITE THAT HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION, THE PERMITTEE MUST COMPLY WITH PART IV.D.4.A.(4). THESE INSPECTIONS MUST BE CONDUCTED UNTIL A NOTICE OF TERMINATION IS SUBMITTED. 4. CERTIFIED PERSONNEL (PROVIDED BY THE PRIMARY PERMITTEE) SHALL INSPECT AT LEAST ONCE PER MONTH DURING THE TERM OF THIS PERMIT UNTIL A NOTICE OF TERMINATION IS RECEIVED BY EPD) THE AREAS OF THE SITE THAT HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION. THESE AREAS SHALL BE INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM AND THE RECEIVING WATER(S). EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN SHALL BE OBSERVED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATER(S). 5. BASED ON THE RESULTS OF EACH INSPECTION, THE SITE DESCRIPTION AND THE POLLUTION PREVENTION AND CONTROL MEASURES IDENTIFIED IN THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN, THE PLAN SHALL BE REVISED AS APPROPRIATE NOT LATER THAN SEVEN CALENDAR DAYS FOLLOWING EACH INSPECTION. IMPLEMENTATION OF SUCH CHANGES SHALL BE MADE AS SOON AS PRACTICAL BUT IN NO CASE LATER THAN SEVEN CALENDAR DAYS FOLLOWING EACH INSPECTION. 6. A REPORT OF EACH INSPECTION THAT INCLUDES THE NAME(S) OF CERTIFIED PERSONNEL MAKING EACH INSPECTION, THE DATE(S) OF EACH INSPECTION, CONSTRUCTION PHASE INITIAL, INTERMEDIATE OR FINAL), MAJOR OBSERVATIONS RELATING TO THE IMPLEMENTATION OF THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN, AND ACTIONS TAKEN IN ACCORDANCE WITH PART IV.D.4.A.(5). OF THE PERMIT SHALL BE MADE AND RETAINED AT THE SITE OR BE READILY AVAILABLE AT A DESIGNATED ALTERNATE LOCATION UNTIL THE ENTIRE SITE OR THAT PORTION OF A CONSTRUCTION PROJECT THAT HAS BEEN PHASED HAS UNDERGONE FINAL STABILIZATION AND A NOTICE OF TERMINATION IS SUBMITTED TO EPD. SUCH REPORTS SHALL BE READILY AVAILABLE BY END OF THE SECOND BUSINESS DAY AND.OR WORKING DAY AND SHALL IDENTIFY ALL INCIDENTS OF BEST MANAGEMENT PRACTICES THAT HAVE NOT BEEN PROPERLY INSTALLED AND/OR MAINTAINED AS DESCRIBED IN THE PLAN. WHERE THE REPORT DOES NOT IDENTIFY ANY INCIDENTS, THE INSPECTION REPORT SHALL CONTAIN A CERTIFICATION THAT THE BEST MANAGEMENT PRACTICES ARE IN COMPLIANCE WITH THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN. THE REPORT SHALL BE SIGNED IN ACCORDANCE WITH PART V.G.2. OF THIS PERMIT. MAINTENANCE THE PLAN SHALL INCLUDE A DESCRIPTION OF PROCEDURES TO ENSURE THE TIMELY MAINTENANCE OF VEGETATION, EROSION AND SEDIMENT CONTROL MEASURES AND OTHER PROTECTIVE MEASURES IDENTIFIED IN THE SITE PLAN. SAMPLING FREQUENCY 1. THE PRIMARY PERMITTEE MUST SAMPLE IN ACCORDANCE WITH THE PLAN AT LEAST ONCE FOR EACH RAINFALL EVENT DESCRIBED BELOW. FOR A QUALIFYING EVENT, THE PERMITTEE SHALL SAMPLE AT THE BEGINNING OF ANY STORM WATER DISCHARGE TO A MONITORED RECEIVING WATER AND/OR FROM A MONITORED OUTFALL LOCATION WITHIN IN FORTY-FIVE (45) MINUTES OR AS SOON AS POSSIBLE. 2. HOWEVER, WHERE MANUAL AND AUTOMATIC SAMPLING ARE IMPOSSIBLE (AS DEFINED IN THIS PERMIT), OR ARE BEYOND THE PERMITTEE'S CONTROL, THE PERMITTEE SHALL TAKE SAMPLES AS SOON AS POSSIBLE, BUT IN NO CASE MORE THAN TWELVE (12) HOURS AFTER THE BEGINNING OF THE STORM WATER DISCHARGE. 3. SAMPLING BY THE PERMITTEE SHALL OCCUR FOR THE FOLLOWING QUALIFYING EVENTS: a. FOR EACH AREA OF THE SITE THAT DISCHARGES TO A RECEIVING WATER OR FROM AN OUTFALL, THE FIRST RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH WITH A STORM WATER DISCHARGE THAT OCCURS DURING NORMAL BUSINESS HOURS AS DEFINED IN THIS PERMIT AFTER ALL CLEARING AND GRUBBING OPERATIONS HAVE BEEN COMPLETED, BUT PRIOR TO COMPLETION OF MASS GRADING OPERATIONS, IN THE DRAINAGE AREA OF THE LOCATION SELECTED AS THE SAMPLING LOCATION; b. IN ADDITION TO ABOVE, FOR EACH AREA OF THE SITE THAT DISCHARGES TO A RECEIVING WATER OR RFOM AN OUTFALL, THE FIRST RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH WITH A STORM WATER DISCHARGE THAT OCCURS DURING NORMAL BUSINESS HOURS AS DEFINED IN THIS PERMIT EITHER 90 DAYS AFTER THE FIRST SAMPLING EVENT OR AFTER ALL MASS GRADING OPERATIONS HAVE BEEN COMPLETED, BUT PRIOR TO SUBMITTAL OF A NOT, IN THE DRAINAGE AREA OF THE LOCATION SELECTED AS THE SAMPLING LOCATION, WHICHEVER COMES FIRST; c. AT THE TIME OF SAMPLING PERFORMED PURSUANT TO AND ABOVE, IF BMPS IN ANY AREA OF THE SITE THAT DISCHARGES TO A RECEIVING WATER OR FROM AN OUTFALL ARE NOT PROPERLY DESIGNED, INSTALLED AND MAINTAINED, CORRECTIVE ACTION SHALL BE DEFINED AND IMPLEMENTED WITHIN TWO BUSINESS DAYS, AND TURBIDITY SAMPLES SHALL BE TAKEN FROM DISCHARGES FROM THAT REA OF THE SITE FOR EACH SUBSEQUENT RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH DURING NORMAL BUSINESS HOURS* UNTIL THE SELECTED TURBIDITY STANDARD IS ATTAINED, OR UNTIL POST-STORM EVENT INSPECTIONS DETERMINE THAT BMPS ARE PROPERLY DESIGNED, INSTALLED AND MAINTAINED; d. WHERE SAMPLING PURSUANT TO OR ABOVE IS REQUIRED BUT NOT POSSIBLE (OR NOT REQUIRED BECAUSE THERE WAS NO DISCHARGE), THE PERMITTEE, IN ACCORDANCE WITH PART IV.D.4.A.(6), MUST INCLUDE A WRITTEN JUSTIFICATION IN THE INSPECTION REPORT OF WHY SAMPLING WAS NOT PERFORMED. PROVIDING THIS JUSTIFICATION DOES NOT RELIEVE THE PERMITTEE OF ANY SUBSEQUENT SAMPLING OBLIGATIONS UNDER OR ABOVE; AND e. EXISTING CONSTRUCTION ACTIVITIES, I.E., THOSE THAT ARE OCCURRING ON OR BEFORE THE EFFECTIVE DATE OF THIS PERMIT, THAT HAVE MET THE SAMPLING REQUIRED BY ABOVE SHALL SAMPLE IN ACCORDANCE WITH THOSE EXISTING CONSTRUCTION ACTIVITIES THAT HAVE MET THE SAMPLING REQUIRED BY ABOVE SHALL NOT BE REQUIRED TO CONDUCT ADDITIONAL SAMPLING OTHER THAN AS REQUIRED BY ABOVE. · NOTE THAT THE PERMITTEE MAY CHOOSE TO MEET THE REQUIREMENTS OF AND ABOVE BY COLLECTION TURBIDITY SAMPLES FROM ANY RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH AND ALLOWS FOR SAMPLING AT ANY TIME OF THE DAY OR WEEK. NON-STORM WATER DISCHARGES. EXCEPT FOR FLOWS FROM FIRE FIGHTING ACTIVITIES, SOURCES OF NON-STORM WATER LISTED IN PART III.A.2. OF THIS PERMIT THAT ARE COMBINED WITH STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY MUST BE IDENTIFIED IN THE PLAN. THE PLAN SHALL IDENTIFY AND ENSURE THE IMPLEMENTATION OF APPROPRIATE POLLUTION PREVENTION MEASURES FOR THE NON-STORM WATER COMPONENT(S) OF THE D 28 29 36 30 31 32 33 34 35 SAMPLING REQUIREMENTS THIS PERMIT REQUIRES THE MONITORING OF NEPHELOMETRIC TURBIDITY IN RECEIVING WATER(S) OR OUTFALLS IN ACCORDANCE WITH THIS PERMIT. THIS PARAGRAPH SHALL NOT APPLY TO ANY LAND DISTURBANCE ASSOCIATED WITH THE CONSTRUCTION OF SINGLE-FAMILY HOMES WHICH ARE NOT PART OF A SUBDIVISION OR PLANNED COMMON DEVELOPMENT UNLESS FIVE ACRES OR MORE WILL BE DISTURBED. THE FOLLOWING PROCEDURES CONSTITUTE EPD'S GUIDELINES FOR SAMPLING TURBIDITY. a. SAMPLING REQUIREMENTS SHALL INCLUDE THE FOLLOWING: 1. A USGS TOPOGRAPHIC MAP, A TOPOGRAPHIC MAP OR A DRAWING (REFERRED TO AS A TOPOGRAPHIC MAP) THAT IS A SCALE EQUAL TO OR MORE DETAILED THAN A 1:24000 MAP SHOWING THE LOCATION OF THE SITE OR THE STAND ALONE CONSTRUCTION; THE LOCATION OF ALL PERENNIAL AND INTERMITTENT STREAMS AND OTHER WATER BODIES AS SHOWN ON A USGS TOPOGRAPHIC MAP, AND ALL OTHER PERENNIAL AND INTERMITTENT STREAMS AND OTHER WATER BODIES LOCATED DURING MANDATORY FIELD VERIFICATION, INTO WHICH THE STORM WATER IS DISCHARGED AND THE RECEIVING WATER AND/OR OUTFALL SAMPLING LOCATIONS. WHEN THE PERMITTEE HAS CHOSEN TO USE A USGS TOPOGRAPHIC MAP AND THE RECEIVING WATER(S) IS NOT SHOWN ON THE USGS TOPOGRAPHIC MAP, THE LOCATION OF THE RECEIVING WATER(S) MUST BE HAND-DOWN ON THE USGS TOPOGRAPHIC MAP FROM WHERE THE STORM WATER(S) ENTERS THE RECEIVING WATER(S) TO THE POINT WHERE THE RECEIVING WATER(S) COMBINES WITH THE FIRST BLUE LINE STREAM SHOWN ON THE USGS TOPOGRAPHIC MAP; 2. A WRITTEN NARRATIVE OF SITE SPECIFIC ANALYTICAL METHODS USED TO COLLECT, HANDLE AND ANALYZE THE SAMPLES INCLUDING QUALITY CONTROL/QUALITY ASSURANCE PROCEDURES. THIS NARRATIVE MUST INCLUDE PRECISE SAMPLING METHODOLOGY FOR EACH SAMPLING LOCATION; 3. WHEN THE PERMITTEE HAS DETERMINED THAT SOME OR ALL OUTFALLS WILL BE SAMPLED, A RATIONALE MUST BE INCLUDED ON THE PLAN FOR THE NTU LIMIT(S) SELECTED FROM APPENDIX B. THIS RATIONALE MUST INCLUDE THE SIZE OF THE CONSTRUCTION SITE, THE CALCULATION OF THE SIZE OF THE SURFACE WATER DRAINAGE AREA, AND THE TYPE OF RECEIVING WATER(S) TROUT STREAM OR SUPPORTING WARM WATER FISHERIES); AND 4. ANY ADDITIONAL INFORMATION EPD DETERMINES NECESSARY TO BE PART OF THE PLAN. EPD WILL PROVIDE WRITTEN NOTICE TO THE PERMITTEE OF THE INFORMATION NECESSARY AND THE TIME LINE FOR SUBMITTAL. b. SAMPLE TYPE. ALL SAMPLING SHALL BE COLLECTED BY “GRAB SAMPLES” AND THE ANALYSIS OF THESE SAMPLES MUST BE CONDUCTED IN ACCORDANCE WITH METHODOLOGY AND TEST PROCEDURES ESTABLISHED BY 40 CFR PART 136 (UNLESS OTHER TEST PROCEDURES HAVE BEEN APPROVED); THE GUIDANCE DOCUMENT TITLED “NPDES STORM WATER SAMPLING GUIDANCE DOCUMENT, EPA 833-B-92-001” AND GUIDANCE DOCUMENTS THAT MAY BE PREPARED BY THE EPD. 1. SAMPLE CONTAINERS SHOULD BE LABELED PRIOR TO COLLECTING THE SAMPLES. 2. SAMPLES SHOULD BE WELL MIXED BEFORE TRANSFERRING TO A SECONDARY CONTAINER. 3. LARGE MOUTH, WELL CLEANED AND RINSED GLASS OR PLASTIC JARS SHOULD BE USED FOR COLLECTING SAMPLES. THE JARS SHOULD BE CLEANED THOROUGHLY TO AVOID CONTAMINATION. 4. MANUAL, AUTOMATIC OR RISING STAGE SAMPLING MAY BE UTILIZED. SAMPLES REQUIRED BY THIS PERMIT SHOULD BE ANALYZED IMMEDIATELY, BUT IN NO CASE LATER THAN 48 HOURS AFTER COLLECTION. HOWEVER, SAMPLES FROM AUTOMATIC SAMPLERS MUST BE COLLECTED NO LATER THAN THE NEXT BUSINESS DAY AFTER THEIR ACCUMULATION, UNLESS FLOW THROUGH AUTOMATED ANALYSIS IS UTILIZED. IF AUTOMATIC SAMPLING IS UTILIZED AND THE AUTOMATIC SAMPLER IS NOT ACTIVATED DURING THE QUALIFYING EVENT, THE PERMITTEE MUST UTILIZE MANUAL SAMPLING OR RISING STAGE SAMPLING DURING THE NEXT QUALIFYING EVENT. DILUTION OF SAMPLES IS NOT REQUIRED. SAMPLES MAY BE ANALYZED DIRECTLY WITH A PROPERLY CALIBRATED TUBIDIMETER. SAMPLES ARE NOT REQUIRED TO BE COOLED. 5. SAMPLING AND ANALYSIS OF THE RECEIVING WATER(S) OR OUTFALLS BEYOND THE MINIMUM FREQUENCY STATED IN THIS PERMIT MUST BE REPORTED TO EPD AS SPECIFIED IN PART IV.E SEE APPENDIX B ON THIS SHEET SEE SHEETS C501-C503 FOR LOCATION OF SAMPLING POINTS. RETENTION OF RECORDS 1. THE PRIMARY PERMITTEE SHALL RETAIN THE FOLLOWING RECORD AT THE CONSTRUCTION SITE OR THE RECORDS SHALL BE READILY AVAILABLE AT A DESIGNATED ALTERNATE LOCATION FROM COMMENCEMENT OF CONSTRUCTION UNTIL SUCH TIME AS A NOT IS SUBMITTED IN ACCORDANCE WITH PART VI: a. A COPY OF ALL NOTICES OF INTENT SUBMITTED TO EPD; b. A COPY OF THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN REQUIRED BY THIS PERMIT; c. THE DESIGN PROFESSIONAL'S REPORT OF THE RESULTS OF THE INSPECTION CONDUCTED IN ACCORDANCE WITH PART IV.A.5. OF THIS PERMIT; d. A COPY OF ALL SAMPLING INFORMATION, RESULTS, AND REPORTS REQUIRED BY THIS PERMIT; e. A COPY OF ALL INSPECTION REPORTS GENERATED IN ACCORDANCE WITH PART IV.D.4.A. OF THIS PERMIT; f. A COPY OF ALL VIOLATION SUMMARIES AND VIOLATION SUMMARY REPORTS GENERATED IN ACCORDANCE WITH PART III.D.2. OF THIS PERMIT; AND g. DAILY RAINFALL INFORMATION COLLECTED IN ACCORDANCE WITH PART IV.D.4.A.(2). OF THIS PERMIT. 2. COPIES OF ALL NOTICES OF INTENT, NOTICES OF TERMINATION, INSPECTION REPORTS, SAMPLING REPORTS (INCLUDING ALL CALIBRATION AND MAINTENANCE RECORDS AND ALL ORIGINAL STRIP CHART RECORDINGS FOR CONTINUOUS MONITORING INSTRUMENTATION) OR OTHER REPORTS REQUESTED BY THE EPD, EROSION, SEDIMENTATION AND POLLUTION CONTROL PLANS, RECORDS OF ALL DATA USED TO COMPLETE THE NOTICE OF INTENT TO BE COVERED BY THIS PERMIT AND ALL OTHER RECORDS REQUIRED BY THIS PERMIT SHALL BE RETAINED BY THE PERMITTEE WHO EITHER PRODUCED OR USED IT FOR A PERIOD OF AT LEAST THREE YEARS FROM THE DATE THAT THE NOT IS SUBMITTED IN ACCORDANCE WITH PART VI. OF THIS PERMIT. THESE RECORDS MUST BE MAINTAINED AT THE PERMITTEE'S PRIMARY PLACE OF BUSINESS OR AT A DESIGNATED ALTERNATIVE LOCATION ONCE THE CONSTRUCTION ACTIVITY HAS CEASED AT THE PERMITTED SITE. THIS PERIOD MAY BE EXTENDED BY REQUEST OF THE EPD AT ANY TIME UPON WRITTEN NOTIFICATION TO THE PERMITTEE. INITIAL PHASE CONSTRUCTION SCHEDULE NOTES: · STAKE CLEARING LIMITS · PRIOR TO BEGINNING MASS CLEARING CONTRACTOR TO INSTALL SILT FENCE, TURBIDITY CURTAINS, AND CONSTRUCTION ENTRANCE. · INSTALL ALL EROSION CONTROL MEASURES AS SHOWN ON THE INITIAL PHASE PLAN (EROSION CONTROL MEASURES TO BE CONSTRUCTED AND FULLY FUNCTIONAL PRIOR TO ANY GRADING). · BEGIN DRAINING UPPER LAKE. · START STORMWATER MONITORING, INSPECTIONS, AND SAMPLING. INTERMEDIATE PHASE CONSTRUCTION SCHEDULE NOTES: · INSTALL CONCRETE WASHOUT AREA · AFTER UPPER LAKE HAS BEEN DRAINED BEGIN REMOVAL OF THE ROAD DAM AND EXISTING STORM PIPES. · DRAIN LOWER LAKE OR INSTALL COFFERDAM FOR PLACEMENT OF FILL. · BEGIN INSTALLING THE PROPOSED STORM PIPE OUTLET. · ENSURE ALL SILT FENCE AND TURBIDITY CURTAINS ARE FUNCTIONING AND MAINTAIN AS NEEDED. · INSTALL THE PLUNGE POOL AT THE PIPE OUTFALL. · CONSTRUCT ROAD DAM IMPERVIOUS CORE AND PLACE FILL. HAVE A GEOTECHNICAL ENGINEER ON SITE MONITORING THE COMPACTION. · PROVIDE DS1, DS2, & SS FOR AREAS THAT HAVE NOT BEEN DISTURBED FOR MORE THAN 14 DAYS AS GRADING PROGRESSES. · INSTALL SS & DS3 AS SOON AS THE DAM SLOPE IS ESTABLISHED. · MAINTAIN BMP'S AS NEEDED AND CONTINUE WITH STORMWATER MONITORING, INSPECTIONS, AND SAMPLING. FINAL PHASE CONSTRUCTION SCHEDULE NOTES: · MAINTAIN BMP'S AS GRADING PROGRESSES. · FINAL GRADE PROPOSED ROADWAY AND SLOPES · BEGIN INSTALLING BASE AND PAVING. · BEGIN INSTALLING GUARDRAIL. · BEGIN INSTALL PERMANENT VEGETATION AND LANDSCAPING, Ds3 & Ds4. · REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER SITE IS 100% STABILIZED. · REMOVE TURBIDITY CURTAINS FROM BOTH UPPER AND LOWER LAKE. · STRIP ROADWAY AND INSTALL ANY NECESSARY SIGNS. SEE SHEET C501-503 SEE SHEET C501-503 NO ALTERNATIVE BMP'S HAVE BEEN SPECIFIED. USE OF ALTERNATIVE BMP FOR APPLICATION TO THE EQUIVALENT BMP LIST. PLEASE REFER TO APPENDIX A-2 OF THE MANUAL. THERE ARE STATE WATERS LOCATED ON OR WITHIN 200 FEET OF THE PROJECT SITE. THERE ARE NO TROUT STREAMS LOCATED ON OR WITHIN 200 FEET OF THE PROJECT SITE. THERE ARE WETLANDS LOCATED WITHIN THE PROJECT LIMITS. SHEET C501 & HYDRO STUDY FOR THE DELINEATION OF ONSITE DRAINAGE BASINS. SEE HYDROLOGY STUDY ATTACHED WITH THESE PLANS ESTIMATE OF RUNOFF COEFFICIENT: · EXISTING CONDITIONS=89 (EXISTING ROAD RIGHT OF WAY) · PROPOSED CONDITIONS=89 (PROPOSED ROAD RIGHT OF WAY) SEE SHEET C505 FOR OUTLET PROTECTION CALCULATIONS AND DETAIL SEE SHEET C501 FOR DELINEATION OF ONSITE SOILS SEE SHEET C501-503 FOR THE LIMITS OF DISTURBANCE SEE SHEET C508 FOR SEDIMENT STORAGE CALCULATIONS. SEE SHEET C501-503 FOR LOCATION OF BMP'S SEE SHEET C505 FOR LOCATION OF EROSION CONTROL DETAILS SEE SHEET C506 FOR THE VEGETATION PLAN. 37 38 40 39 42 41 43 44 45 46 47 48 49 50 51 52 DESCRIPTIION OF PRACTICES TO PROVIDE COVER FOR BUILDING MATERIALS AND BUILDING PRODECTS ON SITE. PLASTIC SHEETING TO COVER TEMPORARY ROOFS, TO COVER BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE,AND OTHER MATERIALS IN ORDER TO MINIMIZE EXPOSURE TO PRECIPITATION AND TO STORMWATER. 27 REPORTING 1. THE APPLICABLE PERMITTEES ARE REQUIRED TO SUBMIT THE SAMPLING RESULTS TO THE EPD AT THE ADDRESS SHOWN IN PART II.C. BY THE FIFTEENTH DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD. REPORTING PERIODS ARE MONTHS DURING WHICH SAMPLES ARE TAKEN IN ACCORDANCE WITH THIS PERMIT. SAMPLING RESULTS SHALL BE IN A CLEARLY LEGIBLE FORMAT. UPON WRITTEN NOTIFICATION, EPD MAY REQUIRE THE APPLICABLE PERMITTEE TO SUBMIT THE SAMPLING RESULTS ON A MORE FREQUENT BASIS. SAMPLING AND ANALYSIS OF ANY STORM WATER DISCHARGE(S) OR THE RECEIVING WATER(S) BEYOND THE MINIMUM FREQUENCY STATED IN THIS PERMIT MUST BE REPORTED IN A SIMILAR MANNER TO THE EPD. SIGNED IN ACCORDANCE WITH PART V.G.2. THE SAMPLING REPORTS MUST BE SUBMITTED TO EPD USING THE ELECTRONIC SUBMITTAL SERVICE PROVIDED BY THE EPD. SAMPLING REPORTS MUST BE SUBMITTED TO EPD UNTIL SUCH TIME AS A N.O.T IS SUBMITTED IN ACCORDANCE WITH PART VI. 2. ALL SAMPLING REPORTS SHALL INCLUDE THE FOLLOWING INFORMATION: a. THE RAINFALL AMOUNT, DATE, EXACT PLACE AND TIME OF SAMPLING OR MEASUREMENTS; b. THE NAME(S) OF THE CERTIFIED PERSONNEL WHO PERFORMED THE SAMPLING AND MEASUREMENTS; c. THE DATE(S) ANALYSES WERE PERFORMED; d. THE TIME(S) ANALYSES WERE INITIATED; e. THE NAME(S) OF THE CERTIFIED PERSONNEL WHO PERFORMED THE ANALYSES; f. REFERENCES AND WRITTEN PROCEDURES, WHEN AVAILABLE, FOR THE ANALYTICAL TECHNIQUES OR METHODS USED; g. THE RESULTS OF SUCH ANALYSES, INCLUDING THE BENCH SHEETS, INSTRUMENT READOUTS, COMPUTER DISKS OR TAPES, ETC., USED TO DETERMINE THESE RESULTS; h. RESULTS WHICH EXCEED 1000 NTU SHALL BE REPORTED AS “EXCEEDS 1000 NTU;” AND i. CERTIFICATION STATEMENT THAT SAMPLING WAS CONDUCTED AS PER THE PLAN. 3. ALL WRITTEN CORRESPONDENCE REQUIRED BY THIS PERMIT SHALL BE SUBMITTED BY RETURN RECEIPT CERTIFIED MAIL (OR SIMILAR SERVICE) TO THE APPROPRIATE DISTRICT OFFICE OF THE EPD ACCORDING TO THE SCHEDULE IN APPENDIX A OF THIS PERMIT. THE PERMITTEE SHALL RETAIN A COPY OF THE PROOF OF SUBMITTAL AT THE CONSTRUCTION SITE OR THE PROOF OF SUBMITTAL SHALL BE READILY AVAILABLE AT THE DESIGNATED LOCATION FROM COMMENCEMENT OF CONSTRUCTION UNTIL SUCH TIME AS A NOT IS SUBMITTED IN ACCORDANCE WITH PART VI. 0.85 ac A Primary or Alternate site Location Name of Receiving Water Applicable construction stage for monitoring Sampling Type (Outfall or Receiving Water) Surface Water Drainage Area (sq.mi.) Total Project Area Warm or Cold Water Stream Appendix B NTU value (Outfall Monitoring Only) Primary Point-A ALL Receiving Water Warm LOWER LAKE SOUTH OF PROJECT Location Description Monitoring Site 0.044 sq.mi. THE PRIMARY SITE SPECIFIED SHOULD BE USED AS THE INITIAL SAMPLING LOCATION. THE ALTERNATE SAMPLING SITES MAY BE USED IF ADDITIONAL SAMPLING IS REQUIRED AND/OR IF THE PRIMARY SAMPLING SITE IS NO LONGER WITHIN THE ACTIVE PHASE OF CONSTRUCTION. 75 PINE LOG CREEK ---PAGE BREAK--- DRAINAGE BASIN-A TOTAL AREA= 0.36 AC. REQ. SED STORAGE= 24.12 C.Y. PROVIDED SED. STORAGE= 82.50 C.Y. TURBIDITY CURTAIN STORAGE= 275 L.F.*0.3 C.Y./FOOT DRAINAGE BASIN-B TOTAL AREA= 0.06 AC. REQ. SED STORAGE= 4.02 C.Y. PROVIDED SED. STORAGE= 18 C.Y. SILT FENCE STORAGE= 60 L.F.*0.3 C.Y./FOOT DRAINAGE BASIN-C TOTAL AREA= 0.19 AC. REQ. SED STORAGE= 12.73 C.Y. PROVIDED SED. STORAGE= 71 C.Y. SILT FENCE STORAGE= 237 L.F.*0.3 C.Y./FOOT DRAINAGE BASIN-D TOTAL AREA= 0.40 AC. REQ. SED STORAGE= 26.80 C.Y. PROVIDED SED. STORAGE= 76 C.Y. TURBIDITY CURTAIN STORAGE= 254 L.F.*0.3 C.Y./FOOT DRAINAGE BASIN-E TOTAL AREA= 0.08 AC. REQ. SED STORAGE= 5.36 C.Y. PROVIDED SED. STORAGE= 34 C.Y. SILT FENCE STORAGE= 114 L.F.*0.3 C.Y./FOOT DRAINAGE BASIN-F TOTAL AREA= 0.05 AC. REQ. SED STORAGE= 2.38 C.Y. PROVIDED SED. STORAGE= 34 C.Y. SILT FENCE STORAGE= 114 L.F.*0.3 C.Y./FOOT TOTAL AREA OF DISTURBANCE = 0.85 ACRES WETLAND DISTURBANCE = 0.168 ACRES OPEN WATER DISTURBANCE=0.149 ACRES STATE BUFFER IMPACT=214,712.75 S.F. (0.338 AC.) LEVEL II DESIGN PROF. CERT#000010458 C508 20 20 40 60 FEET SCALE: 1" = 20' 0 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA N DRAINAGE MAP & SEDIMENT CALCS. ---PAGE BREAK--- A1 GA STD 1125 STA:2+82.24 TOP:744.92 INV IN:739.50 ST A P1 A2 LAKE OCS STA:2+82.24 TOP:751.30 INV OUT:740.00 ST A P1 ENERGY DISSIPATOR 10'X10'X2' PLUNGE POOL W/ 12" STONE PROPOSED 2:1 SLOPE EXISTING GROUND CENTERLINE 2" 9.5 MM SUPER PAVE 2" 19 MM SUPER PAVE 8" CRUSHED STONE (GAB) 6.5' SHOULDER 12' 12' 6.5' SHOULDER KEY TRENCH 10' 2' IMPERVIOUS CORE 1:1 SLOPE IMPERVIOUS CORE ANTI-SEEP COLAR 40' R.O.W. 24' ROAD LAKE LEVEL 739.50 EXISTING GROUND LAKE LEVEL 751.30 SECTION-A ST A P1 67.85 L.F. @ 0.74% 48" RCP 100-YEAR HGL LAKE OUTLET CONTROL 72" 1011A MANHOLE W/ PEDESTAL TOP C601 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA STORM PIPE NOTES: 1. THE DEPARTMENT OF TRANSPORTATION, STATE OF GEORGIA STANDARD "PIPE CULVERTS" NUMBER 1030D, LATEST EDITION SHALL BE USED IN DETERMINING THE CLASS OF REINFORCED CONCRETE PIPE OR GAUGE OF CORRUGATED STEEL PIPE OR TYPE 2 CORRUGATED ALUMINUM PIPE UNDER FILL AND THE METHOD OF BACKFILLING. 2. FIELD JOINTS FOR CORRUGATED PIPE SHALL BE MADE WITH BANDS OF THE SAME BASE METAL AND COATING AS THE CORRUGATED PIPE. BANDS SHALL BE OF THE HUGGER TYPE DESIGNED TO FULLY ENGAGE AT LEAST ONE ANNULAR CORRUGATION AT THE END OF EACH CORRUGATED PIPE AROUND IT'S ENTIRE CIRCUMFERENCE. MINIMUM BAND WITH SHALL EQUAL THE CENTERLINE LENGTH OF FOUR ANNULAR CORRUGATIONS. BANDS SHALL CONFORM TO CURRENT ASTM/AASHTO INDUSTRY STANDARDS AS TO SECURING BOLTS, THEIR NUMBER AND PLACEMENT. 3. CONCRETE PIPE SECTIONS MAY BE JOINED WITH BITUMINOUS PLASTIC CEMENT JOINTS, REBBER-TYPE GASKET JOINTS, O-RING GASKET JOINTS OR PRE-FORMED PLASTIC GASKET JOINTS. IN BITUMINOUS PLASTIC CEMENT JOINTS, THE ANNULAR SPACE SHALL BE FILLED WITH JOINT MATERIAL, AND THE INSIDE OF EACH JOINT WIPED SMOOTH. RUBBER-TYPE, O-RING, AND PRE-FORMED PLASTIC GASKET JOINTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 4. ALL CATCH BASINS, DROP INLETS OR OTHER DRAINAGE STRUCTURES SHALL COMPLY WITH THE LATEST STANDARDS APPROVED AND PROMULGATED BY THE GEORGIA DEPARTMENT OF TRANSPORTATION IN "STANDARDS SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES", LATEST EDITION. 5. HDPE PIPE SHALL BE ADVANCED DRAINAGE SYSTEMS, INC "N-12" SMOOTH INTERIOR DUAL WALL CORRUGATED PIPE OR APPROVED EQUAL. GRANULAR BACKFILL TO TOP OF PIPE. WATERTIGHT BELL AND SPIGOT GASKETED JOINTS MUST BE PROVIDED 6. PIPE ARE SCALED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. CONTRACTOR SHALL VERIFY PIPE LENGTH PRIOR TO ORDERING PIPE AND PRIOR TO CONSTRUCTION. 7. COMPACT ALL FILL AREAS ABOVE AND UNDER PIPE TO MIN. 98% STD. PROCTOR. 8. ALL ORGANICS AND TOP SOIL SHALL BE REMOVED FROM BACK FILL MATERIALS. STORM PROFILES NOTE: 98% STANDARD PROCTOR COMPACTION IS REQUIRED IN ALL AREAS OF FILL. GEOTECHNICAL ENGINEER TO OBSERVE PLACEMENT OF FILL DURING CONSTRUCTION. LAKE POND PIPE TRENCH TO BE FILLED WILL CONCRETE UP TO THE SPRINGLINE. NO TREE GROWTH ON DAMS. DAM IS TO MAINTAIN A GOOD STAND OF GRASS, AND TO BE MAINTAINED BY GORDON COUNTY TO PREVENT BRUSH AND TREE GROWTH. C' C SECTION C-C' PLAN VIEW TRENCH WIDTH VARIES NOTE: ANTI SEEP COLLARS REQUIRED FOR ALL PIPES WITHIN POND EMBANKMENT. USE CLASS-B CONCRETE, 3000 PSI. FLOW FLOW ANTI SEEP COLLAR CONCRETE ANTI-SEEP COLLAR TRENCH BOTTOM DISTANCE INTO DITCH BANK BOTH SIDES = 12" 1x PIPE DIAM. 12" 1'-0" SCALE: NONE STORM ANTI SEEP COLLAR 2' MIN. SCALE: NONE DETENTION POND EMBANKMENT 1 - SLOPES SHOWN ON GRADING PLAN ARE THE STEEPEST ALLOWABLE. 2 - CORE TO BE CLAY OR OTHER IMPERVIOUS MATERIAL. DEPTH OF CORE SHALL BE PER SECTION-A 3 - CORE SHALL BE CONSTRUCTED IN 6" MAX. LIFTS, AND COMPACTED TO 95% OF THE STANDARD PROCTOR. 4 - TOP WIDTH AS SHOWN ON SECTION-A. 5 - ANTI-SEEP COLLARS ARE REQUIRED. 6 - ALL JOINTS SHALL BE WATER-TIGHT UNDER MAXIMUM HYDROSTATIC LOAD AND JOINT EXTENSION. IMPERVIOUS CORE 1:1 SLOPE 2:1 SLOPE (MAX.) SEE GRADING PLAN FOR PROPOSED SLOPES TOP OF FILL BEDROCK OR OTHER IMPERVIOUS SURFACE ANTI-FLOTATION FOUNDATION SOLIDLY ANCHORED TO RISER OUTLOT CONTROL BOX STRUCTURE ORIGINAL ELEV. PEDESTAL TOP WITH MH RING AND COVER 10' MIN. PIPE DIAMETER ANTI-SEEP COLLAR KEY TRENCH BOTTOM OF POND SEE GRADING PLAN FOR TOP WIDTH D H 2:1 SLOPE (MAX.) SEE GRADING PLAN FOR PROPOSED SLOPES TOPWIDTH ---PAGE BREAK--- C602 24 HOUR CONTACT STEVE PARRIS [PHONE REDACTED] Know what'sbelow. before you dig. Call R G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA STORM DETAILS NOTE: 98% STANDARD PROCTOR COMPACTION IS REQUIRED IN ALL AREAS OF FILL. GEOTECHNICAL ENGINEER TO OBSERVE PLACEMENT OF FILL DURING CONSTRUCTION. LAKE POND PIPE TRENCH TO BE FILLED WILL CONCRETE UP TO THE SPRINGLINE. NO TREE GROWTH ON DAMS. DAM IS TO MAINTAIN A GOOD STAND OF GRASS, AND TO BE MAINTAINED BY GORDON COUNTY TO PREVENT BRUSH AND TREE GROWTH. BUOYANCY CALCULATION DISPLACED VOLUME=38.48 S.F. X 12.80 V.F.=492.54 C.F. BUOYANT FORCE=492.54 C.F. X 62.4 PCF=30,734.70 LBS WEIGHT OF STRUCTURE BASE=6"X38.48 S.F.=19.24 S.F. X 150 PCF=2,886 LBS TOP=6"X38.48 S.F.=19.24 S.F. X 150 PCF=2,886 LBS RISER WEIGHT=12.80 FT. X 10.21 S.F.=130.69 C.F. X 150 PCF=19,603.20 LBS BALLAST WEIGHT=28.27 S.F. X 1.5 V.F.=6360.75 LBS TOTAL STRUCTURE WEIGHT=31,736.00 LBS -A 18" CONCRETE BALLAST WILL BE POURED IN THE BOTTOM OF THE OUTLET STRUCTURE. ---PAGE BREAK--- C701 G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA Know what'sbelow. before you dig. Call R CONSTRUCTION DETAILS ---PAGE BREAK--- C701 G E O R G I A R E G I S T E R E D No. PE36309 PROFESSIONAL E N G I N E E R M A T T H E W B A I L E Y Group P.O. Box 4392 [PHONE REDACTED] Cartersville, Ga 30120 baileycivilgroup.com BAILEYcivil 23112 MT. OLIVE CHURCH ROAD DAM REPLACEMENT PROJECT FOR DATE PROJECT NUMBER REVISIONS MAY 3RD 2023 GORDON COUNTY 116 PUBLIC SAFETY DR CALHOUN, GA 30701 SHEET TITLE SHEET NUMBER MT. OLIVE CHURCH RD. GORDON COUNTY, GA Know what'sbelow. before you dig. Call R CONSTRUCTION DETAILS